Skip to the record
Accept no substitutions.

Council archive · source document

Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463

of 92

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (76.1 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                           l.ANOSCAPE ARCHITECTS:
                                                                                                VEGETATION PROTECTION METHODS:                                                                GRASS TREES:
VEGETATION MANAGEMENT STATEMENT
                                                                                                The extent of vegetation to be retained is shown on this plan. All precautions shall be       The grass trees located within the tree protection zone are the be retained and
SITE DESCRIPTION:

The site is described as Lot 3 on RP 887636 and is located at 2 Girraween Court,
                                                                                                taken to protect this vegetation from loss or damage resulting from the impact of site
                                                                                                works. This includes but is not limited to; loss or scarring of tree limbs or trunk,
                                                                                                                                                                                              protected as detailed earlier under the heading Vegetation Management Methods.
                                                                                                                                                                                              The grass trees which have been identified for translocation are to be removed either
                                                                                                                                                                                                                                                                                                     .~
Sunshine Beach. The subject property is bounded by Girraween Court to the south,                unspecified removal of tree and the compaction of the soil under the tree canopies.
Eenie Creek Road to the north, the Noosa Tennis Academy to the west and the                     Protection methods for trees that are to be retained include, but not limited to; providing
                                                                                                                                                                                              singularly or in clusters by a suitable experienced contractor and under the direct
                                                                                                                                                                                              supervision of a fully qualified arbourist using industry recognised best practice
                                                                                                                                                                                                                                                                                                                               in Site
balance of the lot to the east.                                                                                                                                                                                                                                                                                                 E         M          L      A
                                                                                                                                  existing vegetation using temporary construction
                                                                                                a protective barrier or fence to the
                                                                                                                                                                                              techniques and well maintained disease free equipment. Care is to be taken to ensure
The existing vegetation is a blend of regrowth open dry heath with a co-dominance of            fencing. The only works to be allowed inside the enclosure, without prior approval, will      damage to the surrounding vegetation is minimised.                                            .Enviromental Management-Landscape Architecture

Allocasuan"na /ittora/is and Banksia aemu/a and cleared lands. Generally the native             be the removal of debris or rubbish, the application of mulch and/or the planting of new
                                                                                                                                                                                              Once removed from their current position bound the root ball with moist hessian to                                                        InSITE EM LA
vegetation growing on this property are species which naturally occur in the regional           vegetation where required.
                                                                                                                                                                                              ensure no loss of soil from around   the roots and place directly within a pre-prepared                                                P.O. BOX 2460
ecosystem 12.2.13.                                                                              The cutting of tree roots should be avoided. In the event of root damage, immediately                                                                                                                                      KEPERRA,QLD 4054
                                                                                                                                                                                              planting hole. The planting hole is to be the same depth as the rootball of the grass
No active koala habitat trees were identified on this site.                                     prune the root with a sharp pruning tool or saw and apply a suitable fungicide to the         tree being translocated but a minimum of 30% larger in diameter. Backfill the planting                                                T: 07 3351 8425
                                                                                                wound.                                                                                        hole immediately using the excavated site topsoils, if suitable, or imported free draining                                            F: 07 3351 8635
For the purpose of preparing this Vegetation Management Plan, only the significant                                                                                                                                                                                                                                                  M: 0421 883 238
trees growing on the site, generally 120mm O.B.H. or greater, were plotted and                  Any damage to the protected vegetation is to be remedied by an approved arborist as           organic topsoil if the site topsoils are deemed unsuitable. Compact backfill material in                                         ABN:89 115 479 046

identified but the intention is to preserve all the native vegetation on site wherever          soon as practicable after the damage has occur and to the satisfaction of Council’s           layers no greater than 100mm in depth to minimise subsidence and water liberally to                               ENAll:[email protected]
                                                                                                representative.                                                                               remove air bubbles.
practicable. This will be done by either retaining and protecting the vegetation in situ or                                                                                                                                                                                                cueNT:

