Minor Change Existing Approval OPW21 0202 01 (As Published) · OPW21/0202.01

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                                             Officer:            Mark Lewis
                                                                             Direct Telephone:   07 53296290
                                                                             Our Reference:      OPW21/0202.01
                                                                             Your Reference:     .

               14 March 2025


               TH McCarthy
               522 Cooroy Mountain Road
               COOROY MOUNTAIN QLD 4563
               [email protected]



               Dear Sir
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 20 February 2025, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              OPW21/0202.01

                   Street address:              522 Cooroy Mountain Rd Cooroy Mountain Qld 4563

                   Real property description:   Lot 9 RP 864130 Lot 9 RP 864130

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 24 January 2022.
               •       Development Permit for Operational Works - Vehicle Crossovers.
               In relation to the request to make a minor change to the existing approval, Council on 11 March
               2025, decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change.
               B.      Amend condition 1.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.

               ABN 97.969.214.121                                                               PO Box 141
               noosa.qld.gov.au                                                          Tewantin QLD 4565
               [email protected]                                                          07 5329 6500
                                                                                                          Page 1 of 8
Document Set ID: 23632641
Version: 2, Version Date: 14/03/2025
Full text of the other 7 pages

Page 2

                           Plan No.           Rev.   Plan/Document Name                       Date

                           C20                B      Line of Sight Assessment, Driveway 1 10 December 2021
                                                     of 2 Line of site west prepared by
                                                     RECOR consulting engineers

                           C21                B      Line of Sight Assessment, Driveway 1 10 December 2021
                                                     of 2 Line of site east prepared by
                                                     RECOR consulting engineers

                           C22                B      Line of Sight Assessment, Driveway 2 10 December 2021
                                                     of 2 Line of site west prepared by
                                                     RECOR consulting engineers

                           C23                B      Line of Sight Assessment, Driveway 2 10 December 2021
                                                     of 2 Line of site east prepared by
                                                     RECOR consulting engineers

                           11 March 2025

                           C20                B      “General Arrangement Plan”               10 July 2024
                                                     Prepared by RECOR

                           C20                B      “Driveway Longitudinal and Typical 10 July 2024
                                                     Sections”
                                                     Prepared by RECOR

                           C20                B      “Driveway Setout Plan”                   10 July 2024
                                                     Prepared by RECOR

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 24 January 2024, unless an application to extend the currency period
                      is approved by Council.
               SITE SPECIFIC CONDITIONS
               3.     A site control and/or compliance bond of $2000 is to be submitted to Council prior to the pre-
                      start meeting. The pre-start meeting will only be held once Council's Construction
                      Engineering Officer has confirmation that the bond monies have been received by Council.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.
               4.     The existing driveways (the “barn and machine shed”) and the driveways under construction
                      (the “residence and the paddock”) must be upgraded and improved to be in accordance with
                      the approved plans and Council’s standard drawing RS-056. The works must include but not
                      be limited to:
                      a.      The “paddock” driveway. The works shown on the approved plans (widening, clearing,
                              minor earthworks, headwalls) and the standard drawing (scour protection, guide posts)
                      b.      The “residence” driveway. The works shown on the approved plans (widening, clearing,
                              headwalls) and the standard drawing (scour protection, guide posts)
                      c.      The “barn” driveway. The works shown on the standard drawing (scour protection,
                              guide posts)



