Att5 - Traffic Impact Report
6 Conclusions
Following the assessment and analyses presented in this report, it is concluded that:
An empirical assessment of the site’s car parking demand, based on a similar operation, is that
38 cars are required.
The proposed 126 car parks (88 formal, 38 informal) on the site is readily capable of
accommodating the anticipated demand.
The site is anticipated to generate some 14 vehicle movements in the road network PM peak hour,
which is less than that likely to have been generated by the former golf course use (19 trips).
The key likely traffic impact of the development is associated by the increase in heavy vehicle (bus)
movements. Assuming there are two camps per Village per week at full capacity, there could be
56 bus movements per week (maximum 28 bus movements per day).
The car parking is either existing, or informal, with the informal (new) parking designed in
consideration of the Australian Standards.
Appropriate on‐site accessibility by 12.5m and 14.5m rigid vehicles has been demonstrated by
swept path assessments.
www.bmctraffic.com.au 11
BMC22089: 59 Kabi Road, Cootharaba
8 August 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.