Original source · versioned page text
Appendix A - Proposal Plans
Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn CH 00
CH 20
CH 40
14 .0
2
0.
RL h 00
C
RL 140
origin
al sur
face
13 2.3
4
3.2
4.
RL h 3
Cut Area constructed surface
C
Fill Area
2.3
13 .96
6
4.
RL h 8
C
13 0.5
02
0.
RL h 4
C
RL 130
Richard Henderson Geoff Lot 17 SP133492
Cert.Prof. (CP) Member of SSSI #12546
Mobile: 0417 703 607 rh 36 Tunba Ct
E: [email protected]
RH 14/10/21 Section
ABN 89 022 151 267
Rev No. Date Revision Details Rev By Ver By App By
Arbitrary Arbitrary 1:200 - Sheet 1 of
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.