Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Decision Notice - Approved by Delegation of Authority MCU25 0041 & OPW25 0063 (As Published) · MCU25/0041

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Attachment 1—Referral agency conditions

2505-45003 SRA

 

(Under section 56(1)(0)(i) of the Planning Act 2076 the following conditions must be altached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)

 

| Conditions

Condition timing

 

Development Permit —- Operational Work

 

Schedule 10, Part 17, Division 3, Table 2, Item 1 — Tidal works or work in a coastal management
district - The chief executive administering the Planning Act 2016 nominates the Director-General of the
Department of Transport and Main Roads to be the enforcement authority for the development to which
this development approval relates for the administration and enforcement of any matter relating to the

following conditions:

 

Approved plan(s)

 

1.

The development must be carried out generally in accordance with the

following plans:

« Site plan and water allocation prepared by Marine Structures
dated 15/01/2025, drawing no. TJS-05028-01, Revision B

« Layout plan prepared by Marine Structures dated 10/02/2025,
drawing no. TJS-0528-02, Revision B.

At all times

 

Lighti

ing

 

(a) Light/mark all vessels, structures, plant and equipment associated
with:
i. the works, in accordance with the following specifications:
* any anchors deployed must be marked with yellow
buoys and fitted with FL yellow lights fitted
ii, operations, in accordance with the following specifications:
* — section 3 of AS4282-1997 Control of the obtrusive
effects of outdoor lighting
(b) Lighting provided must not obscure, disguise or otherwise interfere
with the safe navigation of other vessel, including the effectiveness

For the duration of
works for operational
to be maintained at
all time

 

 

 

 

 

 

 

 

 

Document Set ID: 23772192
Version: 0, Version Date: 01/01/1900

of navigational lighting.
Protection of navigable waterways
3. The construction, operation and maintenance of the pontoon and any For the duration of
ship berthed, moored or attached to the structure, must not: works, and at all
(a) encroach into, pass over or under a navigation corridor times
(b) be located in a high-risk maritime zone
(c) impede the safe navigation of other ships or boats
(d) restrict safe access to or from neighbouring structures.
4. Remove and dispose of any debris or similar obstruction encountered For the duration of
whilst undertaking the work at an appropriately licensed facility. works, and at all
times
5. All piles and/or structure to be demolished both above and below the Prior to the
waterline must be completely extracted/removed. completion of the
works
State Assessment and Referral Agency Page 3 of 6

Page 9 of 14

Used in these records

About this file

File size
915 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority MCU25 0041 & OPW25 0063 (As Published).pdf · 915 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.