23616 DA - Change a Development Approval [As Published] · 132003.221132.4
sunshine Coast Checklist - Applications Involving Land
Regional Council
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1.
APPLICATION FORMS
1.14. Form PartA
14.1.1. Ensure that the form is fully completed and is a current version.
1.1.2. Inthe case of an MCU or Op Works below the high-water mark, owner's consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by
signatory) or Company Seal required.
1.2. Form Part B-R Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached.
1.1.2.4 Ensure that each of Forms B-R which are attached are fully completed.
IDAS ASSESSMENT CHECKLIST , Ole .
2.1 Ensure that relevant sections have been checked and/or completed with regard to referrals
2.2. Ensure correct parts of Form 1 are provided where required (ie most common are Part J for
Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works)
‘ENVIRONMENTALLY RELEVANT ACTIVITIES
3.1. Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Environmental Health for fees),
FORM 2 - REQUEST TO CHANGE APPROVAL
4.1 Ensure that relevant items have been checked and/or completed including information regarding 2
applicant details along with owners consent if not current owner of land as shown on Council records
°
{f over multiple properties on one or more sites, consent of Body Corporate is required. ”) hw
PLANS .
5.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompany the application. In addition ensure that each set is complete.
6.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
SUPPORTING INFORMATION
6.1 Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping
FEE
7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
LH
LH
Ch
Ly
4
Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational
Work if Jetty or if including Landscaping.
Land Development Lot Reconfiguration applications and Operational Work not including Landscaping
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
NSC g:Manduse\administrative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 93 pages
Page 2
INTEGRATED PLANNING ACT 1997
Form 2, Version 4.1, 3 March 2008
Request to chan
an existing appr
[Details of person making the request
Front a
cand oO
1. Who is making the request? "5 re
Company/organisation name
(If applicable)
Stockland Lake Doonella Pty Ltd
individual applicant/Contact person (if there is more than one applicant, provide details undar Add another appfcan)) ol
Postal address Po Box 20, Wurtulla, QLD, 4575
Contact telephone number (07) 54910 157 Mobile phone number 0434 183 684
Facsimile number (07) 54910 143 e-mail address [email protected]
Details of the existing approva! j
2. What are the details of the approval sought to be changed
av . Assessment manager
Type of approval Identification number Date issued (if request nat made to the assessment menagen
[X] Development Permit
23616 DA 7 May 2008 (amended
C1 Preliminary Approval Y ¢ )
identification of the premises J
3. Can any part of the premises be identified by a street address or lot on plan description?
CJ No - Answer 03(a)
DX] Yes - Complete Table B and Q3(b)
Table 8
Street Address Lat on plan description
- Local govemment area |
Nocer (Sree Street Name and offidal suburbfocalily name Post i Plan type and number |
1 Beckmans Road, Noosaville 465 | 800 spisgass “Shr E Sishing Coast
3(b). Can the address be further described by shop/tenancy number or storey/level? Sos e 19238 !
BX No Vee SP ‘Fo 38]
[1] Yes - Complete Table C Gee $P 1FEK<26
Page 3
INTEGRATED PLANNING ACT 1997 Form 2, Version 4.1, 3 March 2008
4. Can the premises best be identified by coordinates (e.g. for development proposed in waters, of on a site within a farge rural tol)?
(X] No
CI Yes - Complete Table 0
5. Whatis the total area that makes up the premises (ie. the area covered by the application)?
; Area of land above high water mark/outside watercourse Area in a water body or watercourse
7203 om {J hectares om OC hectares
° {Tick applicable unit) (Tick applicable unit)
{Owner's consent and resource owner's agreement |
6. _ Is the person making the request the owner of the land to which the approval attaches?
& Yes oO No - Complete Table E - provide details for each owner on a separate row, of on an attachment to this forn if applicable. Note: Advice
provided at the end of this form details when owner's consent is not required.
7. _ fan application for the existing approval were being made now (i.e. af the time of making this request), would evidence be required to
support the application because it involved taking or interfering with a State-owned resource prescribed by schedule 10 of the integrated
Planning Regulation 1998 (IP Reg) or any other regulation
EX No =] Yes - Complete Table F and submit, with the application, written agreement to the request.
[Nature of the request |
8. What is the nature of the request for change? (Tick the applicable box/es)
(7 An extension of the period before an approval lapses (under IPA, section 3.5.22)
] To change the development approval other than a change of condition (under IPA, section 3.5.24)
[XJ To change or cancel a condition of approval (under IPA, section 3.5.33)- Go to Q11
oO To change conditions of a rezoning approval given under the Local Government (Planning and Environment) Act 1990 (under IPA,
section 6.1.35A) - Go to Q12
9. Were one or more concurrence agencies involved in the approval?
& No Oo Yes - Complete Table G. Submit, with the application, a copy of the notice required to be sent to each agency under IPA sections
3.5.22(t)(a) and 3.5.24(1)(b).
10. Does the request for change relate to an aspect of the approval that involved a building referral agency?
K No oO Yes - Complete Table H. Submit, with the application, a copy of the notice required to be sent to each agency under IPA section
3.5.24(1)(b).
‘Details and reasons or justification for the request |
11. What are the details of the requested change and the reasons or justification for the change? Use a different row for each change if more
than one.
Details of requested change (including extension of the period if relevard) Reasons or justification for the requested change |
1 | Refer to attached letter Refer to attached letter
\Mandatory attachments and information |
12. What are the mandatory attachments and supporting information accompanying this application?
Description of attachment or information
(e.g. notice to concurrence /building referral agencies,
owner's consent, resource owner's agreement, drawings, reports)
Title and date (if appiicatie) Method of delivery to
(e.g. James StreetTraffic Report) assessment manager
Cover Letter (w/details of proposed Changes)
2 | Owners Consent
3 | Track Changes of Conditions
4 | Proposed Track Changes of Judgement
Page 4
INTEGRATED PLANNING ACT 1997 Form 2, Version 4.1, 3 March 2008
5 | Proposed Track Changes of Design Guidelines
6 | Amended Design Guidelines
OFFICE USE ONLY
Date Received Reference Numbers VBterE Cosi Code (appticatie fo EPA only) eRe)
Advice for completing Form 2
General advice
« Form 2 may be used for any one of the four types of request for changing an existing approval -
* — anextension of the period before an approval lapses (under IPA, section 3.5.22)
* — to. change or cancel a condition of approval (under IPA, section 3.5.33)
* to change the development approval other than a change of condition (under IPA, section 3.5.24)
* — to.change conditions of a rezoning approval given under the Local Government (Planning and Environment) Act 1990 (P&E Act) (under IPA,
section 6.1,35A)
« Form 2s not an approved form under the IPA. The assessment manager, concurrence agency or court may have their own form for the purpose of
making a request to change an approval. In the case of a request to change conditions of a rezoning approval, the P&E Act establishes the process to
be followed and provides for the local government to determine the required form.
«The entity that should receive the request is:
* for an extension of the period before an approval lapses - the assessment manager (even #f the approval was granted by the court (IPA, section
3,5,.22(9))
« — to.change or cancel a condition of approval - the entity that decided or tequired the condition (i.e. the assessment manager, a concurrency
agency or the court)
* — ta.change the development approval - the assessment manager
* — tochange conditions of a rezoning approvat - the local government
+ When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) for requests relating to environmentally relevant activities
(ERAs) or coastal development, use the process {rom the information sheet Electronically paying fees fo the Environmental Protection Agency (EPA)
and attach the form Electronic Funds Transfer (EFT) payment notification to the request.
Qt Any person may make a request to change an approval. However, in the case of a development approval for building work or operational work
for the supply of community infrastructure on land designated for the community infrastructure, only the person supplying the infrastructure may
make a request (IPA, section 3,5.33(3A)).
Q2 Ifthe request is made to a concurrence agency or the court, notice of any subsequent change or cancellation of a condition must be given to the
assessment manager (IPA, section 3.5.33(9}).
