SUPERSEDED Negotiated Decision Notice REC14/0005

of 6

Text shows just the words. Original shows the document exactly as it was published.

                                                              PO Box 141, Tewaantin, QLD 45655
                                                                one (07) 5329 6500
                                                              Pho                           Faax (07) 5329 65
                                                                                                            501
                                                              Email: [email protected] W
                                                                                            Website: www.no oosa.qld.gov.au
                                                              ABN
                                                                N 97 969 214 121




NEGO
N OTIATE
       ED INF
            FRAST
                TRUCT
                    TURE CHAR
                            RGES NOTIC
                                     CE

To:
T      Bunnnings Prope
                     erties Pty Ltd
                                L                                       Infrasttructure Chaarges Notice
                                                                                                      e No: N 102
                                                                                                                22
       C/- RP
            PS                                                                                    Revvision No:  1
       PO Box 1559
       FORT TITUDE VA
                    ALLEY, QLD  D 4006                                                      ue: 25 Septtember 201
                                                                                 Date of Issu                   14


Notice
N       is hereby given under the Sustainable
                                   S            Planning Act
                                                         A 2009 and d the Locall Government Act 2009
                                                                                                   9
th
 hat the infra
             astructure charge
                        c      notic
                                   ce is levied by the Noos         ouncil on thee described
                                                          sa Shire Co                      d land.

DEVELOP
D       MENT TO WHICH THE
                      T   INFRA
                              ASTRUCTU
                                     URE CHARGE APPL
                                                   LIES:
 Development Approv
                  val Referen
                            nce:                REC
                                                  C14/0005
 Type of De
          evelopmen
                  nt Approvall:                 Reco
                                                   onfiguratio
                                                             on of a Lot (1 Lot into 2 Lots)

LAND
L    TO W
        WHICH TH
               HE INFRAS
                       STRUCTU
                             URE CHAR
                                    RGE APPL
                                           LIES:
 Land Desc
         cription:                              Lot 1
                                                    101 SP 241371
 Address:                                       178 E
                                                    Eumundi Noosa
                                                            N     Rd NOOSAVIL
                                                                     N        LE QLD 45
                                                                                      566

INFRASTR
       RUCTURE CHARGE LEVIED B
                             BY COUNC
                                    CIL: (at 1 July
                                               J    2014 Index)
                                   * CALCULATE
                                     C       ED INFRAST
                                                      TRUCTURE CHARGE =                                         * $19,320
                                                                                                                        0.00
                  Infrastructure Offsset for
                                                   No
                                                    ot Applicable
                                                                e                                                       -$0
                                                                                                                          0.00
 Reductions
          s             nk” infrastruc
                    “trun            cture
                      R
                      Rebate / Othe
                                  er               No
                                                    ot Applicable                                                       -$0
                                                                                                                          0.00

            * NET INFRASTRUC
                           CTURE CH
                                  HARGE AM  MOUNT PA  AYABLE =
                                                                                                             * $19,320.00
                                 (C
                                  Current at 1 July 201
                                                      14 Index)
* Subject to Automatic Increase Prrovision unttil date of pa
                                                           ayment.

The
T Calcula
        ated Infrastrructure Charge details are provide
                                                      ed on page 3 of this nottice.
    (NOT TE: Separa ate Infrastru
                                ucture Cha arges may be issued by Unitywaater as appplicable)

AUTOMAT
A     TIC INCRE
              EASE PRO
                     OVISION:
The
T net infrrastructure charge
                       c       amoount payabble is subjec
                                                        ct to autom
                                                                  matic indexaation from th
                                                                                          he 1 July 2014
                                                                                                    2
in         e index currrent at the time of ma
 ndex to the                                 aking paymment. The index is speecified by the
                                                                                          t   Sustain
                                                                                                    nable
Planning
P        Acct 2009 and determined d by the Min
                                             nister.

      CONTA
          ACT COUNC                NG PAYMENT FOR TH
                  CIL PRIOR TO MAKIN               HE CURRE
                                                          ENT AMOUN
                                                                  NT DUE.

