RFI - 20220072 Ross Cr SWMP
The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
Table 3.1 Existing and proposed unmitigated site peak discharge rates
Ross Crescent
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.017 0.017 0.000 0%
50% 0.019 0.021 0.002 11%
0.2 EY 0.028 0.030 0.002 7%
10% 0.037 0.037 0 0%
5% 0.042 0.042 0 0%
2% 0.048 0.049 0.001 2%
1% 0.054 0.054 0.000 0%
As expected, the site has increased the total peak flows from the site for a number of storm events. The magnitude
of the change is considered acceptable as the increase in flow rate for frequent events is only 2L/s from the existing
site, and an increase of 1L/s for a 1 in 50 year event – a rare frequency rate. This change is considered relatively
insignificant.
In addition, the surrounding land parcels are not subject to flooding risks due to:
• Elevation of the land; and
• Rapid infiltration of groundwater into the soil.
As the drainage characteristics of the site have not been significantly altered and are unlikely to result in impacts to
downstream properties, no attenuation of peak flows is proposed for the development.
Project number 20220072
File RECOR Preliminary Stormwater Management Report - 20220072.docx, 2022-09-02 Page 8 of 14
Revision 1
P +61 7 5211 1003 A 75 Noosa Dr, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.