Q6 . If the person making the request is not the owner of the land to which the approval attaches, the request must be accompanied by the
owner's consent. (IPA, sections 3.5.22(3), 3.5.24(3), 3.5.33(3)).
. However, owner's consent is not required if the approval is for:
* — amobile and temporary ERA; or
. building work or operational work for the supply of community infrastructure on land designated for community infrastructure
(IPA, section 3.5.33(3A)).
Q7 The request must also be accompanied by the written agreement of the chief executive fram whom evidence of resource allocation or
entitlement would be required if an application for approval were being made. (IPA, sections 3.5.22(5), 3,5.24(5), 3.5.33(3C)})
Q9 For a request to extend the period before an approval lapses, or to change a development approval, each concurrence agency for the approval
must be given written notice of the request (IPA, sections 3.5.22(1), 3.5.24(1)).
Q10 For a request to change a development approval, if the subject of the request involved a building referral agency, that agency also needs to be
given notice of the request (IPA, section 3.5.24(1)). For a request to change conditions the opinion of a relevant building referral agency must be
given regard to by the entity deciding the request (IPA, section 3.5.33(9)).
Page 5
Planning & Design 6) Level 1, 8 Innovation Parkway T 07 84910 157 Stockland Birtinya 4575 F 07 54910 143 www.stockland.com.au PO Box 20 Wurtulla 4575 22 September 2008 Chief Executive Officer Sunshine Coast Regional Council (Northern District) PO Box 141 TEWANTIN QLD 4565 Attn: Assessment Manager — Kerri Coyle Dear Kerri RE: $3.5.24 REQUEST TO CHANGE DEVELOPMENT APPROVAL (OTHER THAN A CHANGE OF A CONDITION) AND S3.5.33 REQUEST TO CHANGE CONDITION OF DEVELOPMENT APPROVAL DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF Use (181 DWELLING HOUSES, GROUP HOUSING DEVELOPMENT OF 43 DWELLING UNITS AND ESTATE SALES OFFICE) AND RECONFIGURATION OF A LOT (185 RESIDENTIAL LOTS & 43 GROUP TITLE LOTS) BECKMANS ROAD, NOOSAVILLE LOT 800 ON SP153455 COUNCIL REFERENCE: 23616 DA We Stockland Doonella Pty Ltd, owners of land described as: BECKMANS ROAD, NOOSAVILLE AND DESCRIBED AS LOT 800 ON SP 153455 hereby consent to the request to the Sunshine Coast Regional Council to Change a Development Approval and Change to Conditions of a Development Approval (23616 DA) over the abovementioned land holding. Yours sincerely, AQ — Mare Wilkinson Project Director - Caloundra Downs Stockland Lake Doonella Pty Ltd ACN 009 966 358 by its Attomey Mare Maynard Wilkinson under Power of Attorney No. 711408266 Stockland Development Pty Ltd ABN 71 000 064 835.
Page 6
Planning & Design Level 1, 8 Innovation Parkway T 07 54910 157 Birtinya 4575 F 07 54910 143 www.stockland.com.au PO Box 20 Wurtulla 4575 3 October 2008 Attn: Assessment Manager — Kerri Coyle Chief Executive Officer Sunshine Coast Regional Council (Northern District) Locked Bag 72 SUNSHINE COAST MAIL CENTRE QLD 4560 Dear Kerri RE: REQUEST FOR MODIFICATION TO DEVELOPMENT APPROVAL 23616 DA FOR A MATERIAL CHANGE OF USE (181 DWELLING HOUSES, GROUP HOUSING DEVELOMENT OF 43 DWELLING UNITS AND ESTATE SALES OFFICE) AND LOT RECONFIGURATION (185 RESIDENTIAL LOTS & 43 GROUP TITLE LOTS) AT BECKMANS ROAD, NOOSAVILLE DESCRIBED AS LOT 800 SP 153455 Reference is made to the development application lodged with the Sunshine Coast Regional Council on 19 November 2003. Approval for this Application was granted on 24 February 2005 for a Development Permit for a Material Change of Use for 181 Dwelling Houses, Group Housing Development of 43 Dwelling Units and Estate Sales Office and Reconfiguration of a Lot for 185 Residential Lots and 43 Group Title Lots. This approval was granted over land located at Beckmans Road, Noosaville more formally described as Lot 800 SP 153455. Subsequent applications to change the development approval were approved on 19 February 2007 and 7 May 2008 respectively. In accordance with sections 3.5.24 and 3.5.33 of the integrated Planning Act 1997, we now seek to modify the Approval and amend Conditions 2, 5, 11, 12, 14, 16, 17, 18, 19, 20, 21, 22, 23, 30, 31, 32, 40, 41, 42, 43, 44, 49, 50, 60, 65 and 80. In summary, it is proposed to amend the development approval by way of:- * removing the group housing / community title component from the Conservation Residential; + removing the private open space from the Conservation Residential allotments and converting to public open space; * amending assessment table and key requirements on plan of development to reflect proposed changes to Conservation Residential allotments; and » changing or deleting those conditions that are redundant, irrelevant, superseded by other legislative requirements, represent a “doubling up” of compliance or that are ordinarily required to reflect consistency throughout the approval. Stockland Development Pty Ltd ABN 71 000 064 835. © Stockland
Page 7
The changes sought are intended to streamline processes and requirements applicable to subsequent and consequential development. They are in no way intended to undermine the environmental values that underpin the project. The changes outlined below are generally in accordance, but advance upon, those amendments outlined in our letter (c/- Conics (Sunshine Coast) Pty Ltd) of May 2008. In correspondence dated 27 May 2008 (refer attached), Council indicated a generally acceptance of the proposed amendments. Please see below for a summary of the requested changes. A track changes document has been prepared highlighting proposed conditional amendments for your perusal and ease of reference. A copy of this document is attached. Condition 2 2. An amended Plan of Development shall be provided to Council within one month of Council's approval revising: 21 the ‘Key Development Requirements’ consistent with the approved Plan of Development issued with the Development Approval 22402 DA and conditions of same: 2.2 the ‘Key Development Requirements’ to incorporate the specific acoustic measures for allotments 159-171, 174 — 181 as required by condition 4. An amended plan of development has previously been provided to Council reflecting the changes outlined above. As part of the current request to change the development approval and conditions additional amendments will be required to accommodate the proposed amendments to the Conservation Residential allotments. It is requested that this condition be amended accordingly. Condition 5 5. All Dwelling houses and Dwelling units shall be designed and constructed to accord with the Residential Design Guidelines prepared by PMM Group and stamped approved, Amended Residential Design Guidelines shall be provided to Council prior to approval of Operational Works and include the following amendments:- 5.7 No dwelling house (including garage/carport) shall be located within 6 metres of the front boundary, unless approval is given otherwise by Council. 5.2 All. buildings (which does not include swimming pools or other structures that do not present a fire hazard) located on allotments adjoining either private open space or public open space shall be located in accordance with the setback requirements contained in the Fire Management Plan. 5.3 The Energy Efficiency criteria shall include the requirement for all dwelling houses to have a solar hot water system. 5.4 A provision shall be included requiring all pools constructed to be fitted with a rope to allow for a Koala to exit the pool. 5.5 Rainwater harvesting provisions shail be included for Forest Cluster Precinct, including a rainwater tank of 15kL. Page 2 of 10
Page 8
5.6 Water saving devices shall be included for all dwelling houses with a maximum 9L per minute restrictor on ail showers. Please find attached updated Residential Design Guidelines (nb. A track changes version is also attached). The Design Guidelines have been updated to reflect current legislative requirements and it is requested that they be stamped approved as part of this request for a change to development approval and conditions. In respect of the individual items detailed by points 5.1 — 5.6 (inclusive) above, the following comments are provided:- 5.1 The guidelines have been amended to reference Queensland Development Code requirements for setbacks to provide for flexibility for building setbacks, particularly for corner allotments; 5.2 Refer to comments on condition 21 below. The FMP will need to be updated to reflect precinct amendments proposed to accommodate proposed changes to the Conservation Residential allotments; 5.3 Energy Efficient criteria are an obligation of the Building Code of Australia for all new dwellings (in Queensland). The reference in the Design Guidelines is therefore not required; 5.4 This matter is covered by the Natural Conservation (Koala) Conservation Plan 2006 and Management Program 2006-2016 (the Koala Plan) and is reflected in Division 17 — Landscaping Code of the Noosa Plan which all dwellings within the Noosa region of the Sunshine Coast Regional Council are required to accord with. The reference in the Design Guidelines is therefore not required; 5.5 Noted; 5.6 The Building Code of Australia requires all new dwellings (in Queensland) to be fitted with a 3 star rated shower rose (which will use a maximum of 9 litres of water per minute). The reference in the Design Guidelines is therefore not required. Condition 11 17. Group housing development shail be subject to a Community Management Statement (CMS) which shall include provisions making specific reference to this approval and in particular the measures contained in the approval that ensure the protection of the environmental values of the private and public open space areas including stormwater management, native flora, fauna and fauna habitat, and significant trees to the satisfaction of Council. To this end the CMS will make specific reference to all relevant Management Plans. It is requested that this condition be deleted. To this end, the proposal to change the Conservation Residential allotments to remove the Group Housing / Community Title component and convert the Private Open Space to Public Open Space effectively provides that this condition is obsolete. Management of the Public Open Space as referenced in the Public Open Space Management Plan will provide for adequate protection of the environmental value of the land. Page 3 of 10
