Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463

of 92

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (76.1 MB): may take a few minutes to open.

Log in to see the plans as drawn
Fire Safety Management Procedure                   -
                                                        Alternate Building Solutions


                "Insert here a copy of the relevant Fire Safety Management Procedure"
                                                                                                     in
    If EWSS is installed to provide redundancy (as an enhancement and not as a condition of consent)
                           protection of Support Building, provide activation details.

 Additional Information to assist you in completing this Section:


 Fire Safety Management Procedure


 If building work for the building involved an alternative solution included will be a "fire safety management procedure" as a
 condition of the occupation and use of the building.

                                                                                                            in the procedure
 As well as a copy of the "fire safety management procedure" any relevant conditions mentioned
 must be incorporated in this fire and evacuation plan.


 Examples of fire safety management procedures:

   .Limitations on the use of finishes with fire hazard properties as defined under the SCA
   .Prohibitions on storing hazardous materials above a stated height
   .Limitations on storing or using stated materials
                                                                                                    start of any day
   .
    Requirements that all of a building’s final exit doors be unlocked before it is occupied on the
   .
    Requirements to implement stated evacuation strategies or procedures
   .Restrictions on the number and the distribution of a building’s occupants
   .
    Requirements that evacuation routes be kept clear of fittings and furnishings or be kept sterile
   .Prohibitions on carrying out any hazardous processes or storage mentioned in SCA, Part E1.5, Table E1.5, note 3,
     paragraph (a).




                                                                                                                   ;;;;;/




Fire and Evacuation Plan                                                                                               Page 8 of 8

Used in these records

About this file

File size
76.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13_0463.pdf · 76.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.