DATE
D    FOR
       R PAYMEN
              NT OF THE
                      E INFRAST
                              TRUCTUR
                                    RE CHARG
                                           GE
Under
U      the S
           Sustainable Planning Act 2009, the
                                            e Infrastructture Charge
                                                                   e is to be paaid to NOOS
                                                                                          SA COUNC
                                                                                                 CIL
as
a follows:
  DEVELOPMENT PE
               ERMIT TYPE                                           DUE DATE FOR PAY
                                                                                   YMENT
                                               When Council app proves the plan
                                                                           p    of subd
                                                                                      division for the
 Reconfigurration a Lot
                                               reconffiguration




                               PO Box
                                    x 141                    P. (07
                                                                  7) 5329 6500     [email protected]
                               TEWANTIN QLD 456
                                              65             F. (07
                                                                  7) 5329 6501     www.noosaa.qld.gov.au          ICN - Pagee 1
Full text of the other 5 pages

Page 2

REFUND
R      P
       PROVISION:
Where
W      the vvalue of a “Trunk” Inffrastructure Offset exc
                                                        ceeds the Net
                                                                   N Infrastrructure Cha
                                                                                       arge Payable, a
re
 efund will b
            be provided in accordan
                                  nce with Cla          o Council’s Resolutionn.
                                              ause 12.4 of
                               TERMS OF REFU
                                           UND                                              REFUND
                                                                                                 D AMOUNT
                                                                                                        T
 Not Applicab
            ble                                                                                                  $0
                                                                                                                  0.00

INFRASTR
       RUCTURE CHARGES TAKEN TO BE A RATE:
Under
U      the SSustainable Planning ActA 2009 an infrastructu  ure charge levied
                                                                       l      by a local goverrnment is, fo
                                                                                                          or
th
 he purpose es of recove ery, taken to
                                     o be a ratee within the meaning of
                                                                      o the Local Governme    ent Act 19933.
This
T     means::
   a.    an adopted inffrastructure charge ma   ay be recoveered by cou
                                                                      urt action forr a debt;
   b.    an adopted in   nfrastructure
                                     e charge m may be rec  covered fro
                                                                      om the persson for the  e time beinng
         own ning the rellevant land,, regardlesss of who waas the owneer or other person upo on whom th he
         chaarges was im mposed;
   c.    Inteerest is paya
                         able on oveerdue paym ments; and
   d.    If charges are unpaid for 3 years, the e land can be
                                                            b sold to re
                                                                       ecover the ooutstandingg charges.

INTEREST
       T ON OVER
               RDUE CHA
                      ARGES:
Compound
C           interest at the rate of 11% per aannum calculated da   aily is payaable on all infrastructurre
charges
c       outsstanding aft
                       fter the due date shown
                                             n on this charges notic
                                                                   ce.

GOODS
G     AN
       ND SERVIICES TAX:
The
T federal governmennt has deterrmined thatt rates and utility charg ges levied bby local gov
                                                                                           vernment will
                                                                                                    w
be
b GST free                    T is include d in this infrrastructure charges nootice.
         e. Accordingly, no GST

INFRASTR
       RUCTURE CHARGES ENQUIR
                            RIES:
Enquiries
E         re
           egarding thiss infrastructture charge
                                               es notice shoould be direected to Couuncil’s office:
    Phon   ne (07) 5329 6211 or 5329
                                    5      6449 d
                                                during office
                                                            e hours; or
    E-ma   ail: ic@noo
                      osa.qld.gov   v.au

METHODS
M     S OF PAYM
              MENT:
                                          Obtain the current indexed amo
                                                                       ount due andd mail with yo
                                                                                                our payment
 Mail
                                          immeddiately to: Noosa Council, PO Box 1441, Tewantin, QLD 4565 5
                                          Obtain the current indexed amo   ount due andd present to Noosa
                                                                                                     N
 In Person A
           At Council Office
                      O                   Counciil Level 2 Cuustomer Serv vice Counter at 9 Pelican Street,
                                          Tewan ntin.
                                          Payme ent by electroonic transfer direct to Couuncil’s Bank Account is
 Direct Bank
           k Transfer                     only avvailable by sp
                                                              pecial arranggement.
                                          Contacct Council thrrough Infrasttructure Charrges Enquiriees.
                                          Payme ents via crediit card transa
                                                                           actions are nnot accepted for paymentt of
 Payment Methods NOT
                   T Accepted
                                          Infrastrructure Charrges.