Page 9
Condition 12 12. An environmental covenant as defined by Part 6, Division 4A of the Land Title Act 1994, shall be registered, in favour of Council, on the title of any property of a Group Housing development over the private open space precinct area. The environmental covenant shall be for the protection of the site’s environmental values. Environmental values of the site mean the following environmental values: 12.1. the native flora and plant communities on the site and their habitat; 12.2 the corridor habitat connections; and 12.3 water quality. Refer to comments relating to Condition 11 above. It is proposed to remove the Group Housing / Community Title component from the Conservation Residential allotments and convert the Private Open Space to Public Open Space. It is therefore requested that this condition be deleted. Condition 14, Condition 16 and Condition 17 14. The development shall be undertaken in accordance with the Public Open Space Management Plan prepared by Rob Friend & Associates Pty Ltd and dated December 2004 and as may be amended by these conditions. An amended Public Open Space Management Plan incorporating the required amendments shall be lodged for approval prior to issue of a Development Permit for Operational Works. 16. A ‘Compliance Checklist’ shall be included in its entirety in the Public Open Space Management Plan, as follows:- 17. The following corrections and amendments shail be incorporated into the Public Open Space Management Plan. An amended Public Open Space Management Plan has previously been provided to Council reflecting the requirements of these conditions. In correspondence dated 29 November 2005, Council endorsed “Public Open Space Management Plan, dated 23 November 2005 prepared by Rob Friend and Associates P/L” subject to some minor amendments. Further amendments will be required to this document by virtue of the proposed changes to the Conservation Residential allotments. In light of the above, it is requested that:- + Condition 14 be amended to reflect the updated management plan and reflect the required additional changes as outlined in amended condition 17 (refer comment below). Given that operational works approval has been issued it is requested that a new ‘trigger’ be included for the submission of an amended management plan. It is further requested that any amendment to the document be able to comprise an annexure to the current endorsed document; and « Condition 16 be deleted for reason that the compliance checklist is included in the endorsed amended plan; and Page 4 of 10
Page 10
+ Condition 17 be amended to both recognise the fulfilment of previously requirements amendments and the further amendments to the management plan necessitated by the proposed changes to the Conservation Residential allotments. Condition 18 18. Prior to the dedication of the Public Open Space area to Council, all works in the Public Open Space Precinct shall have been undertaken by the Developer, to Council's satisfaction, apart from the requirements of conditions 15.14 & 15.15 - Neighbourhood Park and condition 15.16 - Swanbourne Way Connection, which shall be completed with Stage B. It is proposed that this condition be amended to address a minor anomaly in condition referencing. Specifically, change the references from conditions 15.14, 15.15 and 15.16 to 16.14, 16.15 and 16.16. Condition 19 and Condition 20 19. The development shall be undertaken in accordance with the Environmental Management Plan Revision B prepared by PMM Group and dated 22 October 2004 and as may be amended by these conditions. An amended Environmental Management Plan incorporating the required amendments shall be lodged for approval prior to issue of a Development Permit for Operational Works 20. The following corrections and amendments shail be incorporated into the Environmental Management Plan:- An amended Environmental Management Plan has previously been provided to Council reflecting the requirements of these conditions. In correspondence dated 29 November 2005, Council endorsed “Environmental Management Plan: Rev D dated September 2005 and prepared by PMM Group”. Further (minor) amendments will be required to this document by virtue of the proposed changes to the Conservation Residential allotments. In light of the above, it is requested that:- « Condition 19 be amended to reflect the updated management plan and the required additional changes as outline in amended Condition 20 (refer comment below). Given that operational works approval has been issued it is requested that a new ‘trigger’ be included for the submission of an amended management plan. It is further requested that any amendment to the document be able to comprise an annexure to the current endorsed document; and + Condition 20 be amended to both: recognise the fulfilment of previously required amendments and the further amendments to the management plan necessitated by the proposed changes to the Conservation Residential allotments. Page 5 of 10
Page 11
Condition 21 and Condition 22 27. The development shall be undertaken in accordance with the Fire Management Plan prepared by Rob Friend & Associates Pty Ltd and dated December 2004 and as may be amended by these conditions. An amended Fire Management Plan incorporating the required amendments shall be lodged for approval prior to issue of a Development Permit for Operational Works 22. The Fire Management Plan shall be amended and corrected to: An amended Fire Management Plan has previously been provided to Council reflecting the requirements of these conditions. In correspondence dated 29 November 2005, Council endorsed “Fire Management Plan, Version 18 dated 28 November 2005 prepared by Rob Friend & Associates P/L’. Further (minor) amendments will be required to this document by virtue of the proposed changes to the Conservation Residential allotments. In light of the above, it is requested that:- + Condition 21 be amended to reflect the updated management plan and the required additional changes as outlined in amended Condition 22 (refer comment below). Given that operational works approval has been issued it is requested that a new ‘trigger’ be included for the submission of an amended management plan. It is further requested that any amendment to the document be able to comprise an annexure to the current endorsed document; + Condition 22 be amended to both: recognise the fulfilment of previously required amendments and the further amendments to the management plan necessitated by the proposed changes to the Conservation Residential allotments. Condition 23 23. The Fire Protection Zones shown in the attached Figure 1 shall be provided and incorporated into the Fire Management Plan and other relevant management plans. The Fire Protection Zones shown in the relevant Figure 1 have been incorporated into the endorsed Fire Management Plan and other relevant management plans as required. It is therefore requested that this condition be deleted. Condition 30 30. After dedication of the Public Open Space to Council, fire fuel loads in each of the four Fire Management Blocks will be assessed annually. In the Fire Management Blocks where fuel loads exceed 10 tonnes/ha in more than 4 assessment plots, fuel reduction will be undertaken manually using hand tools. A prescribed burn within a Fire Management Block will only be undertaken if Council’s Manager — Environmental Services deems it necessary to maintain the ecological values of the vegetation. The applicant will undertake this procedure for a period of three (3) years after the registration of the final stage of the development. Page 6 of 10
Page 12
In addition to the three (3) year trigger, it is requested that an alternate period for undertaking this procedure be incorporated aligning with the schedule for final off maintenance of the estate. Condition 31 and Condition 32 37. The fire fuel loads in the Private Open Space areas of the three Conservation Residential Precincts will be assessed annually. If the fire fuel load in a Private Open Space area exceeds 10 tonnes/ha in more than 3 assessment plots, fuel reduction will be undertaken manually using hand tools. 32. Prescribed burns will not be permitted, unless the Council’s Manager — Environmental Services agrees, in writing, that a prescribed burn is necessary to maintain the ecological values of the vegetation. Written applications requesting permission to undertake a prescribed burn must include an ecological justification supported by ecological data. It is requested that these conditions be deleted. To this end, it is proposed to convert the Conservation Residential Precincts to standard freehold allotments. As part of undertaking same, the Private Open Space will be removed from the allotments and converted to Public Open Space. The Public Open Space Management Plan will provide sufficient guidance for management of fire fuel loads in Public Open Space. Condition 40 40. Access easements through the Conservation Residential Precincts ‘building envelopes’ to the Private Open Space boundaries are not required. It is requested that this condition be deleted. To this end, the Private Open Space is proposed to be incorporated in the Public Open Space system. Access should not be compromised by such a proposal. Condition 41 and Condition 42 41, The development shall be undertaken in accordance with the Flora and Fauna Management Plan prepared by James Warren & Associates Pty Ltd and dated December 2004 and as may be amended by these conditions. An amended flora and Fauna Management Plan incorporating the required amendments Shall be lodged for approval prior to issue of a Development Permit for Operational Works. 42. The following corrections and amendments shall be incorporated into the Flora and Fauna Management Plan: An amended Flora and Fauna Management Plan has previously been provided to Council reflecting the requirements of these conditions. In correspondence dated 29 November 2005, Council endorsed “Flora and Fauna Management Plan, Version 12 dated 12 April 2005 prepared by James Warren & Associates P/L’. Further (minor) amendments will be required to this document by virtue of proposed changes to the Conservation Residential allotments, and current planning requirements pertaining to koala ropes (refer comment to condition 5.4 above). Page 7 of 10
