RFI - 20220072 Ross Cr SWMP
2. A shakedown area is to be installed at the construction entry/exit to the proposed development area to
minimise sediment being transported to and from the site.
3. Downstream pits within the road reserve are to be protected through filter socks or similar.
4. Diversion of upstream catchments around any exposed areas using diversion drains around the site.
4.2. Operational Phase
The development consists of a residential dwelling which is not considered to significantly alter the pollutant
generation potential of the site, and therefore no additional stormwater quality treatment is proposed for the
development.
Project number 20220072
File RECOR Preliminary Stormwater Management Report - 20220072.docx, 2022-09-02 Page 10 of 14
Revision 1
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.