ORDINARY MEETING AGENDA 21 JULY 2022
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
11. Certification must be submitted to Council from all relevant service providers
(Energex, NBN and Unitywater) which certifies that the development has met the
requirements of this Decision Notice and all applicable legislation at the time of
construction.
Easements
12. Existing easement Emt A on RP87371 (Easement for Access within Lot 3 on
SP327330 to benefit Lot 1 on RP87371 – RP87371 is now contained within Lot 5
on SP213104) is no longer relevant for its intended purpose, and must be
extinguished prior to sealing of the survey plan.
13. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
14. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
15. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
16. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
2 MCU21/0228 & OPW21/0364 – CHANGE REPRESENTATIONS TO A
DEVELOPMENT APPROVAL FOR MULTIPLE DWELLING AND OFFICE, AND
ROADWORK, DRAINAGE WORK, LANDSCAPING, STORMWATER, EARTHWORKS
- 245 DAVID LOW WAY PEREGIAN BEACH QLD 4573
In accordance with Chapter 5B of the Local Government Act 2009, Cr Stockwell provided the
following declaration to the meeting of a declarable conflict of interest in this matter:
I, Cr Stockwell, inform the meeting that I have a declarable conflict of interest in this matter in
relation to the application by Altum Properties Group listed as Item 2. On 24 February 2020 I
sought a review by the Independent Council Election Observer (ICEO) as to the public claims of
the Future Noosa Team, of which Leigh McCready was publicly identified as a Campaign
Manager. Leigh McCready is associated with the applicant. Although I have a declarable conflict
of interest, I do not believe a reasonable person could have a perception of bias. Therefore, I will
choose to remain in the meeting room. However, I will respect the decision of the meeting on
whether I can remain and participate in the decision.
That Planning & Environment Committee Agenda Item 2 be referred to the General
Committee for further consideration.
Page 7 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.