by translocating vegetation where practical and sustainable to locations on site which          WEED REMOVAL:                                                                                 Create a soil bund around each plant to create a watering depression and apply               Christian Brothers
are clear of proposed building works.                                                                                                                                                                                   at a maximum depth of 100mm after settling except for a
                                                                                                                                                                                              recycled forest mulch
                                                                                                While this plan concentrates on the native vegetation found on site it was noted that
VEGETATION MANAGEMENT:                                                                                                                                                                        distance of 50mm from the base of each grass tree in all directions to prevent rotting.
                                                                                                                                                                                                                                                                                           PROJECT:
                                                                                                while undertaking the site surveys no class 1 or 2 declared plants were found, but if
Prior to any works commencing on site all significant trees and the associated                  discovered the presence of the plants are to be reported to Council and removed using         Maintain as specified.’
                                                                                                                                                                                                                                                                                           Noosa Flexible Learning Centre
understorey plants as shown are to be protected with temporary construction fencing             industry recognised and environmentally sound techniques.                                     MAINTENANCE WORKS:
(refer Image VMP 02). This fencing shall remain for the full length of the construction
                                                                                                It was also noted that there were present several weed species that are listed in the         The maintenance periOd of 12 weeks to commence at practical completion & shall
phase to protect the trees from the impacts associated with the development works
                                                                                                Sunshine Coast Regional Council Noosa Plan PSP 03          -

                                                                                                                                                               Landscape Plants and           include;
including earthworks, location and storage of equipment, materials, site sheds and
                                                                                                Guidelines. These plants are listed on VMP02 and are required to be treated using
storage facilities.                                                                                                                                                                                   min 1 visit per week for the first 6 weeks                                           PROJECT No:

                                                                                                industry recognised and environmentally sound techniques by a suitably qualified and
                                                                                                                                                                                                                                                                                            12       186
In general, no work is to be carried out within this fenced off area without an initial
                                                                                                                                                                                                                                                                                                 -




                                                                                                experienced contractor. While this list details all the weeds found on site during the                min 1 visit per fortnight for the 6 weeks following
subsurface root layout map being prepared by a suitable qualified and experience                recent vegetation survey, any plants as listed as Undesirable Plants in the Noosa Plan        works to be carried out during this period includes but is not limited to; watering,
arborist. All works within this area are to be carried out so that no major structural roots    PSP 03 are also to be removed as detailed above.
                                                                                                                                                                                              weeding, pest & disease control, replacement planting, remulching, and keeping the
are affected.
                                                                                                If using herbicide to manage weeds, care must be taken to ensure no over-spray of             site tidy.
A suitably qualified arborist is to be engaged and present at all times during the              herbicide occurs. The Contractor shall be responsible for replacing any plant which has       Refer to Council’s landscape requirements & details for further information.
undertaking of the works to ensure the safety and health of the tree is not                     died or is irrevocably damaged either within or adjacent to the project site caused by
compromised at any time. Any damage to the tree or its roots are to be repaired                 over-spray of herbicide.
without hesitation.
                                                                                                REVEGETATION/REHABILlTATION:
Eradicate all environmental and bushland weeds from the site if detected using an
                                                                                                Prior to commencement of any clearing works, a plant rescue is to be carried oul. The
established environmentally sensitive teChnique.
                                                                                                rescued plants shall either be translocated directly into areas on the site which are
Remove all rubbish, old fences including fence posts and gates, and debris from the
                                                                                                clear of any future works or potted up and taken off site to a suitable location where
site as required and dispose of in an approved manner.
                                                                                                they will be cared for until such time as they can be replanted on site as detailed on
Refer to Engineer’s drawings for details of sediment and erosion control devises.               LP01 and LP02.

All removed vegetation, except weed species unless approved by the Superintendenfs              The translocated plants will be protected with a vegetation protection fence and

Representative, shall be mulched and the material stockpiled on site as directed for            appropriately maintained throughout the construction and establishment phases of the
re-use in landscape works proposed for the development. A suitably qualified arborist           project. The potted stock will be maintained off site before being returned to site after
is to be engaged to inspect and certify the integrity and suitability of the vegetation to be   the completion of construction works and replanted in the revegetation zones as shown
retained.                                                                                       on LP01 at the prescribed plant densities detailed below.


SITE MANAGEMENT:                                                                                REVEGETATION/REHABILlTATION WORKS:

Ensure all vehicles leaving the site are reasonably clean and free from soil and                All works carried out in relation to this plan is to comply with the Sunshine Coast

vegetative material.                                                                            Regional Council Noosa Plan Planning Scheme POlicies (PSP)3           -
                                                                                                                                                                          Landscape Plants
                                                                                                and Guidelines.
Construction personnel are not to allow their dogs, if any, within the area covered by
the Vegetation Management Plan prior to or during clearing works.                               Only plants grown from plant material sourced from this site are to be used for
                                                                                                revegetation works on the site.
FAUNA MANAGEMENT
                                                                                                SITE PREPARATION:
A qualified Fauna Spotter who is fully licensed with QPWS is required to inspect all