                                                                                                       Page 2 of 8
Document Set ID: 23632641
Version: 2, Version Date: 14/03/2025

Page 3

                      d.      The “machine shed” driveway. The works shown on the standard drawing (headwalls,
                              scour protection, guide posts)
               5.     The works must also include the removal of any fencing that stands within the road reserve
                      adjacent to the residence and the redundant driveway.
                      Rehabilitation after Vegetation Clearing
               6.     Rehabilitation of the road reserve (area previously occupied by the driveway to the residence
                      and unsuitable/pest species) must:
                      a.      Be undertaken immediately following completion of the driveway works that required
                              clearing;
                      b.      Remove all unsuitable (e.g. bamboo) and pest species;
                      c.      Result in the area being stable and revegetated;
                      d.      Be established with revegetation works undertaken by a qualified person*; and
                      e.      Be revegetated with a species that reflect the surrounding road reserve vegetation.
               GENERAL CONDITIONS
                      Engineering
               7.     The principal contractor must have all the appropriate insurance and public liability
                      documentation to carry out the works. The principal contractor is also responsible to ensure
                      that any subcontractors also have the appropriate insurance and public liability
                      documentation. Certificates demonstrating currency of public liability insurance and works
                      insurance covering the works must be submitted to Council prior to the prestart meeting.
               8.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Clearing works
                      c.      Erosion and Sediment Controls
               9.     A Construction Management Plan must be submitted to Council prior to the pre-start meeting
                      and must specifically address the following:
                      a.      traffic management during the construction phase.
                      b.      appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD)
                      c.      provision for safe vehicle access across the frontage of the site both during work hours
                              and after hours.
               10.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               11.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
                      Clearing of Vegetation
               12.    Prior to felling or pruning, all trees are to be inspected for wildlife (i.e. koalas, possums, birds’
                      nests etc). If wildlife is present, the tree must not be felled or pruned until the wildlife has left
                      the tree or has been removed by a qualified person*.
                      *(Refer to Advisory Note)
               13.    Vegetation removal or pruning must be undertaken in a manner that avoids damaging
                      surrounding vegetation and habitat.


                                                                                                             Page 3 of 8
Document Set ID: 23632641
Version: 2, Version Date: 14/03/2025

Page 4

               14.    Tree protection fencing must be installed under the supervision of the Project Arborist.
                      Retention of Existing Trees and Vegetation
               15.    No removal of additional trees within the road reserve is permitted without Council’s prior
                      written approval.
               16.    All tree and vegetation removal works must be undertaken by a qualified person*.
                      *(Refer to Advisory Note)
               DURING CONSTRUCTION
                      Engineering
               17.    The integrity and condition of any existing public or Council infrastructure and services
                      (above ground and/or underground) must not be adversely affected by the proposed works
               18.    The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               19.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      the approved plans/documents and conditions detailed in this Decision Notice
                      b.      all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines
                      c.      the latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                     Works within Road Reserves
               20.    Safe access on all streets in the vicinity of the development must be maintained at all times.
                      Should footpath/road closures be necessary to carry out construction works, Council’s
                      Engineering Officer must be notified prior to the proposed closure and all requirements
                      complied with.
               21.    All works must match neatly with existing road and verge/ features. Additional works beyond
                      the driveways may be required to provide an acceptable transition to existing road and verge
                      profiles.
                     Driveways
               22.    Driveway crossovers must be constructed generally in accordance Council’s Standard
                      Drawings RS-056 together with any associated addendum
               23.    The following must be complied with during the construction of the required
                      crossover/driveways:
                      a.      the driveways must be in accordance with the requirements of AS2890.1 Off-Street
                              Car Parking for longitudinal and crossfall gradients.
                      b.      the driveways must be constructed so as to not concentrate or direct stormwater runoff
                              onto neighbouring properties or the road formation
               24.    Pavement design for privately owned works must be undertaken in accordance with the
                      relevant standards. Structural integrity of the driveways will remain the responsibility of the
                      property owner/developer.
                      Stormwater Drainage
               25.    The constructed driveways must not cause additional ponding on the road formation or the
                      road reserve.




