Notes for Construction & Maintenance of Timber Decks:
Builder to adhere manufactures specifications or industry standards at all times &
Owners to follow manufactures details for maintenance & cleaning of deck
18000
All timber posts to be naturally durable Class 1 or 2 above ground or softwoods H3 treated if
supported on bracket if in ground to be H5 Treated soft or hardwood. 70 70 70 70 70 70 70
Recommend brackets or supports be used & Bitumen paint be applied to the top 200 mm of 2740 2971 900 1000 900 1048 1000 2954 3666
bracket in the concrete.
Posts to have a Minimum 75 mm clearance from the base of the post to footing or slab & post to
be 10 mm above cross member of bracket. End grain of post to be sealed prior to erecting. 2426 0906 0915
Top of concrete pad footing to be mounded to fall away from support to prevent water from Roller-Door SW SW
400
ponding 820
Bearers, Hardwood to be H3 treated if less than 400 mm above ground H4 for touching ground H5
770
Storage
Storage
for in ground. Bathroom
WC VTY SHR EF
Joists as bearers depending on ground clearance. Joists to have Malthoid strip or bituminous Carpet
720
720
paper fixed to top of joists. Softwood & Engineered manufactured timbers bearers & joists to be
3300
Bedroom
1218
SW
720
H3 min treated at all times. Approved connectors be used for treated timbers & location. CF
Drive Through Carport
S
720
Laundry
Recommend hot dip galvanized or stainless steel connectors & fixings be used at all times. WM
WIR Openings
Especially where inspections are not possible deck is to close to ground or decking to be screwed 300x900 - 3000 to top
in place to allow for easy removal to inspect sub-floor for any issues Tub
70
820
7500
Timber Queensland recommend that all timber has a moisture content of 15%
Decking boards to be fixed with 2/nails or screws & staggered or offset along the joists. Holes at S S REF
ends of boards to be drilled holes to be 80% of nail diameter & 12mm from ends of boards. Nails Concrete Floor
& screws to finish flush with top of boards (Not Punched). Nails or screws to be hot dipped Garage
(Cabinetry by Others)
Secondary Residence
0918
Kitchen Area
SW
galvanized or stainless steel. Stainless Steel to be used within 900 mm of pools Concrete Floor Concrete Floor
3758
Living Area
All Framing Anchors, Fixing Plates, Nailing Plates, Joist hangers to be Galvanised Minimum or Workshop CF CF
Stainless Steel where Construction within 2.0 km radius of open coastal areas
Ends of boards to be slightly undercut at joints. Gaps between decking boards to be min 3 mm to
UBO
HP
5 mm
(Check with supplier Gaps range with different Types of timbers)
Decking boards to be fully sealed (Oiled, Stained, Painted etc.) prior to fixing.
Recommend a light coloured sealer, with UV protection and a fungicide to be used 1218 1218 2130 1218
SW SW AStD SW
Maintenance & inspection of deck by Owner is to be carried out regularly
2380
2470
Sweep or blow, leaf or other debris off deck. Hosing or use of water to be avoided. Keep the gaps Timber Decking
between decking boards clear of dirt & debris.
Reseal decking boards when required by manufactures recommendations
90
70x35 MGP10 Timber frame to
Inspect all connections for corrosion or movement regularly (Twice Yearly) Steel Portal Frame provided by Manufacturer
Pot plants to be on stands with a drip tray underneath & moved around regularly to prevent Dimensions may vary depending on positions of Portal Frame
uneven weathering of the deck and wall thickness required to cover steel portal framing 7760
Secondary Residence Floor area to be No Larger than 65 m²
As plans drawn approx 61 m² S : Smoke Detectors
2365 2365
Accolade Building Designs recommends that Builder & Home Owners read Domestic Deck Design 90 90 90 CF: Ceiling Fans
Guide EF: Exhaust Fan
Secondary Residence Area: 60.9 m² 5000 2139 UBO: Under Bench Oven
Available on line www.timber.net.au Timber Deck: 12.4 m² HP: Hot Plates
Workshop, WC Storage Area: 31.1 m² REF: Fridge Space
Garage Area: 22.4 m²
Carport Area: 20.6 m²
TOTAL AREA: 147.4 m²
Floor Levels Approx. Builder to determine exact levels on site
2nd Residence Plan
1 1 : 100
Plans Altered to Suit changes made during Building
Materials Used & position of Building
Client: Brad Allen Address: 26 Crystal St. Cooroy Noosa Shire Council Mobile: 0407 693 018 Date 27/04/2020 11:26:08 AM
ACCOLADE Building Designs Drawn by; S.Horn Drawn for A3 Sheet
RPD: Lot 28 on RP 32777 Site Area : 1374.8 m² Wind Classification N3 Proprietor: Steven Horn Email: [email protected]
Project Number 1118AB28
Proposed New Residence, Carport & Second Residence on SHS posts, Timber Frame, Sheet Roof QBSA Lic. 54806 Issue Date: 27 - APRIL - 2020 Scale 1 : 100 Sheet No. 9 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Plans Altered 26 Crystal St Cooroy 27-04-20.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.