                               PO Box
                                    x 141                P. (07
                                                              7) 5329 6500    [email protected]
                               TEWANTIN QLD 456
                                              65         F. (07
                                                              7) 5329 6501    www.noosaa.qld.gov.au      ICN - Pagee 2

Page 3

INFRASTR
       RUCTURE CHARGE CALCULA
                            ATION DE
                                   ETAILS:
The
T infrastru  ucture charg ge is calculated in acco
                                                 ordance witth Council’s
                                                                       s Infrastructture Charge
                                                                                              es Resolutioon
in
 ncorporating g the charg
                        ge apportion nment (brea           ement with Unitywater in complian
                                                ak-up) agree                                  nce with thee
Sustainable
S              Planning Act
                        A 2009 and Statutory Regulatory    y Provision (adopted chharges) app plying at the
                                                                                                          e
tiime of issuing the noticce.

Council’s
C         inffrastructure charge levied is based
                                               d on the following:

Approved
A        D
         Developmeent Definedd Use & Qu antity:
    Deveelopment Pe
                   ermit to Reconfigure a Lot (1 Lot into 2 Lots)

Infrastructu
I          ure Charge e applies to
                                 o:
     1xA Additional In
                      ndustrial Lott
        Develop
              pment                Unit of                         % Cha
                                                                       arge
                                                Charge Ra
                                                        ate                          % Council                            $ Amount
           Clas
              ss                  Measure                         (Clause
                                                                        e 13 (c)
                                                                                                          Qty
                                                 (Table 13. 1
                                                                   & Table
                                                                         e 10.3
                                                                                   Apportionment                               at
          (Table 1
                 13.1           (Table 13.1
                                                Columns 4 & 5)                          (T
                                                                                         Table 10.1)                   1 July 2014 Ind
                                                                                                                                     dex
           Columnn 2)          Co
                                olumns 3 & 5)                       Note: (1))
                                     Lot
     Industry Lott              (equiv to 3+      $28,000             100
                                                                        0%                 69%             1                   $19,32
                                                                                                                                    20.00
                                  dwelling)
     Non-Reside
              ential           m2 impervious
                                                     $10              100
                                                                        0%                 100%            0                         $0.00#
                                                                                                                                     $
     Stormwater #                   area
                                                                      Ca
                                                                       alculated Infra
                                                                                     astructure Ch
                                                                                                 harge =                       $19,32
                                                                                                                                    20.00


 The infrasstructure ch
                      harge paya able will bee allocated to Counc
                                                                cil “Trunk” infrastructu
                                                                                       ure networkks
 in accordannce with Co
                      ouncil’s Resolution as fo
                                              ollows:
                                                                                                                      * Net
                                                                                                                        N Infrastruccture
                                                           Allocation of
     Council “T
              Trunk” Infras
                          structure Netw
                                       work                                                                             Charge
                                                                                                                        C      Amou unt
                        (Table 10.2)
                                                            Calculated             Offs
                                                                                      set/Rebate/O
                                                                                                 Other
                                                                                                                            Payable
                                                      Infra
                                                          astructure Ch
                                                                      harge
                                                                                                                      att 1 July 2014 In
                                                                                                                                       ndex

     Transport                                                     $16,4
                                                                       422.00                            -$0.00                 $16,42
                                                                                                                                     22.00
     Public Parkss & Land for Community
                              C
                                                                     $2,8
                                                                        898.00                           -$0.00                  $2,89
                                                                                                                                     98.00
     Facilities
     Stormwater #                                                         $0.00                          -$0.00                      $0.00#
                                                                                                                                     $

     * Net Infra
               astructure Charge Payable =                       * $19,32
                                                                        20.00                           -$0.00              * $19,32
                                                                                                                                   20.00

 #
  Stormwatter infrastruccture charge
                                   es are not a
                                              applied on Reconfigura
                                                         R           ation of a Loot approvals
                                                                                             s but will app
                                                                                                          ply
                                                                                          2
 and be issu
           ued on subssequent dev  velopment aapprovals th
                                                         hat identifies
                                                                      s the appliccable m imppervious are ea
 of the deve
           elopment on n the site.