                                                                                                        Page 4 of 8
Document Set ID: 23632641
Version: 2, Version Date: 14/03/2025

Page 5

                      Environment (Erosion and Sediment Control)
               26.    Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must
                      not be released from the site or to waters within the site, or be likely to be released should
                      rainfall occur, unless all reasonable and practicable measures are taken to prevent or
                      minimise the release and concentration of contamination.
               27.    The contractor must ensure non-essential exposure of soil is prevented by restricting the
                      extent of works and minimising the duration of soil exposure to adverse weather conditions.
                      Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and
                      prior to any predicted rainfall occurring.
               28.    Erosion and sediment control measures must be installed and maintained to minimise
                      erosion on the site and to minimise the export of sediment and associated pollutants from
                      the site. The erosion and sediment control measures must be designed, installed and
                      maintained in accordance with current best practice standards (refer to advisory notes).
               FOLLOWING CONSTRUCTION
               29.    A final inspection and approval of the new driveways and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.
               30.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the requirements of this Operational Works
                      permit and that the driveways are safe for the intended use.
                      Bonds
               31.    Bonds must:
                      a.      meet the requirements of council’s relevant Planning Scheme Policy for performance
                              and uncompleted works.
                      b.      be lodged with Council.
                      c.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes
               1.     As the driveways are private structures, the owner bears full responsibly for the standard of
                      their construction, maintenance and any liabilities associated with their construction. It is
                      recommended that professional advice be sought for the construction of the driveway to
                      ensure that the driveway is constructed in accordance with the approved plans and the
                      standard drawing.
               2.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
                      of the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               3.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.




                                                                                                       Page 5 of 8
Document Set ID: 23632641
Version: 2, Version Date: 14/03/2025

Page 6

               4.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Prestart Inspections Request
               5.     Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
                      business days notice of preferred inspection time.
                      It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business
                      days must have passed or the applicant must have provided Council with written confirmation
                      that the applicant has accepted the conditions of Decision Notice and waived their appeal
                      rights.
               6.     If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.
                      Environmental Advisory Notes
               7.     The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               8.     Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control
                      Retention of Existing Trees
               9.     The existing trees on adjoining properties must be retained and protected during construction
                      wherever achievable. To avoid doubt, this advisory note is not intended to exclude the
                      operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following
                      construction of the development which is the subject of this development approval.
                      Qualified Person
               10.    Qualified Person, for the purpose of:
                      a.      Undertaking rehabilitation construction and establishment works is considered to be a
                              person with five years current experience in revegetation and regeneration.
                      b.      Undertaking, supervising tree works and preparing arboriculture certification, is
                              considered to be a person with a minimum three years current experience in tree
                              protection, hazard identification/mitigation and Specifying Trees – a guide to
                              assessment of tree quality (NATSPEC) assessment and either:
                              i.       International Society of Arboriculture (ISA) certification; or
                              ii.      A Diploma of Arboriculture.
               11.    Managing Fauna protection is considered to be a certified Fauna Spotter Catcher.
                      Aboriginal Cultural Heritage Act 2003
               12.    There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources


                                                                                                         Page 6 of 8
Document Set ID: 23632641
Version: 2, Version Date: 14/03/2025

Page 7

                        Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                        that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                        of Aboriginal cultural heritage.
                        You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
               Infrastructure Charges
               13.      All developments and/or changes to existing developments may require payment of
                        “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                        made pursuant to the planning legislation and regulations current at the time of issue. For
                        further information, please refer to https://www.noosa.qld.gov.au/planning-
                        development/development-tools-guidelines/infrastructure-charges
               7.       PROPERTY NOTES

               Not applicable.
               8.       VARIATION APPROVAL DETAILS

               Not applicable.
               9.       FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.
               10.      SUBMISSIONS

               Not applicable.
               11.      RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               12.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.



               Yours faithfully,




               Mark Lewis
               Coordinator-Engineering



               Enc:     Appeal Rights
                        Approved Plans/Documents



               DECISION NOTICE HISTORY
               •     Original Decision Notice – 24 January 2022.

               •     Decision Notice - Minor – OPW21/0202 – 11 March 2025, with an amendment to condition 1.




                                                                                                               Page 7 of 8
Document Set ID: 23632641
Version: 2, Version Date: 14/03/2025

Page 8

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 8 of 8
Document Set ID: 23632641
Version: 2, Version Date: 14/03/2025

Used in these records

About this file

File size
161 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval OPW21 0202 01 (As Published).pdf · 161 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.