Council archive · source document
Appendix E- Traffic Impact Statement · MCU23/0078
Very large file (17.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 100, section 1. The text section number identifies this passage in the reader.
MOVEMENT SUMMARY
Site: A4 [A4-2026 BG+DEV-SAT (Site Folder: 2026 BG+DEV)]
620.30926-Noosa Civic Expansion
Prepared by: AC
Reviewed by: BR
Site Category: Proposed Design 1
Give-Way (Two-Way)
Vehicle Movement Performance
Mov Turn INPUT DEMAND Deg. Aver. Level of 95% BACK OF Prop. Effective Aver. Aver.
ID VOLUMES FLOWS Satn Delay Service QUEUE Que Stop No. Speed
[ Total HV ] [ Total HV ] [ Veh. Dist ] Rate Cycles
veh/h % veh/h % v/c sec veh m km/h
South: Unnamed Road (S)
1 L2 281 3.0 296 3.0 0.178 5.6 LOS A 0.0 0.0 0.00 0.53 0.00 53.8
2 T1 27 3.0 28 3.0 0.178 0.0 LOS A 0.0 0.0 0.00 0.53 0.00 55.3
Approach 308 3.0 324 3.0 0.178 5.1 NA 0.0 0.0 0.00 0.53 0.00 53.9
North: Unnamed Road (N)
8 T1 26 3.0 27 3.0 0.015 0.1 LOS A 0.0 0.1 0.04 0.02 0.04 59.6
9 R2 1 3.0 1 3.0 0.015 6.6 LOS A 0.0 0.1 0.04 0.02 0.04 57.2
Approach 27 3.0 28 3.0 0.015 0.3 NA 0.0 0.1 0.04 0.02 0.04 59.5
West: Lot 3 Southern Acess Road (W)
10 L2 1 3.0 1 3.0 0.265 5.7 LOS A 1.0 7.4 0.32 0.63 0.32 52.7
12 R2 265 3.0 279 3.0 0.265 6.5 LOS A 1.0 7.4 0.32 0.63 0.32 52.1
Approach 266 3.0 280 3.0 0.265 6.5 LOS A 1.0 7.4 0.32 0.63 0.32 52.1
All 601 3.0 633 3.0 0.265 5.5 NA 1.0 7.4 0.14 0.55 0.14 53.4
Vehicles
Site Level of Service (LOS) Method: Delay (RTA NSW). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Vehicle movement LOS values are based on average delay per movement.
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is
not a good LOS measure due to zero delays associated with major road movements.
Delay Model: SIDRA Standard (Geometric Delay is included).
Queue Model: SIDRA Standard.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
SIDRA INTERSECTION 9.0 | Copyright © 2000-2020 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: SLR CONSULTING AUSTRALIA | Licence: NETWORK / 1PC | Processed: Wednesday, 17 May 2023 5:22:14 PM
Project: H:\Projects-SLR\620-BNE\620-BNE\620.30926.00000 Noosa Shopping Centre Expansion\02 Analysis\02. SIDRA\SIDRA-fix\620.30926-
Noosa Expansion SIDRA-v0.6.sip9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E- Traffic Impact Statement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.