Page 13
In light of the above, it is requested that:- + Condition 41 be amended to reflect the updated management plan and the required additional changes as outlined in amended Condition 42 (refer comment below). Given that operational works approval has been issued it is requested that a new ‘trigger’ be included for the submission of an amended management plan. It is further requested that any amendment to the document be able to comprise an annexure to the current endorsed document + Condition 42 be amended to both: recognise the fulfilment of previously required amendments and the further amendments to the management plan necessitated by the proposed changes to the Conservation Residential allotments and current planning requirements pertaining to koala ropes. Condition 43 and Condition 44 43. The development shall be undertaken in accordance with the Landscape Management Plan prepared by EDAW Gillespies and dated October 2004 and as may be amended by these conditions. An amended Landscape Management Plan incorporating the required amendments shall be lodged for approval prior to issue of a Development Permit for Operational Works. 44, The following corrections and amendments shall be incorporated into the Landscape Management Plan: An amended Landscape Management Plan has previously been provided to Council reflecting the requirements of these conditions. In correspondence dated 29 November 2005, Council endorsed “Landscape Management Plan; Issue H dated August 2005 prepared by Edaw Gillespies’. Further (minor) amendments will be required to this document by virtue of proposed changes to the Conservation Residential allotments. In light of the above, it is requested that:- » Condition 43 be amended to reflect the updated management plan and the required additional changes as outlined in amended Condition 44 (refer comment below). Given that operational works approval has been issued it is requested that a new ‘trigger’ be included for the submission of an amended management plan. It is further requested that any amendment to the document be able to comprise an annexure to the current endorsed document + Condition 44 be amended to both: recognise the fulfilment of previously required amendments and the further amendments to the management plan necessitated by the proposed changes to the Conservation Residential allotments. Condition 49 and Condition 50 49. A Stormwater Management Plan for the site including revegetation and remediation of all water treatment areas including swales and bioretention systems shall be prepared to the reasonable satisfaction of Council. The Stormwater Management Plan shall be generally in accordance with WBM's Report of 30/3/03. Page 8 of 10
Page 14
50. The developer shall comply with the Stormwater Management Plan and the operational stage components of the Stormwater Management Plan shall be referenced in the community management statements for all group housing developments over the site. It is requested that the content of these conditions be consolidated into one condition given the proposal to delete the group housing component from the Conservation Residential allotments. Condition 60 60. Following development of the site, the vegetation in the gullies shall be monitored annually by a suitably qualified person (terrestrial ecologist) for three (3) years so as to detect any adverse effect due to rainwater tanks harvesting water that would normally flow into the gullies and sustain the vegetation. Monitoring of the vegetative conditions of the gullies shall include maintaining summer and winter photographic records at several key locations (at least 3 per gully) in each gully, which will be maintained for the duration of the monitoring period. The sites chosen for monitoring, shall be representative of the major vegetation species present in the gully, and also of those species which may be prone to changes in the hydrological regime of the gully. Details of site inspections, including photographic records shall be included in a half yearly report to be maintained by the site’s Body Corporate. These reports will be forwarded to Council. If adverse effects are evident, the water harvesting rates by the rainwater tanks shall be modified to overcome or other appropriate contingency measures undertaken to rectify the problems. Given the proposed changes to the Conservation Residential precinct allotments, a Body Corporate will no longer be in place for this land, and the referenced land is proposed to comprise Public Open Space. As such, amendments to water harvesting techniques in terms of rainwater tanks will not be feasible and alternative measures will need to be undertaken in instances where adverse effects are evidenced in the monitoring programme. It is requested that this condition be amended to reflect same. It is further requested that an alternate monitoring period be included aligning with the final off maintenance period of the relevant area / stage. This will provide both Council and the applicant with a definitive trigger for final compliance with this condition. Condition 65 65. The Lot Reconfiguration for the residential areas will be in accordance with the following Plans by PMM Group and as may be amended by these conditions: 65.1. Proposed Reconfiguration Lake Doonella Ref: 6812-60B dated 1 March 2004 Sheets 1 to 4; and 65.2 Proposed Reconfiguration Lake Doonella Community Title Lots Ref: 6812-62 dated 2 March 2004. It is requested that this condition be amended to require the submission of amended plans reflecting the proposed changes to the Conservation Residential allotments. Page 9 of 10
Page 15
Condition 80 80. The public open space areas, apart from the area adjacent Beckmans Road and wildlife corridor shall be dedicated to the Crown prior to the sealing of the first completed Stage in the Staging Plan of the development. The public open space area adjacent Beckmans Road and wildlife corridor shall be dedicated to the Crown prior to the sealing of Stage C in the Staging Plan of Development. The public open space will be in the condition required by the Open Space Management Plan. It is requested that this condition be amended to reflect the changes proposed to the Conservation Residential allotments. In accordance with sections 3.5.24 and 3.5.33, we ask that Council consider the above matters and issue an Amended Decision Notice reflecting the above representations. Enclosed are the mandatory IDAS Forms and a cheque $7884.00, being the relevant fee pursuant to Council’s Fees and Charges for a Major Change to Development Approval (other than a Change of Condition) and a Request to Change or Cancel Conditions. In consideration of the above, it is recognised that the proposed changes to the development approval are required to be consistent with the higher order Pretiminary Approval issued by Judgement / Consent for Planning and Environment Appeal No. BD 2220 of 2003. In light of the proposed changes to the subject development approval, a number of amendments are also proposed to be made to the judgement relating to the Preliminary Approval. A track changes document has been prepared highlighting proposed amendments to the judgement for your perusal and ease of reference. A copy of this document is attached. We understand that a separate process must be undertaken for effecting changes to the judgement to that required to amend the subject development approval; although we do recognise that the process for effecting changes to the judgement should be relatively Straightforward providing that both Council and Stockland are in agreement over the proposed changes. It is respectfully requested that Council consider the proposed amendments to both the judgement and the development approval in parailel such that the appropriate processes can be progressed. We trust this information is sufficient for your purposes; however should you require any further details or clarification, please do not hesitate to contact the writer by telephone. Yours faithfully Sian Davis Senior Planning Officer Enc. Page 10 of 10
Page 16
~~
Locked Bag 72 T 07 S475 7272
Su Nn sh | ne Coa st Sunshine Coast Mail Centre F O7 S475 7277
Regional Council Qld 4560 E [email protected]
ABN 37 878 973913 W www.sunshinecoasi.qld.gov.au
Officer: Kerri Coyle
Direct Telephone: 07 5449 §223
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 22402 DA
Your Reference:
27 May 2008
Mr Stephen Vlatko-Rulo RECEIVE 04 JUN 2008
Conics (Sunshine Coast) Pty Ltd
PO Box 149
WURTULLA Q 4575
Dear Sir
Re: Changes to Consent Order — 22402 DA — Lake Doonella Estate
| refer to your letter received 13 May 2008 seeking agreement from Council to advance
discussions on amendments to the Consent Order for the Lake Doonella Estate.
