Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463

of 92

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (76.1 MB): may take a few minutes to open.

Log in to see the plans as drawn
         PROJECT NOTES
         GENERAL                                                                                                      EROSION & SEDIMENT CONTROL                                                                           GROUNDWORKS                                                                                                 TESTING AND INSPECTIONS
         1.    ALL WORKS AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT LOCAL AUTHORITY POLICIES                   1.    FOR STANDARD SEDIMENT CONTROL DEVICE DETAILS REFER TO THE INTERNATIONAL EROSION                1.        THE GEOTECHNICAL REPORT FOR THE PROJECT REFERRED TO IN THE NOTES IS THE GEOTECHNICAL              1.        TESTING SHALL BE COMPLETED IN ACCORDANCE WITH AUSTRALIAN STANDARDS,AND TO THE
               ,SPECIFICATIONS AND STANDARD DRAWINGS, OR IF THESE DO NOT APPLY THEN THE INSTITUTE OF                        CONTROL ASSOCIATION’S(IECA) STANDARD DRAWINGS                                                            INVESTIGATION REPORT BY SOIL SURVEYS ENGINEERING PTY LTO DATED SEPTEMBER, 2012.                             SATISFACTION OF THE SUPERINTENDENT.
               MUNICIPAL ENGINEERS OF QUEENSLAND STANDARD DRAWINGS AND AUSTRALIAN STANDARDS;                          2.    REFER TO THE EROSION CONTROL PLAN AND IMPLEMENT EROSION CONTROL MEASURES PRIOR TO                        PROJECT NO. 112-14245, NOOSA FLEXIBLE LEARNING CENTRE                                             2.        ROADWORKS TESTING SHALL BE UNDERTAKEN AS SPECIFIED AND AT LEAST AS FOLLOWS:
         2.    THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT NEARBY PROPERTY                                  COMMENCING WORKS ON SITE. MAINTAIN EROSION CONTROL MECHANISMS IN WORKING ORDER;                2.        ALL EARTHWORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH AS3798 AND SUPERVISION TO                        2.1. EARTHWORKS INCLUDING TRENCH WORKS SHALL BE TESTED IN ACCORDANCE WITH AS3798
               OWNERS FROM DUST POLLUTION DURING ALL PHASES OF WORKS CONSTRUCTION. FINISHED AREAS                     3.    SEDIMENT LOSS FROM THE WORK SITE SHALL BE MANAGED IN ACCORDANCE WITH CURRENT                             LEVEL 1 SHALL BE SUPPLIED BY THE CONTRACTOR. THE CONTRACTOR SHALL EMPLOY A QUALIFIED                    2,2. SUBGRADE TO ROADWORKS AND BUILDING PLATFORMS REQUIRE 1 DENSITY TEST (BY SAND
               OF EARTHWORKS SHALL BE KEPT WATERED WHERE NECESSARY UNTIL A SATISFACTORY VEGETATION                          RELEVANT ENVIRONMENTAL GUIDELINES AND LEGISLATION. THIS WILL NECESSITATE THE USE OF                      GEOTECHNICAL ENGINEER WHO IS A REGISTERED PROFESSIONAL ENGINEER OF QUEENSLAND WITH                             CONE)AND PLASTICITY TEST PER 500SCM.
               COVER IS ACHIEVED.                                                                                           APPROPRIATE EROSION AND SEDIMENT CONTROLS. THESE SHALL BE IMPLEMENTED AT THE SITE                        A MINIMUM $5 MILLION PROFESSIONAL INDEMNITY INSURANCE,TO UNDERTAKE LEVEL 1 SUPERVISION                  2.3. PAVEMENT MATERIALS REQUIRE 1 DENSITY TEST (BY SAND CONE)PER 1000SQM,AND SUBMISSION
         3.    ALL CONSTRUCTION WORKS ARE TO BE JOINED NEAllY TO EXISTING WORKS.                                            ESTABLISHMENT PHASE AND MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.                                   OF EARTHWORKS AND WHOSE CERTIFICATION IN WRITING SHALL INCLUDE THE FOLLOWING:                                  TO THE ENGINEER OF THE PAVEMENT MATERIAL SUPPLIERS SAMPLE TESTING RESULTS FOR
         4.    PUBLIC UTILITIES   -
                                      NOT WITHSTANDING THAT THE POSITIONS OF PUBLIC UTILITIES, FITIINGS, PIPES,       4.    PRE.DISTURBANCE SOIL PROFILES AND COMPACTION LEVELS SHALL BE REINSTATED;                                 2.1.   ENGINEERING CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS (ie. STRIPPING,                      GRADING, PLASTICITY AND SOAKED CBR. OTHER MATERIAL PROPERTIES MAY BE SPECIFIED FOR
               POLES, MANHOLES ETC MAY BE INDICATED ON THE DRAWINGS, NO RESPONSIBILITY WILL BE                        5.    ALL VEHICLES EXITING FROM THE SITE ARE TO BE WASHED DOWN, CLEANED AND TREATED SO AS TO                          PROOF ROLLING OF SUBGRAOE, SUBGRADE TREATMENT, ETG) HAVE BEEN CARRIED OUT IN                          TESTING BY THE SUPERINTENDENT AT THEIR DISCRETION;
               ACCEPTED BY THE PRINCIPAL FOR THE ACCURACY OF THE REPRESENTATION OR THE OMISSION                             PREVENT MATERIAL BEING TRACKED OR DEPOSITED ON PUBLIC ROADS. INSTALL MEASURES FOR                               ACCORDANCE WITH EARTHWORKS SPECIFICATION.                                                        2.4. PAVEMENT SEALING BY ASPHALT SHALL BE CORE TESTED AND MARSHALL PROPERTIES,GRAOING,
               THEREOF.                                                                                                     CONTROL OF WASH DOWN.                                                                                    2.2.   ENGINEERING CERTIFICATION THAT FILL HAS BEEN PLACED AND COMPACTED TO THE REQUIRED                       STABILITY AND DENSITY TESTED. PAVEMENT SEALING BY SPRAY SEAL REQUIRES SUBMISSION OF
         5.    LOCATION AND LEVEL OF EXISTING SERVICES AND STRUCTURES HAS BEEN PLOTTED FROM                           S.    ALL VEHICLE MOVEMENTS TO BE RESTRICTED TO BUILDING WORKS AREA ONLY, UNLESS APPROVED                             MINIMUM DENSITY IN ACCORDANCE WITH THE EARTHWORKS SPECIFICATION                                         SUPPLIERS SAMPLE TESTING RESULTS INCLUDING SCLUBLE SULPHATE TESTS;
               AVAILABLE RECORDS AND IS INDICATIVE ONLY. THE CONTRACTOR SHALL ACCURATELYLOCATE                              OTHERWISE BY THE SUPERINTENDENT.                                                                         2.3.   ENGINEERING CERTIFICATION THAT ANY AREAS OF CUT HAVE BEEN COMPACTED TO THE                 3.        CONCRETE SHALL BE TESTED IN ACCORDANCE AS3S00,;