* Subject to Automatic Increase Prrovision unttil date of pa
                                                           ayment.


NATURE
N      O
       OF CHANG
              GE FOR NEGOTIAT
                            TED INFRA
                                    ASTRUCTU
                                           URE CHAR
                                                  RGES NOTICE
Representat
R           tions made on 1 September 2014    4 advised the
                                                         t infrastruucture charrge notice originally
                                                                                          o          isssued
was
w incorrecctly dated 9 January 2014
                                  2     (instea                                          a requested a
                                              ad of 9 July 2014 being the corrrect date) and
Negotiated
N          IInfrastructure Charges Notice be iissued and correctly da
                                                                    ated.

This
T    Negotiaated Infrasttructure Chaarges Noticce (Rev 1) replaces
                                                          r        thee original nnotice (Rev 0) and corrrects
th
 he original notice admministrative date error.. The Negootiated Infra
                                                                     astructure C Charge Nottice is there
                                                                                                        efore
dated
d      to align with thhe issue of o a Negotiiated Decis  sion Noticee in accorddance with the reque    ested
re
 epresentation and legislation.




                                        PO Box
                                             x 141                  P. (07
                                                                         7) 5329 6500        [email protected]
                                        TEWANTIN QLD 456
                                                       65           F. (07
                                                                         7) 5329 6501        www.noosaa.qld.gov.au          ICN - Pagee 3

Page 4

                                                         PO Box 141, Tewaantin, QLD 45655
                                                           one (07) 5329 6500
                                                         Pho                           Faax (07) 5329 65
                                                                                                       501
                                                         Email: [email protected] W
                                                                                       Website: www.no oosa.qld.gov.au
                                                         ABN
                                                           N 97 969 214 121


INFRA
I   ASTRUCTURE CHA
                 ARGES
                     S INFORMAT
                              TION NOTICE
                                   N    E
1.
1      PRELIM
            MINARY

Infrastructu
I           ure charges are triggered and iss ued on deve   elopment ap
                                                                      pprovals as a contribution towardss the
cost
c    of "trun
            nk" infrastru
                        ucture proviided to servvice developm
                                                            ment.
For
F developm   ment approvved prior to 1 July 201             ucture contributions annd (ICP) charges continu
                                                11, infrastru                                             ue to
apply
a      in accoordance witth the deve elopment appproval conditions and or
                                                                       o infrastruucture charg ge notices (ICP)
                                                                                                          (
isssued underr legislation current at the
                                      t time thoose approvals & charge notices
                                                                       n       weree issued.
For
F   development approoved from 1 July 20    011, adopted infrastructure chargges are governed by local
government
g          adopted inffrastructure                                                        ble Planning Act
                                  e charges rresolutions in accordance with thee "Sustainab
2009
2    (SPA)" and “State Planning Re
                                 egulatory Proovision (adop
                                                          pted charge
                                                                    es) (SPRP)”.
The
T   Sustainaable Plannin
                       ng (Infrastr
                                  ructure Charrges) and Other
                                                        O      Legislation Amend
                                                                               dment Bill 2014
                                                                                          2    introd
                                                                                                    duced
further
f       amen
           ndments to SPA that co ommenced too apply for development
                                                         d          ts approved from 4 Jully 2014.
From
F      1 Julyy 2014, Inf frastructuree Charges NNotices are issued sepa arately by bboth Council and Unitywwater
relating
r        to ttheir specifiied “Trunk” infrastructuure networkks. All payments (includ
                                                                                    ding contribu
                                                                                                utions & cha
                                                                                                           arges
previously
p          isssued) are also payable separately
                                     s          t o Council and Unitywateer respectfuully.

