Council archive · source document
Delegated Report OPW25-0012 (As Paublished) · OPW25/0012
Prior to the commencement of works the applicant will be required to provide a bank guarantee in
accordance with higher order condition 69. A bond of $50,000 must be lodged as a security for
the protection of the trees identified for retention. See condition below.
Vegetation management on the site will include tree protection measures for retained trees and
include:
• Pre-construction clearing management measures
• Demolition phase
• Construction measures
• Compliance measures
• Post-construction management measures
The details of the vegetation removal and retention are depicted on the plans that form part of the
arborist report to be approved.
Protection works installed around trunks and branches where applicable will be undertaken in
accordance with AS 4970-2009 Protection of trees on development sites and in consultation with
the Project Arborist.
At the conclusion of the works, the project arborist is required to inspect the trees required to be
protected and recommend any pruning or tree surgery works required to ensure the health and
stability of the tree and reduce potential hazards for future users of the site in accordance with AS
4373- pruning of amenity trees.
Page 5 of 12
Document Set ID: 23876398
Version: 2, Version Date: 08/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report OPW25-0012 (As Paublished).pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.