               THESE ON SITE PRIOR TO COMMENCING WORKS AND SHALL PROTECT ALL EXISTING SERVICES                        7.    EROSION CONTROL IS THE RESPONSIBILITY OF THE CONTRACTOR WHO SHALL COMPLY WITH                                   REQUIRED MINIMUM DENSITY IN ACCORDANCE WITH THE EARTHWORKS SPECIFICATION.                  4.        SAMPLE TEST RESULTS FROM SUPPLIERS FOR OTHER MATERIALS INCLUDING BEDDING GRAVEL’S,
               DURING CONSTRUCTION. ANY DAMAGE TO EXISTING SERVICES SHALL BE REPAIRED AT THE                                COUNCIL REQUIREMENTS.                                                                                    2.4.   IF REQUIRED, ENGINEERING CERTIFICATION THAT THE CONTROLLED FILL MATERIAL IS SUITABLE                 DRAINAGE GRAVEL’S, GEOFABRICS, CAST IRON WORKS, WATER SUPPLY FITTINGS, PRE CAST
               CONTRACTORS EXPENSE;                                                                                   8.    PROGRESSIVELY CLEAN UP ALL LITTER AND OIL LEAKS, AND PREVENT WASH OFF OF CEMENT SLURRY                          TO SUPPORT A CONVENTIONAL SLAB ON GROUND FLOOR.                                                      CONCRETE AND ALL PIPE SUPPLIES SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL;
         S.    VEGETATION OUTSIDE WORK AREAS SHALL NOT BE DISTURBED UNLESS SPECIFICALLY AUTHORISED                          ONTO SITE SOILS                                                                                          2.5. ENGINEERING CERTIFICATION THAT THE QUALITY OF AN’( IMPORTED FILL COMPLIES WITH THE           5.        ALL TESTING IS TO BE UNDERTAKEN BY A REGISTERED NATA CERTIFIED TESTING LABORATORY AND IS
               BY THE SUPERINTENDENT.                                                                                 9.    ALL DOWN PIPES TO BE INSTALLED IMMEDIATELY FOLLOWING ROOF CONSTRUCTION ENSURE ooWN                              EARTHWORKS SPECIFICATION REQUIREMENTS                                                                TO BE IN ACCORDANCE WITH SAMPLING PROCEDURES AGREED WITH THE SUPERINTENDENT.
         7.    IT IS THE CONTRACTORS RESPONSIBILITY TO COMPLY WITH ALL RELEVANT LEGISLATION;                                PIPES DISCHARGE TO DRAINAGE TRENCHES IN ACCORDANCE WITH STORMWATER DESIGN.                               2.S. ENGINEERING CERTIFICATION THAT THE STABILITY OF CUTIFILL BATTERS AND TRENCHES IS             S.        PRIOR TO WORKS COMMENCING, CONTRACTOR MUST UNDERTAKE INFILTRATION RATE TESTING IN
         8.    IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE STABILITY OF AN’( TEMPORARY                 10.   ALL SEDIMENT AND EROSION CONTROL STRUCTURES SHALL BE FORMED FROM/IN NON.ERODABLE                                ADEQUATE                                                                                             ACCORDANCE WITH AS1547.200, APPENDIX 4.1F. AT 8 LOCATIONS ACROSS THE WORKS SITE, AT
               WORKS ON THE SITE.                                                                                           MATERIALS.                                                                                     3.        UNLESS DIRECTED OTHERWISE IN THE GEOTECHNICAL REPORT FOR THE PROJECT, OR BY THE                             LOCATIONS OUTSIDE THE BUILDING ENVELOPES AND NOT WITHIN THE VEGETATION PROTECTION
         9.    THE CONTRACTOR SHALL CONFIRM THE CURRENCY OF THE SET OUT & LEVELS WITH THE                             11.   THE CONTRACTOR SHALL ADVISE THE SUPERINTENDENT ONCE THE ESC MEASURES HAVE BEEN                           GEOTECHNICAL ENGINEER ON SITE, FILLING SHALL BE COMPACTED IN ACCORDANCE WITH TABLE 5.1                      ZONES, POST.CONSTRUCTION INFILTRATION RATE TESTS ARE TO BE UNDERTAKEN AT THOSE
               SUPERINTENDENT PRIOR TO COMMENCING CONSTRUCTION.                                                             INSTALLED.                                                                                               OF AS3798. ABSOLUTE MINIMUM DENSITY RATIOS FOR BUILDING PAD ONLY ARE THE FOLLOWING:                         LOCATIONS, AND RESULTS ARE TO BE WITHIN 25% OF EXISTING RATES. RESULTS ARE TO BE
         10.   THE SURVEY LEVEL DATUM IS AS PER DETAILED SURVEY BY GOODWIN MIDSCN, DRAWING No. 14210-2.               12.   ALL DISTURBED AREAS SHALL BE LEFT IN A STABLE REVEGETATED CONDITION PRIOR TO THE                         3.1.   RESIDENTIAL LOTFILL. 95% STD;                                                                        SUBMITTED TO THE SUPERINTENDENT.
         11.   THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE RELEVANT LOCAL AUTHORITY                               REMOVAL OF EROSION AND SEDIMENT CONTROL DEVICES. ESC MEASURES SHALL NOT BE REMOVED                       3.2.   COMMERCIAL FILL (FOR MINOR LOADS) 98% STO;
                                                                                                                                                                                                                                                                              .                                                        7.        CBR TESTING FREQUENCY IS AS FOLLOWS;
               SPECIFICATIONS AND THE PROJECT SPECIFICATIONS. IN THE EVENT OF A DISCREPANCY, REFER TO                       UNTIL APPROVED IN WRITING BY SUPERINTENDENT.                                                             3.3.   PAVEMENTS (EXCEEDING 300MM BELOW SUBGRAOE).95% STO;                                              7.1. MINIMUM OF 3No. TESTS WHERE SUBGRAOE IS UNIFORM MATERIAL THROUGHOUT, OR WHERE
               THE SUPERINTENDENT FOR CLARIFICATION.                                                                                                                                                                                 3.4.   PAVEMENTS (WITHIN 300MM OF SUBGRAOE) 98% STD;
                                                                                                                                                                                                                                                                                  .                                                                 LESS THAN 3 DIFFERENT TYPES OF SOIL HORISON ARE OBSERVED (SEE NOTE 7.2 BELOW)
         12.   THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH DRAWINGS PREPARED BY OTHER RELATED                                                                                                                         4.        AREAS OF CUT OF BE ALSO SUBJECT TO BE PROOF ROLLED AND COMPACTED TO THE SAME                            7.2.   CBR TEST TO BE UNDERTAKEN ON EACH DIFFERENT SOIL HORIZON OBSERVED AT PAVEMENT