! agree that it is preferable and beneficial to both parties for an agreement to be reached on
the proposed amendments before lodging an application with the Planning & Environment
Court.
To facilitate this process, as suggested in your letter a formal submission on the tational for
the amendments, a draft of amendments to conditions and the Plan of Development, with
amendments highlighted in ‘track changes’ would assist discussions and Council's review.
In terms of the key objectives that you seek to achieve, | confirm that these amendments
are generally acceptable, however, any amendments would need to be decided by the
Council. Concern is also raised with regard to the change in level of assessment for
dwellings, which have fire management requirements inside the lot boundaries. It is further
questioned whether the Residential Design Guidelines needs to be maintained, as items
such as rainwater tanks and fire protection zones may be included on the Plan of
Development. It would be desirable to reduce the number of documents that need to be
referred to in order to ascertain the requirements for dwellings in the estate.
As discussed with the recent application for a minor change to development approval
23616 DA, it is suggested that you seek legal advice on the matter of owners consent, as
this may become an issue in amending the Consent Order.
Should you wish to discuss this matter further, please contact Kerri Coyle on the above
telephone number.
Yours faithfy
ane Adamson
MANAGER - LAND USE
Caloundra Office Maroochydore Office Nambour Office Tewantin Office
1 Omrah Avenue 14-- 13 Ocean Street Cnr Currie and Bury Streets - 9 Pelican Street
Caloundra Old 4651 Maroochydore Qid 4558 Nambour Ole 4560 Tewantlin Qld 4565
T 07 8420 8200 T 07 5475 8801 T 07 5475 8501 T 07 5449 5200
F 07 5420 8900 F 07 5441 8338 F O07 5441 8338 F O? 5447 1062
Page 17
Proposed Amendments to Development Approval 23616DA (as amended issued by Council 27 May 2008 ASSESSMENT MANAGER CONDITIONS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are numbered 6812-58F prepared by PMM Group and dated 22 October 2004 and as may be amended by these conditions. An amended Plan of Development shall be provided to Council within one month of Council's approval revising: 2.1. the ‘Key Development Requirements’ consistent with the approved Plan of Development issued with the Development Approval 22402 DA and conditions of same; 2.2. the ‘Key Development Requirements’ to incorporate the specific acoustic measures for allotments 159-171, 174 — 181 as required by condition 4; 2.3, the arrangement of the Conservation Residential allotments to: re «remove the group housing component; and »__ remove the private open space from the allotments and convert to public open space. 2.4. amend the ‘Key Development Requirements’ (as required by point 2.1 above by amending the last dot point under "Premium Residential and Conservation Residential” to read:- + Areas of private open space (for Premium Residential only) ar managed as discrete hydrological/ecological units to achieve desired environmental outcomes, with no development permitted in the private open space areas: apart from works permitted by an approved EMP. 2.5. amend the Assessment Table and the Legend to remove the reference to Group Housing for Conservation Residential allotments. The Estate Sales Office shall comply with the following: 3.1, Not more than 2 employees are to be engaged in the operation at any one time 3.2. The estate sales office shall not be used between 6:00pm and 8:00am. 3.3. The estate sales office shall cease operations within 2 years of the commencement of its use. 3.4. Any advertising devices shall be erected upon the allotment which the estate sales office is located, shall not exceed a total display area of 3m? and not include the use of bunting. 3.5. The applicant shall submit a layout of the car parking (four spaces) for the real estate office for Operational works approval. The car park design shall ensure the retention of vegetation.
Page 18
Acoustic Measures 4. Dwelling houses on allotments 159-171, 174 - 181 shall be constructed in accordance with Australian Standard AS2107-2000 and AS3671, to a minimum of Category 2, with the formal external open space area of allotments designed and/or located to reduce road traffic noise. This may include the use of barriers outside of the Private Open Space Precinct or by location of recreation areas on the ‘quiet’ side of dwellings (i.e. the fagade that is shielded from road traffic noise from Beckmans Road). A property note shall be included on the titles of lots 159 -171, 174 -181 noting the architectural acoustic requirements are required for these dwelling houses. Residential Design Guidelines 6-All Dwelling houses and Dwelling units shall be designed and constructed to accord with* ~~~ the Residentiat Design Guidelines prepared by PMM-GreupStockland Development Pty Ltd and stamped approved. An-emended Residential Design Guidelines-shaltbe provided-to-Gouncil-prorto-approval-of Operational Works-and include the following amendments §-LNe-dwelling -house-(inciding-garage/carpert} shall be_tecated_within 6 -metres_of the frontboundary, unless-approvalis-given othemvise by GauneiL 5.2. All-buildings-(which does-net-inciude- swimming-pools-or other structures-thatdo Ret present-a a- fire-hazard) located-on-allotments-acjoining-either private open tohave scolar hot water-system. including a rainwater tank of 18k 5:6:4.1, Watersaving—devices shall-be-included—for -alt-dwelling- houses with a maximum Gl-perminuterestrictoror jt i: all SheWwerSs: 6-5. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. #6. Any advertising sign or device is to comply with the provisions of Council's policies on advertising. 8:7. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. 98. This Development Permit for a material change of use of premises lapses if:- 94.8.1. the use or erection of a building or other structure associated with the use, has not been commenced by 26 February 2009, unless application is made and approved by Council for an extension; or 9.2.8.2. the use of any premises pursuant to the Development Permit ceases.
Page 19
49:9. The developer must obtain all of the required Development Permits for each Stage
teferred to in the Decision Notice, prior to obtaining a Development Permit for building
works.
Community-Management Statement
environmental -values.-of the—private and public open space—areas including
to-the _ satisfaction ef Gouncil_To-this-end-the-GMS-will make specific reference-to-all
relevant Management Plans- "
Environmental Covenant
covenant-shall-be-for the-pretection-of-the-site's-environmental-values—-Environmental
24 eth “a . . itat:
Fees Payable
43.10. The developer shall pay Council all reasonable costs for the assessment of the
Management plans and also the costs associated with ensuring the development
complies with the requirements of this approval. These costs shall be limited to a
maximum of $25,000 including the cost of external consultants should they be
required.
The further approvals required to allow development to occur shall be subject to the
fees contained in Council's Fees and Charges Schedule.
Public Open Space Management Plan
994.7 ~~
aerr
44.11. The development shall be undertaken in accordance with the Public Open Spaces - - -
Management Plan prepared by Rob Friend & Associates Pty Ltd and dated
December 200423 November 2005 and as may be amended by these conditions. An
amended Public Open Space Management Plan,or an annexure to the Public Open
Space Management Plan, incorporating the required amendments shall be lodged for
approval prier-to-issue -of-a-Development-Rermit for-Operational_-Workswithin one
month of the date of this decision notice.
46.12. The Public Open Space Precinct shall be named Lake Doonella Conservation
Reserve.
