Council archive · source document
Appendix E- Traffic Impact Statement · MCU23/0078
Very large file (17.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 130, section 1. The text section number identifies this passage in the reader.
Transport Code
Table 9.4.7 – Criteria for Assessable development
Strategic transport network Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes Compliance Response
//NA
Strategic Transport Network
PO1 AO1.1 Complies with PO1
Traffic generation from development is Where the development leads to the See Section 8 of the attached SLR traffic
considered in a localised and a Shire wide need to increase transport assessment for peak traffic generation, no transport
context to ensure that— infrastructure in the Shire, the infrastructure upgrades are considered necessary to
development contributes to the support the subject development.
(a) the transport network has the capacity transport network in accordance
to safely and efficiently accommodate with Council’s infrastructure network
projected movements; planning.
(b) development does not have an adverse
Editor’s Note— Council may require
impact upon the functioning of the road the preparation of a Transport Impact
network; and Assessment Report.
(c) development includes measures to
improve transport options rather than AO1.2
relying on the widening of roads. Development provides for high trip
generating land uses, such as higher
density residential development and
employment generators, to be located
in and around activity centres and
around major public transport hubs.
PO2 AO2.1 Complies with PO2
Development respects the road hierarchy and Arterial and distributor roads are The subject development makes use of existing
supports the intended function of adjacent designed so they can operate with road accesses and therefore does not impact on the
and nearby roads. acceptable volumes of traffic during function of any public roads.
peak times.
Editor’s Note — The Noosa Shire road
hierarchy is depicted on Regional AO2.2
Infrastructure Overlay Maps. Collector and local streets are provided
to support short trips for local traffic
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E- Traffic Impact Statement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.