               CONSULTANTS, ALL PROJECT SPECIFICATIONS AND WITH SUCH OTHER WRITTEN INSTRUCTIONS AS                                                                                                                                   STANDARDS AS FILL AREAS                                                                                        FORMATION.
               MAY BE ISSUED DURING THE COURSE OF THE WORK. ALL THE DISCREPANCIES SHALL BE REFERRED                                                                                                                        5.        PRIOR TO COMMENCING EARTHWORKS THE CONTRACTOR SHALL SUBMIT A SAMPLE OF PROPOSED                         7.3.   1 No. CBR TEST PER 200m’ OF PAVEMENT AREA SUBJECT TO NOTE 1 ABOVE
               TO THE SUPERINTENDENT FOR DECISION BEFORE PROCEEDING WITH THE WORK.                                                                                                                                                   FILLING MATERIAL (FROM CUTTINGS OR IMPORTED)WITH ALL TEST RESULTS FOR ALL SPECIFIED
                                                                                                                      VEGETATION PROTECTION
        13.    ALL DIMENSIONS RELEVANT TO SETTING OUT AND OFF-SITE WORK SHALL BE AS INDICATED ON BLIGH                                                                                                                               MATERIAL PROPERTIES PER THE SPECIFICATION.
                                                                                                                      1.    ALL WORKS SHALL BE IN ACCORDANCE WITH THE APPROVED VEGETATION MANAGEMENT PLAN,
               TANNER DRAWINGS AND SHALL BE VERIFIED BY THE CONTRACTOR BEFORE CONSTRUCTION AND/OR                                                                                                                          S.        UNLESS DIRECTED OTHERWISE IN THE GEOTECHNICAL REPORT FOR THE PROJECT, OR BY THE
                                                                                                                            WHICH TAKES PRECEDENCE OVER THESE NOTES.
               FABRICATION IS COMMENCED. THE ENGINEERS DRAWINGS SHALL NOT BE SCALED, UNLESS                                                                                                                                          GEOTECHNICAL ENGINEER ON SITE, FILLING AND SUBGRADE ARE SHALL BE COMPACTED IN MAXIMUM             AS CONSTRUCTED INFORMATION
                                                                                                                      2.    WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD GIRDLES SHOULD BE CONSTRUCTED
               SPECIFICALLY NOTED OTHERWISE.                                                                                                                                                                                         LIFTS OF 300MM LOOSE THICKNESS AS FOLLOWS: PAVEMENT AREA MORE THAN 300MM BELOW                    1.    AS CONSTRUCTED INFORMATION IS TO REFLECT THE ACTUAL CONSTRUCTION AND IS TO BE ENDORSED
                                                                                                                            WITH 1.8m BATTENS CLOSELY SPACED AND ARRANGED VERTICALLY FROM GROUND LEVEL GIRDLES
        14.    DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING PROPOSED                                                                                                                                      PAVEMENT SUBGRADE 95% MIN. PAVEMENT AREA LESS THAN THAN 300 MM BELOW PAVEMENT                           BY A LICENSED SURVEYOR;
                                                                                                                            MUST BE STRAPPED TO TREES PRIOR TO CONSTRUCTION AND REMAIN UNTIL COMPLETION.
               AND EXISTING WORKS IN A STABLE CONDITION AND ENSURING NO PART SHALL BE OVER STRESSED                                                                                                                                  SUBGRADE 98% MIN. THE PERCENTAGES ARE MINIMUM DRY DENSITY RATIO IN ACCORDANCE WITH AS             2.    THE CONTRACTOR IS TO SUPPLY ’AS CONSTRUCTED’ INFORMATION IN A FORMATTHAT IS IN
                                                                                                                      3.    WHERE POSSIBLE, TREE ROOTS SHOULD BE TUNNELED UNDER, RATHER THAN SEVERED. IF ROOTS
               UNDER CONSTRUCTION ACTIVITIES.                                                                                                                                                                                        1289 5.1.1 (STANDARD COMPACTION)                                                                        ACCORDANCE WITH COUNCIL REQUIREMENTS;
                                                                                                                            ARE SEVERED THE DAMAGED AREA SHOULD BE TREATED WITH A SUITABLE FUNGICIDE.
        15.    SAFETY REQUIREMENTS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE WORK PLACE,                                                                                                                         7.        REFER TO THE EROSION CONTROL PLAN AND IMPLEMENT EROSION CONTROL MEASURES PRIOR TO
                                                                                                                      4.    ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY A PROFESSIONAL ARBORIST.
               HEALTH AND SAFETY ACT (QLD).                                                                                                                                                                                          COMMENCING WORKS ON SITE. MAINTAIN EROSION CONTROL MECHANISMS IN WORKING ORDER.
                                                                                                                      5.    THE CONTRACTOR IS NOT TO DISTURB OR CUT VEGETATION WITHOUT THE SUPERINTENDENTS
        lS.    THE APPROVAL FOR A SUBSTITUTION SHALL BE SOUGHT FROM THE SUPERINTENDENT BUT IS NOT AN                                                                                                                       8.        AREAS WHERE TOPSOIL AND OTHER ORGANIC MATTER IS TO BE STRIPPED PRIOR TO COMMENCING