16.A ‘Compliance Checklist: shall be-included in its entirety -in the-Publie-Open Space
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Page 20
Formatted: Bullets and Numbering 16.2-Genst Formatted: Bullets and Numbering Formatted: Bullets and Numbering 16.6:Construction of the nedestiian-pathwey-shewn-on-Map-6-—To-be-2-2.0-m-wlde concrete-path,-with-0-5-m-wide-gravel-shouldersand-appreximate-length-of pedestrian-pathways--the- -sewer main in and connections. to. the sewer main. 16:4+4.No-weeds-in-rehabilitated areas. 46-42.All planted-stect-in-rehabilitated areas is-healthyand+robust 7 i iH i 7 Fos «~~ 7 | Formatted: Bullets and 46-43-Define the boundary of the take- viewing area-by-logs: Numbering Neighbourhood Park 16-44-Fo-be-600-m2in-area: tone 16.15.4-fence-along-the-common-boundary of the neighbourhood -park and 4 & tlic Ope Space-is-¢' Hd-preef
Page 21
Swanbourne Way Connection ——
4646-The_develeperwill-construct_2_pedestian/bikeway_tinkage_in_the—vicinity—of - - - + Formatted: Bullets and
pF ip c. vt { ts, 499 446++ th Dy Ft, LF Strut tod net f--Swanb: Hine
Way in the form-of-a conerete path-and-timber bridge 2-metres-wide-as-part
of Stage-B.—_This_will necessitate _the_ereation-of a-wide-eneugh easement
: the-Public Open Space-near Beckmans Road:
46-1-7.5-1.-identifieation-and: regulatory sign -prohibiting—swimming: and
4647-72 regulatory-signs—lecated-on-each-gate-on. the-maintenance
478-2 «direction si junctions:
Bushfire-Control
Numbering
Formatted: Bullets and
Numbering
46-19:Fire-fuel loads do not exceed -10-tonnes/ha-in-any_location in.the-Public-Opens - - - [Formatted utes ang |
Numbering
Erosion Contral_And-Remediati
146-24.No-active-eresion, particulary ia-guilies: = H jon, } i ies: woe
16:22:Rehabilitation-of-all-disused-tracks,-and-aleng-the existing sewer main.
Weed Gentrel
Other
16-26:No-rubbish-or- graffiti:
Ew a 8
Page 22
Open Space Management Pian_shall be amended to
e-incerperated_intethe—Public
reflect the following changes to
the Conservation Residential allotments:
13.1. removal of the group housing component; and
13.2. removal of the private open space from the allotments and converting this area-
into public open space.
Throughout the
document:
Page-7-dot
Page 16; item
5:
Page-23;
Section 5.4,
Hern-2
and
Page-24;
Section-5:4;
ttera-6:
Page-24Hem
Page-24:
Desired
outcomes:
Page 26;2{e)
Pages 2#—29:
Rages-40-44
and 42
and
Rage-56:3.2-43
Page-58
Appendix IV:
Delete alt references to the Developer being ‘Lensworth Lake
DB th € view .
defined-bytegs—
The concrete-part-of-the-pedestrian-_pathway-is-2-m-wide-not3
rr-wide
species indigenous to the site
Add-the-additionalitem. i. j 7
‘tiv} -Fwo-locked-gates-on-maintenance track.’
. ‘ "
by rporat 4—_reauirerment—_thatN. s54—Council—t je
y e ™ u
. f : : C
approval/relocation to suitable site.
Amend-in-aecerdance_with-Conditions of Approval for-the- Flora
and-Fauna Management Plan-
Formatted: Outline numbered
+ Level: 2 + Numbering Style:
1, 2, 3, ... + Start at: 1+
Alignment: Left + Aligned at:
1m + Tab after: 2.cm +
Indent at: 2 cm
Page 23
Definitien-of include—a—definition-of ecologist requiring—a-tertiary_edueation Ecologist person_in_the—field ef _ecolegy—with—at_least 3—years—field experience. 48:14. Prior to the dedication of the Public Open Space area to Council, all works in the* ~~~ Public Open Space Precinct shall have been undertaken by the Developer, to Council’s satisfaction, apart from the requirements of conditions +516.14 & 4516.15 - Neighbourhood Park and condition +516.16 - Swanboume Way Connection, which shall be completed with Stage B. The Environmental Management Plan 49.15. The development shall be undertaken in accordance with the Environmentals- -- Management Plan Revision 8-D_prepared by PMM Group and dated 22-Octeber Numbering 2004September 2005 and as may be amended by these conditions. An amended Environmental Management Plan,or an annexure to the Environmental Management Plan, incorporating the required amendments shall be lodged for approval prierte issue-of-aDevelopment Pennit for Operational Workswithin one month of the date of this decision notice. 20.16. The following—corrections—and--.amendments shall—be-.incorporated into—the Environmental Management Plan_shall be amended to reflect_the following changes to the Conservation Residential allotments:- 16.1. removal of the group housing component; and 16.2. removal of the private open space from the allotments and converting this area into public open space. ‘Lensworth+ Lake Doonella-Pty- L:td-and-replace-with-the- Developer’ The Fire Management Plan
Page 24
24:17. The development shall be undertaken in accordance with the Fire Management: - - * [fprmatted: utes and) Plan, Version 18 prepared by Rob Friend & Associates Pty Ltd and dated December Numbering 200428 November 2005 and as may be amended by these conditions. An amended Fire Management Plan, or an annexure to the Fire Management Plan, incorporating the required amendments shall be lodged for approval pherte—issue—of4a Development _Pemnit for Operational _Workswithin one month of the date of this decision notice. 22.18, The Fire Management Plan shall be amended and-corrected to_reflect the following changes to the Conservation Residential allotments: 18.1. removal of the group housing component; and 18.2. removal of the private open space from the allotments and converting this area into public open space. 22-1-ineerperate-the following Conditions; " dated-5-September-2003. Fire Protection Zones j*- - - 4 Formatted: Bullets and Numbering 24,19. Within all Fire Protection Zones: 24-419.1. individual large trees (200 mm DBH or greater) may be retained but their crowns should not touch the dwelling or vegetation in the adjacent bushland; 242,19.2. all existing understorey shrubs and all vegetation greater than 300 mm in height shalt be removed; 243:19.3. mowable ground cover plants not exceeding 300 mm in height such as the grasses, sedges and small herbaceous plants are permitted; 244.19.4. understorey shrubs and trees shall not be planted; 24-6-19.5. flammable structures and landscaping materials, such as timber fences, timber pergolas, timber decks and timber sleeper walls, are prohibited; 24.6-19.6. non-flammable structures such as paved areas and swimming pools are permitted. Maintenance Track in the Public Open Space Area 25.20. A 3 m wide maintenance track/fire trail, for the use of Council's maintenances - - - vehicles and emergency vehicles, is to be provided within the Public Open Space Numbering area adjacent to the northern boundary of Lots 1 - 17 and 24. It will be on the alignment indicated on the Survey Plan dated 612-66 by PMM, and will be included as an easement or included in the Public Open space. If included in the open space, the 10 metre fire buffer will measured from the original Plan of Development Boundaries of the Lots.