2.
2      THE D
           DECISION AND REASONS FOR I
                                    IT

The
T Sustainaable Planning
                      g Act 2009 (as amended
                                           d), provides for the following:
(1) Authorisses local govvernments to
                                   t do the folllowing for development
                                                           d         t approvals:
      (a) for trunk infra
                        astructure, either
                                     e      or bo th of the fo
                                                             ollowing—
          (i) adopt, by resolution, charges forr developme   ent infrastructure and levy charge
                                                                                              es in accord
                                                                                                         dance
               with the re
                         esolution;
          (ii) impose parrticular cond
                                     ditions aboutt developmeent infrastru
                                                                         ucture;
      (b) for non-trunk infrastructu                        onditions about develop ment infrastructure; an
                                   ure, impose pparticular co                                             nd
(2) Providess for a Sta
                      ate planningg regulatoryy provision to
                                                          t govern local governnment adoptted chargess and
    charges by distributor-retailer
                                  rs under thee SEQ Wate er Act for tr
                                                                     runk infrasttructure.
Noosa
N       Counc
            cil decided to apply inf
                                   frastructuree charges on
                                                         o developm  ment under iits adoptionn of the "N
                                                                                                       Noosa
Shire
S      Counccil Adopted Infrastruccture Charg es Resolution (No.1) 2014"
                                                                     2      to reeplace the "Sunshine
                                                                                             "         C
                                                                                                       Coast
Regional
R         Cou
            uncil Adopte
                       ed Infrastruucture Charrges Resoluttion (No.4) 2011" that ttranslated across
                                                                                             a      to Noosa
                                                                                                       N
Council
C        on 1 January 2014. The resolutions also detaiil the apportionment ((break-up) agreement with
Unitywater.
U

3.
3      INFRA
           ASTRUCTUR
                   RE CHARGE
                           E NOTICES
                                   S

3.1
3      TRIGG
           GERS FOR INFRASTRU
                    I       UCTUE CHA
                                    ARGES & ISS
                                              SUING OF NOTICES
The
T triggerss for issuing infrastructture chargess are define
                                                          ed in the SPA
                                                                      A and SPRP and are gen
                                                                                           nerally trigg
                                                                                                       gered
by
b the issue of a develop
                       pment permit for eitherr:
           guration of a lot; or
(1) Reconfig
(2) Materiaal Change of Use of Prem
                                  mises; or
(3) Building Works issued by a Priv
                                  vate Certifie
                                              er.
Under
U          SPA, infrastrructure charges are nott imposed by
       the S                                             b condition on a develoopment permmit - they arre an
action
a      that follows thee issue of a permit. S  So consequeently, chargges may be imposed in n cases wheere a
development
d           t permit forr a lot reco
                                   onfiguration or materia
                                                         al change of f use of preemises has previously been
granted,
g        butt a developm
                       ment permit for
                                    f building works is yet to issue.




                               PO Box
                                    x 141               P. (07
                                                             7) 5329 6500     [email protected]
                               TEWANTIN QLD 456
                                              65        F. (07
                                                             7) 5329 6501     www.noosaa.qld.gov.au          ICN - Pagee 4

Page 5

3.2
3      DUE D
           DATE FOR PAYMENT
                    P       OF
                            O INFRAST
                                    TRUCTUE CHARGES
                                            C       (S
                                                     SPA SECTION
                                                               N 638)