               AUTHORISATION FOR A VARIATION. ANY VARIATION MUST BE APPROVED BY THE SUPERINTENDENT
                                                                                                                            APPROVAL.                                                                                                                                                                                                  CONCRETE WORKS
                                                                                                                                                                                                                                     GROUNDWORKS SHALL BE MARKED OUT PRIOR COMMENCING EARTHWORKS. FILL SHALL BE
                                                                                                                      S.    SELECTED TREES AND / OR SHRUBS WHICH ARE TO REMAIN UNDISTURBED SHALL BE MARKED BY THE                                                                                                                      1.    CONCRETE WORK SHALL COMPLY WITH AS3S00;
               BEFORE WORK COMMENCES.                                                                                                                                                                                                STOCKPILED ON SITE. EARTH STOCKPILES SHALL BE SUITABLY PROTECTED FROM EROSION AND
                                                                                                                            SUPERINTENDENT WITH COLOURED TAPE OR SIMILAR MARKS. THE CONTRACTOR SHALL TAKE CARE                                                                                                                         2. CONCRETE FINISHES SHALL BE IN ACCORDANCE WITH ARCHITECTS SPECIFICATION UNLESS NOTED
        17.    THE ACCESS FOR THE WORK SITE SHALL BE AS INDICATED ON THE CONTRACT OR AS APPROVED BY                                                                                                                                  WEED INFESTATION BY COVERING WITH WEED MAT OR OTHER MEANS. RESPREAD TOPSCIL TO
                                                                                                                            NOT TO DAMAGE OR REMOVE ANY OF THESE TREES AND / SHRUBS IN CARRYING OUT THE WORKS OF
               THE SUPERINTENDENT AND THE LOCAL AUTHORITIES. THE CONTRACTOR SHALL OBTAIN ALL                                                                                                                                         FINISHED SURFACE LEVELS AND REVEGETATE TO SPECIFICATION PRIOR TO COMPLETION.                            OTHERWISE;
                                                                                                                            THE CONTRACT.                                                                                                                                                                                              3. ALL CONCRETE KERB SHALL BE GRADE N32;
               NECESSARY AND RELEVANT PERMITS. IT IS THE CONTRACTORS RESPONSIBILITY TO CONSTRUCT AND                                                                                                                       9.        ALL LAYERS OF FILLING AND SUBGRAOE ARE TO BE PROOF ROLLED TO SUPERINTENDENTS
                                                                                                                      7.    VEGETATION OUTSIDE WORK AREAS SHALL NOT BE DISTURBED UNLESS SPECIFICALLY AUTHORISED                                                                                                                        4. ALL CONCRETE PAVEMENTS SHALL BE GRADE N25 UNLESS NOTED OTHERWISE;
               MAINTAIN ACCESS AS THEY REQUIRE TO ALL PARTS OF CONTRACTORS WORK AREA                                                                                                                                                 APPROVAL.
                                                                                                                            BY THE SUPERINTENDENT.                                                                                                                                                                                     5.    THE SUPERINTENDENT SHALL BE NOTIFIED PRIOR TO POURING OF AN’( CONCRETE;
        18.    THE CONTRACTORS COMPOUND SHALL BE LOCATED AS APPROVED BY SUPERINTENDENT.                                                                                                                                    10.       UNLESS DIRECTED OTHERWISE IN THE GEOTECHNICAL REPORT FOR THE PROJECT, OR BY THE
                                                                                                                      8.    ALL VEGETATION WITHIN 4M OF GENERAL MACHINE OPERATION SHALL BE PROTECTED WITH A STAR                                                                                                                       S. CURING OF ALL CONCRETE IS TO BE ACHIEVED BY THE USE OF AN APPROVED CURING COMPOUND.
        19.    ALL WORKS SHALL COMPLY WITH THE WORK PLACE HEALTH AND SAFETY ACT.                                                                                                                                                     GEOTECHNICAL ENGINEER ON SITE, MAXIMUM BATTER SLOPES TO ANY CUTTING OR FILLING TO BE lV
                                                                                                                            PICKET AND ROPE FENCE CONSTRUCTED AT LEAST 1M CLEAR OF THE VEGETATION;                                                                                                                                     7.    BASIC DRYING SHRINKAGE STRAIN MEASURED IN ACCORDANCE WITH AS 1012 PT.13 SHALL NOT
        20.    ALL WORKS SHALL BE IN ACCORDANCE WITH THE PROJECT ENVIRONMENTAL MANAGEMENT PLAN.                                                                                                                                      TO 3H FOR LANDSCAPED SLOPES.
                                                                                                                                                                                                                                                                                                                                                                                                                    -




