Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

07/0773 - Preliminary building work assessable against planning scheme [As Published] · 172007.773

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Land owner’s consent (if applicable) 20. Land owner's consent to the making of this application:

Section 3.2.1(3) of the IPA prescribes that an
apptication must contain, or be supported by, the Name Signature Date
written consent of the land owners, if the appScation

involves: !

() a material change of use; ® Louise CARDEW

(i) reconfiguration of a tot,

{@) work on land below highwater mark & not within 2
canal as defined under the Coastal Protection and
Management Act 1995;,0r

{iv) work on rail conidor tand defined under the
Transport Infrastructure Act 1994.

Saction 3.8.1(2)(a) of the IPA provides that

landowner’s consent is not required for a mobile or

temporary ERA .

For more Information refer to Guide 1,

 

 

 

 

 

 

 

 

 

 

Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Soction 3.2.1(5) atthe PA foauis evidence of at quarry praterial on State coastal land under the Coastal Protection and Management Act 1995)?

entiten given applications
wove a presorbed Sta resourco, Tho. goto az DYES - goto a22

Section 3.2. 1{10) of the IPA ibes that . es . -
seca i en to De property nado 22. This application is accompanied by evidence: (tick applicable box)

wine atence ne ores endibernert, CA(i) of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(vi)
Advice for completing 024 & 22 araeEENEre

Refer to schedule 10 of the Integrated Planning Oi (ii) the chief executive of the department administering the resource is satisfied the

Re jon 1998 that prescribes the nature of evidence ji j f i .
nea the State menpport of the aging ore development is consistent with an allocation of, or entitlement to, the resource ~ go
development application.

Lili) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go fo 023

Advice for completing Q23 23. Evidence of the resource entitlement:
The information in (i) - (v} is mandatory if evidence is

required under 22 (i) or (i) above, (i) Resource entitlement / authority details (vii) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the ficable)

application involves any water or riverine quarry (ii) Name of delegated officer
San 3.25 eos Cd
Section 3.2.1(5A) allows the reson oat to mit
the time the evidence may be used. 023 (vi) must be "ii it i
Tete tre we toe died (iii) Position of a officer

(iv) Signature of delegated officer

 

 

 

 

 

 

 

 

 

 

 

 

 

(v) Date
(vi) eo date of evidence a
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
Tucci Pa Ame Bot he Form pate AYES (TINO - the assessment manager may refuse to accept this epplication on the
must be completed for all other applications. grounds that the appfication has not been property made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
eee Sembee eee Plan ! Drawing / Report Number Title Date
manager, referral agencies and any person viewing e
the application during public scrutiny of pubic

notification to understand the scope of the proposal
‘and any potential impact.

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accep! an application that, at the time of lodgement, fails to provide all applicable Information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY (eppicabie to assessment manager's)

[ee S25 | secemeo | 7/5/07 |S mes PS Conn | nomsens 17/993 |
Notification of Engagement of Private Certifier (Optional forma!

To, Council. { have been engaged as the private cerlifier for the building work referred to in this application,

 

Date ofengagement’ / / Accreditation Number. Name:, Signature:

 

 

 

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0773 - Preliminary building work assessable against planning scheme [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.