Decision Notice - Approved by Delegation of Authority MCU25 0041 & OPW25 0063 (As Published) · MCU25/0041
Attachment 1—Referral agency conditions 2505-45003 SRA (Under section 56(1)(0)(i) of the Planning Act 2076 the following conditions must be altached to any development approval relating to this application) (Copies of the documents referenced below are found at Attachment 5) | Conditions Condition timing Development Permit —- Operational Work Schedule 10, Part 17, Division 3, Table 2, Item 1 — Tidal works or work in a coastal management district - The chief executive administering the Planning Act 2016 nominates the Director-General of the Department of Transport and Main Roads to be the enforcement authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions: Approved plan(s) 1. The development must be carried out generally in accordance with the following plans: « Site plan and water allocation prepared by Marine Structures dated 15/01/2025, drawing no. TJS-05028-01, Revision B « Layout plan prepared by Marine Structures dated 10/02/2025, drawing no. TJS-0528-02, Revision B. At all times Lighti ing (a) Light/mark all vessels, structures, plant and equipment associated with: i. the works, in accordance with the following specifications: * any anchors deployed must be marked with yellow buoys and fitted with FL yellow lights fitted ii, operations, in accordance with the following specifications: * — section 3 of AS4282-1997 Control of the obtrusive effects of outdoor lighting (b) Lighting provided must not obscure, disguise or otherwise interfere with the safe navigation of other vessel, including the effectiveness For the duration of works for operational to be maintained at all time Document Set ID: 23772192 Version: 0, Version Date: 01/01/1900 of navigational lighting. Protection of navigable waterways 3. The construction, operation and maintenance of the pontoon and any For the duration of ship berthed, moored or attached to the structure, must not: works, and at all (a) encroach into, pass over or under a navigation corridor times (b) be located in a high-risk maritime zone (c) impede the safe navigation of other ships or boats (d) restrict safe access to or from neighbouring structures. 4. Remove and dispose of any debris or similar obstruction encountered For the duration of whilst undertaking the work at an appropriately licensed facility. works, and at all times 5. All piles and/or structure to be demolished both above and below the Prior to the waterline must be completely extracted/removed. completion of the works State Assessment and Referral Agency Page 3 of 6 Page 9 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority MCU25 0041 & OPW25 0063 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 915 KB (small file)
- File type
No other editions are linked here.