NOOSA COUNCIL IDAS Development Application Decision Notice                                                   3 of 8




                                     Noosa Council Conditions
                                     INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


1.     The development shall be carried out in accordance with Engineering drawings Nos. 0202 –
       06,07,08,09,10,11,12,13,16 dated 12 January 2006 and as prepared by Callaghan & Toth or as modified
       herein.

2.     The minimum depth of asphalt must be 30mm, which complies with Council’s standard.

3.     The construction of the jetty and sewerage works as shown on the plans do not form part of this approval.

4.     The total required pavement thickness shall be based on the Department of Transport’s Pavement Design
       Manual using soaked CBR tests of the subgrade.

       The design pavement thickness, together with CBR test results shall be submitted to Council’s Manager -
       Land Development for approval prior to placement of pavement material.

5.     A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the pre-start
       meeting. The pre-start meeting will only be held once Council's Construction Technical Officer has
       confirmation that the bond monies have been received by Council.

       The bond will be refunded less any costs incurred by Council in ensuring compliance with these conditions
       or any additional inspections incurred for substandard work or work undertaken not in accordance with this
       permit.

6.     The names of any proposed contractors for works are to be submitted in writing, together with copies of
       current Public Liability and Workers Compensation Insurances, for consideration for approval by the
       Manager-Land Development seven (7) days prior to pre-start meetings and commencement of works.

       A separate letter will then be issued approving the Contractor (or otherwise) for the works. No other
       Contractor or Subcontractor shall be engaged to carry out the works or any part of the works without the
       written approval of the Manager-Land Development.

7.     Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of
       intention to commence works to arrange a “pre start” meeting regarding the civil works.

8.     Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
       signed approved drawings and conditions by the applicant.

9.     The Consulting Engineers for the project shall be currently Registered Professional Engineers of
       Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
       Council’s Construction Technical Officer or nominated staff. Council’s Construction Technical Officer shall
       provide an inspection form for signing off by the Engineer at appropriate stages of construction, during on-
       site meetings. Construction Technical Officer will also sign the form at each stage when conditions
       required have been satisfied. The works will be accepted “On Maintenance” after this form, signed by the
       inspector for each stage is complete, together with a letter from the Engineer requesting that the works go
       “On Maintenance”.

10.    Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project. (This
       person will be the contact for the project).

11.    Council standards shall apply to these works unless otherwise modified herein.

12.    The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
       during the construction of the engineering works to ensure that Council property, road pavements or
       facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
       furniture etc.) are protected against any damage or interference whatsoever.




AB c:\users\abecker\downloads\ecm_9956728_v1_decision notice.doc

Used in these records

About this file

File size
223 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

142006.933 - Decision Notice.pdf · 223 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.