Council archive · source document
Appendix E- Traffic Impact Statement · MCU23/0078
Very large file (17.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 38, section 1. The text section number identifies this passage in the reader.
Stockwell Development Group Pty Ltd SLR Ref No: 620.30926-R01-v1.0 TIA 20230524.docx
Traffic Impact Assessment May 2023
Proposed Noosa Civic Village Mixed Use Development
Figure 17 Lot 7 Northern Access Road / Unnamed Road Intersection Form
Table 19 A2 - Lot 7 Northern Access Road / Unnamed Road Intersection – SIDRA Output
Weekday PM Peak Saturday Midday Peak
Scenario Critical Critical
95%tile 95%tile
Max DOS Delay Max DOS Delay
Queue (m) Queue (m)
(sec/ veh) (sec/ veh)
2026 With Development 0.02 5.6 0.4 0.02 5.6 0.5
2036 With Development 0.02 5.6 0.4 0.02 5.6 0.5
The results presented in Table 19 indicate that the proposed A2 Access Road would operate within acceptable
performance thresholds under all assessment scenarios.
8.9.6 A3 - Lot 7 Southern Access Road / Unnamed Road Intersection
The Lot 7 Southern Access Road / Unnamed Road Intersection is a proposed three-leg priority-controlled
intersection. The proposed intersection form is shown in Figure 18. Please note that this intersection form is
indicative only and is subject to future site plans for Lot 7. Summary outputs from the SIDRA assessment is
presented in Table 20, with detailed outputs provided at Appendix E.
Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E- Traffic Impact Statement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.