Original source · versioned page text
SUPERSEDED - Compiled Approved Plans 51983 3225 15
The original of this document is very large (28.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 50, section 4. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn19
19
19
19
2.
2.
4.
2.
4.
4.
2.
2.
2.
2.
06
35
2.
4.
DP DP
7 3180 3220 2860
7
.4
.4
window
window
A A A A
11
11
W28
7
.4
window
3550
W
11
L3 -
Common Area
Common Area
APPROVED PLAN
W33
SLIDING PRVIACY SCREENS
02 02 02 02
W26
2950
SLIDING GLAZED DOOR
L3
BED 2 L2
51983.3225.15
W18 SLIDING PRIVACY
K
4590
95
95
4690
SCREENS ON TRACK TERRACE
4760
L2
1.
1.
40mm NRG GREENBOARD
90
BED 1
95
30 HASTINGS ST,
17
17
TO FUTURE DETAIL
1.
1.
NOOSA COUNCIL
2.
2.
15
15
CLADDING TO TIMBER FRAMED
9.
9.
15
15
NOOSA HEADS WALL TO SUPPLIERS DETAILS
9.
9.
L
ROBE
7155
TIMBER FRAMED ROOF WITH
LOT 17 RL 7.58
W25
MIN 1.2m HIGH
BALUSTRADE TO
FAMILY ROOM
RL 10.58 W32
1 AUGUST 2022
Distance:
SELECTED METAL DECK NEW STRUCTURAL FLOOR
9.37 m
COMPLY WITH BCA
A
L2 L3
9430
ROOFING- PITCH 5° 17 OVER EXISTING FLOORING IN REQUIREMENTS 17
ROBE LINEN
16 ACCORDANCE WITH STRUCT. BAR 16
15 15
ENG. DETAILS
2. .17
2. .17
FALL 40mm NRG GREENBOARD
14
14
14 14
2
2
PROPOSED NEW PREFAB
W
W19 2850 1500 1060 900 13 13
CLADDING TO TIMBER FRAMED
SPA. REFER STRUCTURAL SPA LIFT
1595
L2
3
3
12 12
41
41
LIFT
.5
.5
41
41
SPA 90 WALL TO SUPPLIERS DETAILS
12
12
TIMBER BATTEN PRIVACY
9.
9.
ENS
9.
9.
11 11
ENGINEER'S DETAILS
41
PROPOSED NEW PREFAB SPA LINE OF EXISTING DWELLING
41
1500 1060 90010
9.
9.
10
TO STRUCTURAL ENGINEER'S SCREEN OVER WINDOW 9 90 9
DETAILS 8 8
7 7 SKYLIGHT OVER STAIRWELL
BATH
40
40
SKY
9.
9.
40
6 6
40
roof line
9.
LIGHT
9.
5 5
21
21
76
76
4 4
NEW GUTTERS AND DOWNPIPES TO
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.