vegetation on the development site prior to the commencement of the clearing works              Remove existing concrete pathway as indicated on VMP 01 and 02. Care is to be
for any fauna or habitat features. Any trees identified for removal that are found to           taken to minimise damage to existing native vegetation. Re-trim area to remove all

contain native animals or birds are to be retained until the resident fauna relocate away       depressions and blend new surface levels evenly into adjacent existing levels.
from the site. No fauna is to be physically relocated, but allowed to move on naturally,        All areas to be revegetated shall be cultivated to a depth of 200mm prior to the
unless approved in writing by QPWS.                                                             planting. Take care when cultivating not to bring subgrade soil layers to the top. After
                                                                                                cultivation, remove all stone greater than 25mm diameter.
The Fauna Spotter is to supply a written report to the Council’s Ecologist certifying that
                                                                                                Take care when cultivating over service lines, pipes and around tree roots and if
the site has been inspected and clearing works can proceed.
                                                                                                necessary cultivate with hand tools. Lightly cultivate with hand tools within 600mm of
If deemed necessary by the Council’s Ecologist based on the findings of the Fauna               hard pavements and structures.
Spotter’s pre-clearing certification report, the Fauna Spotter is to remain on site at all      Cultivate parallel to final contours. do not cultivate when soil is wet or plastic.
times when clearing works are progressing.
                                                                                                Test site topsoils to ensure the soil’s ph is between 6.5-7.0 and its fertility is within
Following approval from the Fauna Spotter to commence clearing works, clearing is to            acceptable limits. Ameliorate where necessary.
progress in a methodical manner starting from one end of the site and working
                                                                                                Spread site mulch evenly to a maximum depth of 100mm allowing for settlement.
towards the rear, where practicable.

The Fauna Spotter is to inspect all fallen trees, bark, debris and leaves for resident          PLANTING WORKS:
fauna. Orphaned or injured animals that may require relocation are to be reported to
                                                                                                The only plant material to be used for revegetation is that which was rescued prior to
QPWS on tel: 1300 130372. Only personnel licensed to do so by QPWS are to handle                construction. No supplementary supply of plants are to be used without prior approval
fauna.
                                                                                                of the Superintendent’s representative.                                                                                                                                                              +-              +
                                                                                                                                                                                                                                                                                                      ..

                                                                                                Plantings are to be carried out as random mixtures of plants at the following plant                                                                                                                  r             ~

                                                                                                                                                                                                                                                                                                                    -l--
                                                                                                densities:- 1 Tree per 5m2, 1 shrub per 3m2 and 2 groundcovers per 1 m2.
                                                                                                                                                                                                                                                                                              A      ""22~~For OP WKS Assessment                         -



                                                                                                                                                                                                                                                                                            ltevlslon~                         Desa1pl:Son:-
                                                                                                Water in well at time of planting and then as required to adequately sustain good
                                                                                                healthy plant growth.                                                                                                                                                                      NORTH


                                                                                                Maintain as detailed.

                                                                                                                                                                                                                                                                                           DRAWING TITlE


                                                                                                                                                                                                                                                                                           Vegetation Management Plan                            -
                                                                                                                                                                                                                                                                                                                                                     Notes


                                                                                                                                                                                                                                                                                           DRAWING NUMBER


                                                                                                                                                                                                                                                                                           12-186 VMP 04


                                                                                                                                                                                                                                                                                            SCALf                     DATE                     DRAWN BV:      CHECKED



                                                                                                                                                                                                                                                                                                                      July 2012


                                                                                                                                                                                                                                                                                              ThII pIaow.. prepiI’" brIM     .....oIIN$ITE EM LA Ply Lid to ~
                                                                                                                                                                                                                                                                                              ’’’’’’11’11 mentatlon lor IUbn’&."..not be IIMCI for II’l)’ otMrpurpOM or
                                                                                                                                                                                                                                                                                              IIyIlf1’foltler      lorcorn,.
                                                                                                                                                                                                                                                                                              00 not ICMe from 1hIiI.. 11M cImenIIorq WMfe~.

                                                                                                                                                                                                                                                                                             Cc:oP~ If’lSITE EM LA pty Ud 200 No repnxlucIIon. altefIlIon or oo01
                                                                                                                                                                                                                                                                                                                                    .




                                                                                                                                                                                                                                                                                              tht.cIoc:umenlot~lhereofllpemlittecl\lltltlOUllhe.....tenpennla.slonaf
                                                                                                                                                                                                                                                                                              INSITEfNl.APtylllr:l.

Used in these records

About this file

File size
76.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13_0463.pdf · 76.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.