INTEGRATED PLANNING ACT 1997
Works that take overland flow water

The relevant witd river declaration will state
works that take overtand flow water are either
scif assessabie or assessable, or are exempt
from wild river requirements.

Wf you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

I you ticked Q13 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Witd Rivers Code
and must comply with the code,

if you ticked Q13 iil) your application is not
‘Subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, setf-assessable or
exempt will not be accepted.

13.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

Oo NO O YES (ensure you have completed Part Ke of Form 1)

If YES, is the application for works stated in the relevant wild river declaration to be?
(Ji) assessable works

(1 ii) self-assessable works

(J ili) exempt works

 

Works that interfere with overland
flow water

The relevant wild tiver declaration will state
‘works that interfere with overtand flow water that
are either self assessable, assessable of exempt
from witd river requirements.

you ticked Q15 j), your application must be
assessed by NRW against the Wid Rivers Code
and must comply with the code.

IFyou ticked Q15 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wid
Rivers Code, otherwise the works become
assessable development for which an apptication|
is required and must be assessed by NRW
against the retevant part of the Wild Rivers Code
and must comply with the code.

IFyou ticked Q15 itl) your application is not
‘subject to wild river requirements.
Apptications for devetopment that is other than
thal stated to be assessable, self-assessable or
exempt will not be accepted.

Does the application involve works that interfere with overland flow water in a FMA?
oO NO O YES (ensure you have completed Part Kia of Form 1)

If YES, is the application for works stated in the relevant wild rivers declaration to be?
(1) assessable works

Li) setf-assessable works *

Cit) exempt works

 

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
If you answered YES to Q16, your application
must be assessed by DPIF against the Wid
Rivers Code and must compty with the code.

16.

Does the application involve building or raising waterway barrier works in a PA?
Ono (I YES (ensue you have completed Part Os of Form 1)

 

Aquaculture (non ERA)
Applications for aquacutture in a HPA will not be
accepted.

If you answered YES to Q17, your application
must be assessed by DPIF against the Wid
Rivers Code and must comply with the code.

. Does the application involve aquaculture in a PA?

(no

LI YES (ensure you have completed Part O: of Form 1)

 

Works that interfere with water in a
watercourse

Note: Ifthe development is proposed in a HPA,
apptications for alt works that interfere with water
in a watercourse (including dams or weirs,
‘steam feafignment or stream diversion) will not
de accepted,

ina PA, applications for instream dams and
weirs may be accepted in nominated waterways.
If you ticked box ii) in Q19, your application will
net be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
fiver requirements.

More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
www. now. qtd.gov.au or contacting the
department by email on:

wild. [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

(no LL] YES (ensure you have completed the retevant Part K of Form 1)

. IFYES,

Oo i) The application is for an instream dam or weir; or

Di The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

Page 13

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0773 - Preliminary building work assessable against planning scheme [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.