Original source · versioned page text
2019-06-05 Special Meeting Agenda - Attachment 1 to Item 2 - Proposal Plans
The original of this document is very large (37.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnREV DESCRIPTION DRN DATE
A ISSUE FOR MCU DA APPROVAL DDT 20.12.16
B ISSUE FOR INFORMATION DDT 07.03.17
C ISSUE FOR RFI RESPONSE DDT 22.03.17
D ISSUE FOR MCU DA APPROVAL REVISIONS DDT 07.03.18
E ISSUE FOR MCU DA APPROVAL REV. DDT 11.05.18
F PRELIMINARY ISSUE FORINFORMATION DDT 18.05.18
G ISSUE FOR MCU DA APPROVAL REVISIONS DDT 24.05.18
SETBACKS VARY ACROSS THE SITE IN
RESPONSE TO LOT SHAPE AND SIZE
, a | ee ee es o-— ee ee es ee scanlon group
v4 fe | |
FF EF 4 hoe
Pry be | caches $1 | | | mW I | ZA) 1
‘ i | | | Hl HM | |
i 5 Terrace ES | ————— ss 7 Ca ll
uw
Raley | 11 | ieee | lh rc —_——= fd ease! Hi
| aaaahi hi
A 2 PI Seal ae NE eo ENS 1 CSSENCE
ti
EI FS DALY} nt ia C3 |!
QI f
| eS |
Crd asi
IC) edroom 1 of peregian beach
See cites et
|
i) fone NC FH ER ee repeat ge tr eeeell
| rm TES
‘ | Ha sche bie rs ARRY SZ EI Col RP
8 pe pte i) 8) ii VS
cba, pies | pa
BI Re EEza
iL pe of ae C 'wa |
eS os 4 lobe [{ i
‘i up CoD See > PS LY ——}—Fall _@
aed
| | Btordge | i
Celal
filed
aly ee ae = . | proce Petes eed _ ee ee ee ae a ee ee
‘id Z| YX a Re sh pa 1a’ 00 _
Lt jes
eb | [e i 1000 | le [ = |
aM al ntry| I | | rf oe Robe SJ |
ial i =E arag S edroom 2 ia} eee | Scale 1:100
te if ea i | eI = | a f edroom ———a = — i|
j
Ba a Leaiinond
i 1 | | y 1 —— | — lee CaO I lf | Sel 1!
eee ietadccai L| |{_—_———
Ee WT “pitin A Hl fi 1d | la VA —S—— t-—I |
36 m2 l |
7
Se yt —— ae —_—-—--—--—--—- eee
(Ca ------------- - - ee 41 oO ell
iC St eo! = bed iH ots Peis Z ee ae ee ees es a architects
ee ses SUNCOAST RESORT BUSINESS CENTRE
SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Id 4572
PO BOX 6232 MAROOCHYDORE BC Qid 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
ORR tar LEVEL 1 Scale 1:100 < ROOF ae EMAIL: [email protected]
FLOOR AREA - 74m? project
ESSENCE OF PEREGIAN BEACH
SITE AREA -160m? DEVELOPMENT
for
THOMCO (NO 2087) PTY LTD
Perimeter 41820m
at
600mm Overhang 33010m = 79% Lots 1 on SP286680
215 DAVID LOW WAY
No Overhang 8810m = 21% PEREGIAN BEACH
drawing
MARRAM PLANS
AS SHOWN
MARRAM date 24/05/2018 drawn DDT scale @A3
drawingno. 16003 SD10 revision G
Copyright of this document remains the exclusive
SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
Contractors are to verify all dimensions and levels on
‘site prior to commencing. Report all discrepancies to
the Archit
ee Use figured dimensions in preference
MATER | AL CHANGE O F USE DEVELOPMENT APPL | CAT | ON DRA W | NGS iSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.