07/0773 - Preliminary building work assessable against planning scheme [As Published] · 172007.773

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
Tore information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Unless you answered "none of the above” tp 09,
the application requires assessment by the
Environmental Protection Agency (EPA),

if an agency other than EPA is the assessment
manager for the application, EPA is a
coneurrence agency for the application in
felation to this matter.

Local government is the assessment manages
for afl prescribed tidal work.

IDAS Assessment Checkfst, Version 20, 2 April 2007

The application involves operational work that is: (tick the applicable box/es)

tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; Of

tidal work that is prescribed tidal work" other than in a canal2 -complete Part P of Form 1:

Oo
Ow
Di

or

Carried out within a coastal management district under the Coastal Act and for - complete

Part M of Form 1 if any box/es (a) to () below are ticked.

(1 @) constructing or installing works in a watercourse between MHWS and HAT (ie.
othes than those works in tidal water} where the development has been determined not
to be assessable against the Water Act 2000;

constructing a canal intended to be connected to tidal waters;

Oo
Oo
O@
O@
Oo
O@

On
Oo

Constructing an artificial waterway;
teclaiming land under tidal water;

disposing of dredge spoil or other solid waste material in tidal water:
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State

Coastal land above high-water mark;

Temoving or interfering with coastal dunes on jand, other than State coastal land,
that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark: or

my none of the above.

 

Operational work below high water
mark
For more information refer to Guide 18. For
more information about prescribed tidal work in
toca! government tidal areas refer to Guide 24.
Untess you answered "none of the above" to
Q10, the application riggers referral to .
Queenstand Transport (QT (Maritime Safety
Old) as a concurrence agency.

* Local goverment is the assessment manager
for al prescribed tidal work.

10. The application involves operational work that is: (tick the applicable box/es)

[1 @) tidal work as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - compleie Part M of Form 1; OF

C1 fii) tidal work that is prescribed tidal work" - complete Part P of Form 1; 01 ;
CO fi) carried out within a coastal management district"S under the Coastal Act and for -

Of)

Oo)
Oo

disposing of dredge spoil or other solid waste material in tidal water - complete Part

Mof Form I,

feclaiming fand under tidal water - compiete Part M of Form 1; oF
constructing a canal, if the canal is associated with reconfiguring a lot - complete

Part M of Form I,

Mw none of the above.

 

Coastal management

For more information refer to Guide 18.
Unless you artswered “none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
Tetation to this matter.

 

11.

The application involves: (tick the applicable box/es)

Oo
Oi

O Gi)

a material change of use assessable under a planning scheme involving operational

work carried out completely or partly in a coastal management district

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

« the construction of a new premises with a GFA"® of at least 1000m2

« the entargement of the GFA of existing premises by more than 1000m?
reconfiguring a lotassessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

CG) reconfiguring a fot” assessable under schedule 8 of the IPA and in connection with

(v) none of the above

« the construction of a canal - complete Part M of Form 1

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and

12 Cana} means canal as defined under the Coastal Protection and Management Act 1995.

13 Tidal work is defined in sch 10 of the IPA.

| Management Reguiation 2003 and inckudes certain tidat works completely or partly within a local governmers tidal area,

“ Prescribed tidal work is defined in the Caastat Protection and Management Reguiaton 2003 and includes certain tidal works completely or partly within a local gavenment tidal area,
15 Coastal management districts defined in sch 10 of the [PA and means a coastal management district under the Coastal Protection and Management Act 1995, oher than an area declared as a

coastal

district under section 47(2) of that AcL

16 GFA's defined in sch 14 of the IPA to mean the gross foot afea. For a defintion of how to calatated GFA, go to the planning scheme against which the application is being assessed.
17 Under $117 of the Coastat Protection and Management Act 7995, an appication for reconfiguration, where the reconfiguration is associated with the constnection of an artificial waterway, must be
accomparted by the appication for the operational works to constuc the artificial waterway.

Page 4

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0773 - Preliminary building work assessable against planning scheme [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.