(1) A levied
           d charge bec
                      comes payab
                                ble—
      (a) if tthe charge applies for reconfiguriing a lot—wwhen the loc cal governm
                                                                                  ment that levied the ch
                                                                                                        harge
          appproves the plan of subdivision for th
                                                 he reconfigu
                                                            uration; or
      (b) if tthe charge applies for building woork—when thhe certifica
                                                                      ate of class ification or final inspec
                                                                                                           ction
          certificate forr the building
                                      g work is givven; or
      (c) if tthe charge applies
                         a       for a material ch          e—when the change happpens; or
                                                 hange of use
      (d) if tthe charge applies
                         a       for other developpment—on the
                                                           t day stated in the inffrastructure charges no
                                                                                                        otice
          undder which the charge wa as levied.
           ction is subject to section 639.
(2) This sec
3.3
3      EFFEC
           CT OF CHAR
                    RGES NOTI
                            ICE (INFRA
                                     ASTRUCTUR
                                             RE CHARGES
                                                      S TAKEN TO BE A RAT
                                                                        TE)
An
A infrastructure charg ge levied by a local gove
                                               ernment is, for
                                                           f the purp
                                                                    poses of recoovery, taken
                                                                                            n to be a ratte
within
w      the meaning of th
                       he Local Gov
                                  vernment Acct 1993. Thiis means:
(1) an infraastructure charge
                       c      may be
                                  b recovere
                                           ed by court action
                                                       a      for a debt;
(2) an infrastructure charge may  y be recoverred from thhe person fo
                                                                    or the time being owninng the rele
                                                                                                     evant
    land, reg
            gardless of who was the
                                  e owner or oother person
                                                         n upon whom
                                                                   m the chargees was impos
                                                                                          sed;
(3) INTERE
         EST IS PAY
                  YABLE on ov
                            verdue paym
                                      ments; and
(4
 4) if charg
           ges are unpaid for 3 years, THE LA ND CAN BE
                                                      E SOLD to recover
                                                                r       the outstanding
                                                                                      g charges.
3.4
3      INTER
           REST ON OVERDUE
                   O       IN
                            NFRASTRUC
                                    CTURE CHA
                                            ARGES
Compound
C         interest at thhe rate of 11%
                                   1    per annnum calculaated daily is
                                                                      s payable onn all overdue
                                                                                              e infrastruc
                                                                                                         cture
charges
c       outsstanding after the due date
                                   d    for payyment as app
                                                          plying to the
                                                                      e infrastructture charge
                                                                                             es notice.
3.5
3      GOOD
          DS AND SER
                   RVICES TAX
                            X
The
T federal governmentt has determ mined that r ates and utiility charges
                                                                      s levied by loocal governm
                                                                                               ment will be
GST
G   free. A
          Accordingly, no GST is in
                                  ncluded in th
                                              his infrastru
                                                          ucture chargges notice.

4.
4      APPEA
           ALS ABOUT
                   T INFRASTR
                            RUCTURE C
                                    CHARGES NOTICE
                                            N

Prior
P     to maaking an ap ppeal about an infrasttructure ch harge notice, the rec ipient mustt first mak
                                                                                                    ke
representati
r                                 ure charges notice in accordance with SPA secttions 640 to
           ions to the infrastructu                                                        o 644.
4.1
4      APPEA
           ALS ABOUT
                   T INFRASTR
                            RUCTURE C
                                    CHARGES NO
                                             OTICE (SPA
                                                      A SECTION 4
                                                                478)
(1)
( The recipient of an infrastructture chargess notice may
                                                        y appeal to the
                                                                    t court ab
                                                                             bout the dec
                                                                                        cision to give
                                                                                                     e the
    notice.
(2) Howeverr, the appea al may be maade only on 1 or more of the following grounds—
                                                                                  —
    (a) thee charge in the
                        t notice is                         n reasonable relevant llocal govern
                                    s so unreasoonable that no                                nment could have
        imp posed it;
    (b) thee decision invvolved an error relatingg to—
        (i) the applica  ation of the relevant ad
                                                dopted chargge; or
        (ii) the workin ng out, for section 636, of additiona
                                                            al demand; or
                                                                       o
        (iii)) an offset or
                         o refund;
    (c) theere was no de ecision abou
                                    ut an offset or refund;
      (d) if tthe infrastru
                          ucture charg
                                     ges notice s tates a refu
                                                             und will be given—the
                                                                         g         tiiming for giv
                                                                                                 ving the refu
                                                                                                             und.
(3) To remo
          ove any doub
                     bt, it is decla
                                   ared that th          ust not be about—
                                              he appeal mu
      (a) the
            e adopted ch
                       harge itself; or
      (b) for a decision about
                         a     an off
                                    fset or refu nd—
          (i) the establishment cos st of infrasttructure identified in an
                                                                         n LGIP; or
          (ii) the cost of infrastruc
                                    cture decide ed using the method included in thee local gover
                                                                                                rnment’s cha
                                                                                                           arges
               resolution..



