Council archive · source document
Appendix E- Traffic Impact Statement · MCU23/0078
Very large file (17.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 64, section 1. The text section number identifies this passage in the reader.
HRV / COMPACTOR ENTRY HRV / COMPACTOR EXIT
L Y
O N
E PT
N C
CO
ADJUST DOCK BOUNDARY
ADJUST KERB LINE
12.50
L16 175 EAGLE STREET
Project No: 620.30926 10.23
Stockwell
BRISBANE CITY 4000
AUSTRALIA
Date: 24/05/2023
T: 61 7 3858 4800
SWEPT PATH LEGEND Noosa Proposed Village Mixed Use Precinct
www.slrconsulting.com
Drawn by: DM N
Vehicle Path
2.20 6.85 1.51 5.50
Scale: AS SHOWN Vehicle Body
HRV RORO Compactor (ACCO 2350) 0.0 4 8 12 16
South Dock
The content contained within this document may be based Body Clearance
on third party data. Sheet Size: A3 Width
meters
: 2.50 Width
meters
: 2.50 METERS HRV / Compactor Swept Path
SLR Consulting Australia Pty Ltd does not guarantee the Track : 2.50 Track : 2.50 SCALE 1:400
Projection: - Lock to Lock Time : 6.0 Lock to Lock Time : 6.0
FIGURE SK07
accuracy of any such information. Steering Angle : 36.7 Steering Angle : 38.9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E- Traffic Impact Statement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.