13. The jetty is to be used for private purposes only with no commercial operations to be
undertaken.
14. Boat repair activities are not permitted on site.
15. Wastewater and sullage must only be disposed of at approved pumpout facilities.
16. The mooring facility must not be utilised for live-aboard purposes.
17. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 2009.
18. Certification by a Registered Professional Engineer of Queensland that states that the
pontoon and gangway is constructed in accordance with best practice methods and is
structurally sound must be submitted to Council. This certification must be submitted to
Council within three (3) months of the completion of the works. A final inspection and
approval of the structure by Council’s Inspector is also required. Please contact Council’s
Development Assessment Branch on 5329 6500 to arrange the inspection.
19. This approval lapses where the construction of the jetty has not commenced within two (2)
years of the date of issue of the approval, unless application is made and approved by
Council for an extension.
20. After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans
5. REFERENCE DOCUMENTS
Not applicable.
6. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP SARA Planning Regulation The agency provided its
at DILGP Via MyDAS2 2017 Schedule 10, part response on
at https://prod2.dev- 17, Division 1 - Tidal 15/06/2025 (Reference
assess.qld.gov.au/suite Works or work in a No. [2506-46399
/ (for assistance, Costal Management SRA]). A copy of the
contact DILGP at 5352 District response is attached
9701 or
email:[email protected]
7. ADVISORY NOTES
General Advisory Notes
1. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
of the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
2. The approval or conditions do not absolve the owner of the land from complying with all the
conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant
statues and/or statutory regulations in the execution and/or performance of said works.
Page 6 of 7
Document Set ID: 23818641
Version: 5, Version Date: 19/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU25 0059.pdfRelated documentApplication case desk ↗
Delegated Report - Code - Planning MCU25 0059.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.