Page 25
26:21. Significant trees and groups of trees are to be retained. The trees and groups of trees to be retained will be determined by Council’s Manager — Environmental Services. All shrubs and woody understorey plants shall be removed. Existing grasses, sedges and small herbaceous plants (less than 300 mm in height) wil! be retained. 2722. Locked gates will be provided at either end of this maintenance track. This track is not part of the public pedestrian pathway and public access will be prohibited. Signs prohibiting public access shall be provided at both ends of the maintenance track. 28.23. The maintenance track and locked gates shall not be located within 10 m of the scar tree. 29.24. Prior to the dedication of the Public Open Space to Council, the developer shall maintain the maintenance track. Fire Fuel Reduction Public Open Space post-dedication to Council 30:25. After dedication of the Public Open Space to Council, fire fuel loads in each of thee - - - four Fire Management Blocks will be assessed annually. In the Fire Management Blocks where fuel loads exceed 10 tonnes/ha in more than 4 assessment plots, fuel reduction will be undertaken manually using hand tools. A prescribed bum within a Fire Management Block will only be undertaken if Council's Manager — Environmental Services deems it necessary to maintain the ecological values of the vegetation. The applicant will undertake this procedure for a period of three (3) years after the registration of the final stage of the development or until such time as the development works are accepted off-maintenance_by Council, whichever is the sooner. Private Open Space in Conservation Residential Precincts 31.The -fire fuel loads in--the Private -Open—Space—areas--of_the -three—-Conservations - - Residential Precinets-will-be-assessed-annually— If the-fire fuelload-in a-Private Open Space-area-_exceeds—10-tennes/ha in_more_than-3-_assessment plots, fuel reduction will be undertaken-manually-using-hand tools. 32-Prescribed_burns-will-not-be-permitted, unless ecological data: Undeveloped Stages 33:26. Following completion of Stage A, fuel loads in the undeveloped Stages are to bes- - - assessed annually. When fuel loads exceed 10 tonnes per hectare in more than 4 assessment plots, the fuel load is to be reduced by either a low intensity prescribed burn (provided that adequate firebreaks are constructed adjacent to all Public and Private Open Space areas, the school and the Stage A residential areas) or by the physical removal of the fuel load by hand or machine). Fire Hydrants and Water Points 34.27. Fire hydrants shall be provided throughout the development in accordance with thes - - - Building Code (BCA) and the requirements of the Q.F.R.S. Formatted: Bultets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbering
Page 26
-10- 36:28. Each residential allotment that includes Private Open Space, or abuts Public or Private Open Space shall be provided with a 20 — 25 mm water connection and garden tap, located within 2 m of the Open Space area. Each tap shall have a permanently attached 20 m long garden hose and hose reel. The installation and maintenance of these requirements shall be the responsibility of future residents, with the requirements included within the Residential Design Guidelines. 36:29. For the Forest Cluster Precinct, 20 - 25 mm water connections and garden taps shall be provided at a maximum spacing of 40 m along its common boundaries with Open Space areas. Each tap shall have a permanently attached 20 m long garden hose and hose reel. Other Bushfire Protection Measures 37,30. Lots 91 to 94 and 106 to 111 shall be totally cleared of all existing trees, shrubs ands - - - woody understorey plants prior to building commencing on these Lots. Grasses, Numbering sedges and small herbaceous plants shalt be retained. 3831. The Fire Management Plan for the Development Area shall include the requirement that a Bushfire Information Kit will be provided to all purchasers of allotments on the site. The Bushfire Information Kit will be submitted to Council with the Survey Plan for Stage A of the development. 39:32. Burning of rubbish, cleared vegetation, surplus materials, etc., on the site is prohibited. Other 40:Access-easements-through-the-Genservation-Residential-Precinets—building-envelopes's - - - to-the-Rrvate-Open Space boundaries-_are-net required: Numbering Flora And Fauna Management Plan 44:33. The development shall be undertaken in accordance with the Flora and Faunas- - - Management Plan, Version 12 prepared by James Warren & Associates Pty Ltd and Numbering dated December-200412 April 2005 and as may be amended by these conditions. An amended flora and Fauna Management Plan, or an annexure to the Flora and Fauna Management_Plan, incorporating the required amendments shall be lodged for approval prior-to-issue of-a-Development-Permit_for-Operational Warkswithin one month of the date of this decision notice. 42.34. The Fauna Manage! 34.1. remove the reference to the requirement for the design quidelines to stipulate that pools are to be fitted with a koala rope; and 34.2. reflect the following changes to the Conservation Residential allotments: 34.2.1. removal of the group housing component; and 34.2.2. removal of the private open space from _the allotments and converting this area into public open space Page 3—Last Add-the following to the end of the paragraph: Envi suitably ‘ne ed —and — experienced —Beolegist — Management Plan-and monitor the-Contractors-compliance
Page 27
-11- 32:3: Page 6:Section 3:2:4: with—theFlera—andPauna Management Plan—and—the Envi i : : : provide—. infermation--—for the-- menthly—— Environmental Compliance-Repors-for Council- Add-the-follewingte-the-end of the-sentence: last-sentenee: Page 15; Plan-and- ail-other_approved_Erosion_and_ Sediment control Plans- : ! : . C V's M Environmental Services- Replace-the last sentence-with-the-following: Page 20; Add-the-following-to-the-erd-of-the-paragraph: ‘The-number, size-and-location-otthe- hollow-limbs-placed-in Public_andPrAvate-Open _Space_areas_will be-determined by the-Site _Ecologistin-consultation_-with-the-Counci's Manager — Environmental-Services—Thesetogs-should-not -create- a fire-hazard- At-the end-of the-third- sentence. add-the-following: Thi “api ‘ . . . with—and_tak. into—a LRi—_th: resiilts—of—th. Waterecvcle than t s-of tercy Condition. 55.’
Page 28
-12- Landscape Management Plan 43:35. The development shall be undertaken in accordance with the Landscape* Management Plan, Issue H prepared by EDAW Gillespies and dated Octeber 200429 November 2005 and as may be amended by these conditions. An amended Landscape Management Plan_or an annexure to the Landscape Management Plan, incorporating the required amendments shall be lodged for approval prierteissueof a Development Pernit-for Operational-Workswithin_ one month of the date of this decision notice. 44:36. The fellowing—eerrections—and—amendments—shall_be—incerporated inte—_the Landscape Management Pian_shall be amended to reflect the following changes to the Conservation Residential allotments: 36.1. removal of the group housing component; and 36.2. removal of the private open space from the allotments and converting this area into public open space. Site Access-Map- Page 7: Delete -50-in-the -seventh-box-in-_the-key-and-replace-with Page-+7-fourth Delete-the-current-werds-and-replace-with-the-following: dot-peintin the op Pri 0 Ae C, . ‘On-going Resi ‘ial Presincti : f . maintenance- hi C. ion_Resi ial-Preci tt COrarAR: public-access: Page-27-last Delete-the-last sentence and-replace-with-the following: Sentence: ‘Design-and-construction-details-for-the-fauna friendly fence ate—te—be—previded—as—part_of the—Qperational Works Application forthe_first stage-ofHthe-development—AlLof the be-provided-during-the-first-stage-of development R 34-F G icf es . ith_Fi 294 shewing network the-Stermwater_and—Water- Quality -Managemeat Plan_by WBM-Oceanies. ofswales-and detention Plan: Way- Pagesteferring Gorrect-pages—-48 11.19 23_24 2526 _30-and -33-in te the-Fire accordance withthe conditions -of approval -for the Fire Management Management Plan. - 7 Formatted: Bullets and Numbering a
Page 29
-13- Plan: Sediment and Erosion Control 45.37. Detailed staged Sediment and Erosion Control Plans are to be prepared for the site* and shall be prepared to the reasonable satisfaction of Council and in accordance with the Institution of Engineers Australia ‘Engineering Guidelines for Queensland Soil and Sediment Control’ (June 1996) and in particular using Checklist No. 3 from that document. The sediment and erosion contro! plans shall cover all development on site (during the construction, establishment and operational phases) including rehabilitation and remediation. 46.38. The Sediment and Erosion Control Plans will deal with the staging of the development generally in accordance with W8M's Report 'Lensworth Lake Doonella — Stormwater and Water Quality Management Plan — Version 2, Revision 3' of 30/3/03. 4739. The Sediment and Erosion Control Plans shall also include the Public Open Space area and shall: 47439.1. Identify existing erosion problems, and 47:2,:39.2. Specify appropriate remedial! treatments. 48.40. The residential precincts shall be designed to incorporate, within their boundaries all the necessary sediment and erosion contro! devices. Stormwater Management Plan 49-41. A Stormwater Management Plan for the site including revegetation and remediations - - - of all water treatment areas including swales and bioretention systems shall be prepared to the reasonable satisfaction of Council. The Stormwater Management Plan shall be generally in accordance with WBM's Report of 30/3/03. The developer shall comply with the Stormwater Management Plan. wore 50-The-developer-shalt-comply_with the Stormwater Management Plan-and the-operationale - - - stage-compenents-of the-Stermwater Management Plan-shall_be-referenced-in_the community management -statementstorall group-heusing developments-over the site, 5442. Key water quality objectives to be reflected in the Stormwater Management Plan are the protection of aquatic ecosystems in the site gullies, Cranks Creek and the eastem creek and within the receiving waters of Lake Doonella and the Noosa River, as well as primary contact recreational standards within the receiving waters. Appropriate water quality standards to be adopted are those as specified by Brisbane City Council (in conjunction with the South East Queensland Regional Water Quality Management Strategy). - 7 Formatted: Bullets and Numbering Formatted: Bullets and Numbering Formatted: Indent: Left: 1 cm Formatted: Bullets and Numbering
