Council archive · source document
Updated Planning Report (002) · MCU22/0052
Bushfire Overlay Comment:
Development will be located within mapped
potential impact buffer and medium potential
bushfire buffer intensity. Water tanks will be
provided on site and can be conditioned by
Council accordingly. Pathways will be
provided with signage to allow safe access
and provide directions for firefighting vehicles
while enabling easy departure for visitors in
the event of a bushfire. Given management
will be present at all times on site, any
existing or possible situations which may
occur in the area can and will be monitored
by staff.
Development complies or can be
conditioned to comply with PO1 to PO8.
Flood Hazard Overlay Comment:
Habitable Floor level of all proposed
structures will meet the FFL requirements of
the code. Given the permanent tents are
outside of the flood mapping, this would be
able to be conditioned by Council.
A flood evacuation plan can be prepared and
supplied to Council prior to Building approval
as a condition if required. Given the flooding
would pose so significant risk to the visitors
on site the development is compliant with the
requirements of the Overlay Code.
Development can be conditioned to comply
with the Flood Hazard Overlay Code.
Page 14 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Updated Planning Report (002).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.