                                                                                                                                                                                                                           11.       CONTRACTOR SHALL MAKE DUE ALLOWANCE FOR ADDRESSING SITE TRAFFICABILlTY IN ACCORDANCE                    EXCEED SOD MICROSTRAIN AT 8 WEEKS.

                                                                                                                                                                                                                                     WITH THE GEOTECHNICAL REPORT FOR THE SITE, CONSIDERING WEATHER CONDITIONS LIKELY TO
        MAINTAINING PERMEABILITY OF SITE SOILS                                                                                                                                                                                       PREVAIL DURING THE EARTHWORKS PERIOD.
        1.     THE CONTRACTOR MUST READ AND BE FAMILIAR WITH THE STORMWATER MANAGEMENT PLAN (BLIGH                                                                                                                         12.       INSITU SAND SOILS, WHERE FREE OF ORGANIC AND DELETERIOUS MATERIAL, MAY BE USED FOR                     IMPORTANT
               TANNER PTY LTO, SITE BASED STORMWATER MANAGEMENT PLAN, JOB NO. 2012.1S7.600, 8 AUGUST                                                                                                                                 STRUCTURAL FILL PROVIDED THE MOISTURE CONTENT OF THE SCILS ON PLACEMENT APPROXIMATES                   1.      THIS SITE MAY CONTAIN UNEXPLODED ORDNANCE. REFER
               2012), WHICH CONTAINS IMPORTANT INFORMATION ON THE PURPOSE AND INTENT OF THE                                                                                                                                          THE OPTIMUM MOISTURE CONTENT REQUIRED FOR COMPACTION.                                                          TO SITE CONTAMINATION REPORT 092.003918
               STORMWATER MANAGEMENT STRATEGY FOR THE SITE.                                                                                                                                                                13.       IMPORTED GENERAL FILL MATERIAL (IF REQUIRED) SHOULD ONLY BE USED IN AREAS UNDER                        2.      NO EARTHWORKS OR EXCAVATIONS TO BE CARRIED OUT
        2.     PRIOR TO WORKS COMMENCING, CONTRACTOR MUST UNDERTAKE INFILTRATION RATE TESTING IN                                                                                                                                     CONCRETE SLAB ON GROUND AREAS. INSITU SAND SOILS TO BE USED OUTSIDE PERIMETER OF SLAB                          UNTIL CONFIRMATION RECEIVED FROM SUPERINTENDENT
               ACCORDANCE WITH AS1547-200, APPENDIX 4.1F. AT 8 LOCATIONS ACROSS THE WORKS SITE, AT                                                                                                                                   TO ASSIST WITH INFILTRATION AS PER ’MAINTAINING PERMEABILITY OF SITE SOILS’ NOTES.                             THAT ALL NECESSARY INVESTIGATIONS AND REPORTING
               LOCATIONS OUTSIDE THE BUILDING ENVELOPES AND NOT WITHIN THE VEGETATION PROTECTION                                                                                                                           14.       REFER TO STRUCTURAL DRAWINGS FOR SPECIFCATION FOR STRUCTURAL FILL,                                             HAVE BEEN COMPLETED
               ZONES. POST.CONSTRUCTlON INFILTRATION RATE TESTS ARE TO BE UNDERTAKEN AT THOSE
               LOCATIONS, AND RESULTS ARE TO BE WITHIN 25% OF EXISTING RATES. RESULTS ARE TO BE
               SUBMITIED TO THE SUPERINTENDENT.
        3.     THE NATURAL INFILTRATION RATE OF THE SITE IS TO BE MAINTAINED IN ALL LOCATIONS. THIS IS
               IMPORTANT TO SUPPORT THE STORMWATER MANAGEMENT STRATEGY FOR THE SITE. THE ONLY