                                PO Box
                                     x 141               P. (07
                                                              7) 5329 6500   [email protected]
                                TEWANTIN QLD 456
                                               65        F. (07
                                                              7) 5329 6501   www.noosaa.qld.gov.au    ICN - Pagee 5

Page 6

(4
 4) The app peal must bee started within 20 bussiness days after the day
                                                                     d the reccipient is giv
                                                                                           ven the rele
                                                                                                      evant
    infrastrructure charrges notice.
4.1
4        HOW
           W APPEALS TO THE CO
                             OURT ARE S
                                      STARTED (S
                                               SPA SECTIO
                                                        ON 481)

(1) An appe
          eal is started
                       d by lodging written nottice of appea
                                                           al with the registrar
                                                                       r         of the court.
(2) The notice of appea
                      al must state
                                  e the ground
                                             ds of the ap
                                                        ppeal.
(3) The person starting
                      g the appeal must also ccomply with the
                                                          t rules of the court aapplying to the
                                                                                            t appeal.
(4
 4) Howeverr, the courtt may hear and
                                  a decide aan appeal evven if the pe
                                                                    erson has noot complied with subsec
                                                                                                      ction
    (3).
4.2
4      APPEA
           ALS ABOUT
                   T INFRASTR
                            RUCTURE C
                                    CHARGES DE
                                             ECISIONS (SPA SECTIION 535)
(1) The recipient of an infrastructture chargess notice may
                                                          y appeal to a building annd developm
                                                                                             ment committtee
    about th
           he decision to
                       t give the notice.
                                   n
(2) Howeverr, the appea
                      al may be ma
                                 ade only on 1 or more of
                                                        f the following grounds—
                                                                               —
      (a) thee decision invvolved an error relatingg to—
          (i) the applica  ation of the relevant ad
                                                  dopted chargge; or
          (ii) the workin ng out, for section 636, of additiona
                                                              al demand; or
                                                                         o
          (iii)) an offset or
                           o refund;
      (b) the
            ere was no de
                        ecision abou
                                   ut an offset or refund;
      (c) if tthe infrastru
                          ucture charg
                                     ges notice s tates a refu
                                                             und will be given—the
                                                                         g         tiiming for giv
                                                                                                 ving the refu
                                                                                                             und.
(3) To remo
          ove any doub
                     bt, it is decla
                                   ared that th          ust not be about—
                                              he appeal mu
      (a) the
            e adopted ch
                       harge itself; or
      (b) for a decision about
                         a      an off
                                     fset or refu nd—
          (i) the establishment cos  st of infrasttructure in an
                                                              a LGIP; or
          (ii) the cost off infrastruc
                                     cture decideed using the method included in thee local government’s charges
               resolution..
(4
 4) The app peal must be
                       b started within
                                    w       20 b
                                               business day
                                                          ys after the day the reecipient is given the
    relevantt infrastructture charges
                                    s notice.
4.3
4      HOW APPEALS TO
                   T COMMIT
                          TTEES ARE STARTED (SPA SECTIO
                                                      ON 537)

(1) A person starts an appeal
                       a      by lodging writte
                                              en notice of appeal, in the approved
                                                                                 d form, with the registrrar
    of building developm
                       ment committtees.
(2) The notice of appea al must state
                                    e the ground
                                               ds of the ap
                                                          ppeal and be accompanieed by the fee prescribed
                                                                                                        d
    under a regulation.

5.
5      INFRA
           ASTRUCTUR
                   RE CHARGE
                           ES ENQUIR
                                   RIES

Infrastructu
I          ure charges enquiries sh
                                  hould be dire
                                              ected to the
                                                         e appropriat
                                                                    te entity as follows:
(1) Council Infrastructture Charges
                                  s enquiries sshould be directed to Noosa
                                                                     N     Counccil’s office:
      Phone: (07) 5329 62
                        211 or 5329 6449 durinng office hou
                                                          urs; or
      E-mail: [email protected]
(2) Unitywa
          ater Infrasttructure Cha
                                 arges enquirries should be
                                                         b directed to Unitywatter’s office:
      Phone: 11300 086 48
                        89 or (07) 54
                                    431 8333 duuring office hours; or
      E-mail: d
              developmentt.services@
                                   @unitywater..com




                                PO Box
                                     x 141               P. (07
                                                              7) 5329 6500    [email protected]
                                TEWANTIN QLD 456
                                               65        F. (07
                                                              7) 5329 6501    www.noosaa.qld.gov.au    ICN - Pagee 6

Used in these records

About this file

File size
162 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Negotiated Decision Notice REC14_0005.pdf · 162 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.