l              EXCEPTIONS TO THIS ARE:
                 a. BUILDING FOOTINGS
~
                 b. BUILDINGS WHICH ARE SLAB-ON GROUND CONSTRUCTION.                                                                                                                                                            7. SUB-BASE PROOF ROLL.
’"
                      THE CONCRETE CROSSOVER AND THE DISABLED CAPRPARKING BAY AND ITS CONCRETE
                                                                                                                              HOLD POINTS
                 c.
                                                                                                                                                                                                                                8. BASE COMPACTION AND MATERIAL QUALITY TESTS TO BE SENT TO AND APPROVED BY ENGINNER.
~                     SURROUND WHICH WILL HAVE IMPERMEABLE SURFACES.                                                                                                                                                            9. BASE PROOF ROLL.
i.      4.     THE CONTRACTOR IS TO SUBMIT DETAILED WORK METHOD STATEMENTS TO THE SUPERINTENDENT                              1.   PROVISION OF WORK METHOD STATEMENTS AS PER NOTE 4 OF ’MAINTAINING PERMEABILITY OF
                                                                                                                                                                                                                                10. PRE.SEAL INSPECTION IMMEDIATELY PRIOR TO SEALING,
                                                                                                                                   SITE SCILS’ NOTES
~              FOR APPROVAL THAT CLEARLY DOCUMENT HOW THE INFILTRATION RATE OF SITE SCILS WILL BE                                                                                                                               11. WEARING COURSE MATERIAL QUALITY, COMPACTION AND APPLICATION RATE TEST RESULTS TO
               PRESERVED. THIS WILL INCLUDE DETAILS ABOUT:                                                                    2. PRE.START MEETING WITH CIVIL CONTRACTOR, CIVIL ENGINEER AND COUNCIL PRIOR TO AN’( CIVIL
i                a. HOW THE SITE WILL BE ACCESSED AND HOW POTENTIAL COMPACTION FROM VEHICLE AND
                                                                                                                                   WORKS COMMENCING.
                                                                                                                                                                                                                                     BE SENT TO AND APPROVED BY ENGINEER PRIOR TO PRACTICAL CCMPLETION OR LlNEMARKING.
                                                                                                                                                                                                                                12. WEARING COURSE INSPECTION.
~
z
                      PLANT MOVEMENT WILL BE MANAGED
                 b. HOW THE INFILTRATION SYSTEMS BENEATH BUILDINGS WILL BE CONSTRUCTED,AND
                                                                                                                              3, BULK EARTHWORKS LEVEL 1 CERTIFICATION TO BE SENT TO AND APPROVED BY ENGINEER PRIOR
                                                                                                                                   TO BUILDING STRUCTURES OR PAVEMENT CONSTRUCTION.
                                                                                                                                                                                                                                13, LlNEMARKING AND SIGNAGE INSPECTION,
                                                                                                                                                                                                                                14. FINAL INSPECTION PRIOR TO PRACTICAL COMPlETION,
                      PROTECTED FROM CONSTRUCTION DEBRIS                                                                      4. EROSION AND SEDIMENT CONTROL PRIOR TO CLEARING AND/OR EARTHWORKS COMMENCING.AT

~                c.   HOW LIQUID, SLURRY AND FINE PARTICULAR MATERIALS WILL BE HANDLED                                             LEAST MONTHLY AND AFTER HEAVY RAIN EVENTS.
                                                                                                                                                                                                                                ON MAINTENANCE/PRACTICAL COMPLETION INSPECTIONS
                 d. RECTIFICATION MEASURES TO RESTORE PRE.DEVELOPMENT INFILTRATION RATES WHERE                                                                                                                                       PROVISION OF ALL REQUIRED TEST RESULTS AND COMPLETION OF PRIOR INSPECTIONS.
~                     NECESSARY.                                                                                              ROADS/FOOTPATHS
                                                                                                                              1.   SUBGRADE CBR TEST RESULTS TO BE SENT TO ENGINEER FOR CONFIRMATION OF PAVEMENT
                                                                                                                                                                                                                                1.
                                                                                                                                                                                                                                2. PROVISION OF CERTIFIED ’AS BUlLr DRAWINGS AND DATA BY A LICENSED SURVEYOR.
                                                                                                                                                                                                                                3. INSPECTION AND APPROVAL BY ENGINEER INCLUDING LOCAL AUTHORITY IF APPLICABLE.



i
                                                                                                                                   DEPTH PRIOR TO FINALlSING SUBGRAOE AND BOX LEVEL.
                                                                                                                              2. SUBGRADE COMPACTION TESTS TO BE SENT TO AND APPROVED BY ENGINEER PRIOR TO
                                                                                                                                                                                                                                OFF MAINTENANCE/END OF DEFECT PERIOD INSPECTIONS
                                                                                                                                   SUBGRADE INSPECTION.
                                                                                                                                                                                                                                1.   INSPECTION AND APPROVAL BY ENGINEER OF ALL RECTIFICATIONS IDENTIFIED AT ON
                                                                                                                              3. PAVEMENT GRAVEL GRADING, CBR AND MATERIAL PROPERTIES TEST CERTIFICATES TO BE SENT
s                                                                                                                                                                                                                                    MAINTENANCE/PRACTICAL COMPLETION.
                                                                                                                                   TO ENGINEER FOR APPROVAL



i                                                                                                                             4. SUBGRADE INSPECTION AND PROOF ROLL.
                                                                                                                              5. SIDE DRAIN INSPECTION PRIOR TO KERB AND CHANNEL GRAVEL BASE BEING PLACED,
                                                                                                                              S. SUB.BASE COMPACTION AND MATERIAL QUALITY TESTS TO BE SENT TO AND APPROVED BY
                                                                                                                                   ENGINEER.
                                                                                                                                                                                                                                                                      IMPORTANT
                                                                                                                                                                                                                                               BLIGH TANNER CONSULTING ENGINEERS MUST BE INFORMED AT EACH OF
                                                                                                                                                                                                                                              THESE HOLD POINTS AND GIVE PERMISSION TO PROCEED. FAILURE TO DO
                                                                                                                                                                                                                                                                                                                                                                                                 NOTE
                                                                                                                                                                                                                                                                                                                                                                                                ~sDRAWING TO BE READ IN CONJUNCTION
                                                                                                                                                                                                                                                                                                                                                                                                       WITH STANDARD NOTES ON COOl
~                                                                                                                                                                                                                                               THIS MAY RESULT IN BLIGH TANNER BEING UNABLE TO CERTIFY WORKS                                                                                    2.    THIS DRAWING TO BE READ IN CONJUNCTION
                                                                                                                                                                                                                                                                                                                                                                                                       WITH ALL OTHER CONSULTANTS DRAWINGS

!NOT FOR CONSTRUCTION
I Vl                    BLIGH TANNER
                                                             REV

                                                             A
                                                              B
                                                                     DATE
                                                                      18.12-2012
                                                                      25.03-2013
                                                                                        DESCRIPnON

                                                                                        PREUMINARY ISSUE
                                                                                        FOR INFORMATION
                                                                                                                                            DESIGN

                                                                                                                                            PS
                                                                                                                                            PS
                                                                                                                                                       ORA"""

                                                                                                                                                       PS
                                                                                                                                                       PS
                                                                                                                                                                CHECKED



                                                                                                                                                                AH
                                                                                                                                                                          APPROVED                   RPEQ      PROJECT
                                                                                                                                                                                                                                                                                           NOOSA FLC            DRAVY1NGnTLE
                                                                                                                                                                                                                                                                                                                                                                          STANDARD NOTES                 SCALES




~                                                             C       17-05.2013        FOR REVIEW                                          PS         PS       CR        CR
N
       ...              CONSULTING ENGINEERS
                                                              D       13-06.2013        OPERATIONAL WORKS                                   PS         PS       CR        CR                                   LOCATION
                                                                                                                                                                                                                                        2 GIRRAWEEN COURT, SUNSHINE BEACH, QLD
                                                                                                                                                                                                                                                                                                                ARCHITECT                                                                                JOB NO


~                                                                                                                                                                                                                                                                                                                                                                          FULTON TROTTER                               2012,164.200
       LEVEL 9,269 WICKHAM STREET, PO BOX 612



i
x
       FORTITUDE VALLEY OLD 4006 AUSTRALIA

       T 07 3251 8555      F 07 3251 8599
                                                                                                                                                                                                               CLIENT

                                                                                                                                                                                                                                                                                  FULTON TROTTER
                                                                                                                                                                                                                                                                                                                ASSOCIATE CONSULTANT                                                                     DRAWNGNO


                                                                                                                                                                                                                                                                                                                                                                                                         COO1
                                                                                                                                                                                                                                                                                                                                                                                                                                       REVISION


                                                                                                                                                                                                                                                                                                                                                                                                                                       0
    ALL RIGHTS RESERVED. THIS WORK IS COPYRIGHT AND CANNOT BE REPRODUCED IN ANY FORM OR BY ANY MEANS              (GRAPHIC,ELECTRICAL OR MECHANICAL, INCLUDING PHOTOCOPYING)WITHOUT THE WRITTEN PERMISSION OF BLIGH TANNER. ANY LICENCE, EXPRESS OR IMPLIED,TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE TERMS OF AGREEMENT OR IMPLIED AGREEMENT BETWEEN BLIGH TANNER AND THE INSTRUCTING PARTY

Used in these records

About this file

File size
76.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13_0463.pdf · 76.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.