Page 30
-14- §2.43. Stormwater Management - MUSIC modelling; Prior to the completion of the final stormwater management plan and the civil design drawings for operational works, any stormwater management assessments utilising the CRC for catchment hydrology's MUSIC modelling system must be corrected for a possible error in the assessment of bio-retention system efficiencies and performance in removal of Nutrients, as recently notified by the CRC. Empirical calculations such as the Brisbane City Council spreadsheet method shall be use to adjust the MUSIC model and to demonstrate that realistic removal efficiencies are being used. Alternatively, once a 'patch' is available from the CRC, this corrected version of the software can be used, but, again, cross checking with empirical calculations is required. The error in the bioretention routine will result in the need for additional water quality treatment measures. Initia! assessments indicate that MUSIC is over predicting removal by as much as twice what should be occurring.’ If these checks indicate that the bioretention devices require entarging, the applicant shail remove lots, if necessary, from the development in order to accommodate the devices without affecting the public and private open space areas. If the system requires amending, an amended report is to be submitted to Council for checking. 53.44, Monthly reports on monitoring, incidents, corrective action and plan updates are*~ ~~ Nemeetat Bullets and required to be submitted to Council. These reports are to be submitted in a form acceptable to Council and are to highlight any non-standard results. 84-45. Any stormwater outlet to the gullies on the site are to be stabilised with appropriate energy dissipation and local armouring. Regular monitoring of creek erosion is required with appropriate corrective action specified to ensure a stable creek system. All work to be undertaken to minimise impacts on the Environmental Values of the creek system. 55-46. The residential precincts shall be designed to incorporate, within their boundaries, all the necessary stormwater and water quality control devices associated with the development. 56.47, The applicant will ensure that all necessary overland flowpaths for Q100 events are provided on site and covered by an easement where they traverse private property. Water Quality 5248. The Developer is to install water quality control devices generally in accordance withs - - - the Stormwater Management Plan. Detailed staging plans and specifications, based Numbering on and generally in accordance with the Plan are to be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works. Drainage 58.49. The Developer is to complete the drainage works progressively in conjunction withe - - - development of the site and generally in accordance with the approved Stormwater Numbering Management Plan. Detailed drainage plans and specifications, based on and generally in accordance with the approved Drainage Pian, the EMP and these Conditions, are to be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works. 59-50. All drainage works as required by the Drainage Plan are to be provided by the developer at its own cost.
Page 31
-15- Water Cycle Management 60.51. Following development of the site, the vegetation in the gullies shall be monitored: - annually by a suitably qualified person (terrestrial ecologist) for three (3) years or until such time as the development works are accepted off-maintenance by Council whichever is the sooner, so as to detect any adverse effect due to rainwater tanks harvesting water that would normally flow into the gullies and sustain the vegetation. Monitoring of the vegetative conditions of the gullies shall include maintaining summer and winter photographic records at several key locations (at least 3 per gully) in each gully, which will be maintained for the duration of the monitoring period. The sites chosen for monitoring, shall be representative of the major vegetation species present in the gully, and also of those species which may be prone to changes in the hydrological regime of the gully. Details of site inspections, including photographic other appropriate contingency measures ‘shall be undertaken to rectify the problems. Certification 64.52. Certification is required from a qualified stormwater engineer/scientist that the - - - submitted civil engineering drawings accurately reflect the stormwater management treatment train in the approved stormwater management plan. This certification is to be submitted in conjunction with any Operations Works (Civil Works) application. 62.53. Certification is required from a qualified stormwater engineer/scientist that the stormwater management treatment train in the approved stormwater management plan and associated design drawings has been installed on site in accordance with the approved stormwater management plan and is functioning as designed. This certification is to be provided to the Council prior to the endorsement of survey plans, or prior to Council accepting the devices ‘on maintenance’. 63:54. All stormwater drainage lines including private drainage lines (also known as inter- allotment drainage lines) or as otherwise approved by Council's Manager of Land Development shall be inspected by closed circuit television (CCTV) at the completion of all works and immediately prior to acceptance ‘On Maintenance’. A report of the CCTV inspection, including photographic records (which includes photos & video recordings burnt onto a CD) of the inspection shall be submitted to the Council for approval. Any defects or substandard works shall be recorded and accurately illustrated on the drainage plan showing the location of the defect(s). Substandard work will not be accepted 'On Maintenance’ and must be rectified at the applicants expense with a further CCTV inspection arranged once the rectification works have been completed. To this extent all CCTV inspections, including any additional inspections necessary following defect identification and rectification, shall be entirely at the applicant's expense. Any costs incurred by Council in reviewing the CCTV inspection results shall also be borne by the applicant. Acid Sulphate Soils Management Plan 64.55. An Acid Sulfate Soils (ASS) Management Plan must be provided for any excavation* ~ works undertaken in areas of the site below 5m AHD. The Management Plan must outline all proposed ASS investigation and management procedures, which are to be undertaken in accordance with State Planning Policy 2/02 "Planning and Managing Development Involving Acid Sulfate Soils". Formatted: Bullets and Numbering Formatted: Bullets and Numbering - + 1 Formatted: Bullets and Numbering
Page 32
-16- Reconfiguration Plans 66:56. The Lot Reconfiguration for the residential areas will be generally in accordance- - - - with the following Plans by PMM Group and as may be amended by these conditions: 65-1.56.1. Proposed Reconfiguration Lake Doonella Ref: 6812-60B dated 1 March 2004 Sheets 1 to 4; and 65-2,56.2. Proposed Reconfiguration Lake Doonella Community Title Lots Ref: 6812-62 dated 2 March 2004. Amended plans are to be submitted within one month of the date of this decisions - - - notice reflecting the following changes to the Conservation Residential allotments:- . Staging removal of the group housing component; and removal of the private open space from the allotments and converting this area into public open space. 66:57. The staging of the Lot Reconfiguration for the residential areas will be in accordances - - - with the Plan titled “Construction Staging Plan” by PMM Group - Reference 6812-61H and dated 8 September 2003. General 62.58. Security in the form of a cash bond or trading bank guarantee to the sum of+-- - $400,000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be reduced to $100,000 upon completion of all construction works (except building construction) and the balance returned after the completion of the water quality monitoring and management plan requirements. Plan Sealing and Easements 68.59. For the purpose of these conditions, the following definitions apply: - 2.1 2.2 2.3 2.4 2.5 2.6 69.60. Conditions of any Development Permit for a Material Change of Use of premises A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by Council pursuant to $3.7.1 of the Integrated Planning Act 1997. A registered Professional Civil Engineer means a civil engineer who is registered in Queensland pursuant to the Professional Engineers Act 1988. Carparking area means a parking area as defined in the Schedule to the Shire of Noosa Planning Scheme inclusive of manoeuvring areas and access from the roadway. The person acting on this permit means any person or company who undertakes development pursuant to this permit. AS 2890.1 — 1993 means Australian Standard for Off Street Carparking - AS 2890,1-1993. Principal Contractor means the person nominated by the Applicant and approved by the Manager - Land Development at a pre-start meeting as being responsible for the major component of works associated with a Development Permit for Operational Works of any works on the site. relevant to each stage of this lot reconfiguration shall be complied with prior to Council endorsement of the Plan of Survey. Formatted: Bullets and Numbering Formatted: Indent: Left: 1 cm Formatted: Bullets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbering
Page 33
-17- 78-61. The proposed contemporary residential lots shall have a minimum size of 600 m, 74.62. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal documentation shall be presented to Council and shall be submitted in the correct form with the fees prescribed in Council's adopted fee schedule. 72:63. Pursuant to Section 3.7.3(c) of the Integrated Planning Act, all outstanding rates and charges due and payable to Noosa Council in respect of the lots being reconfigured shalt be paid prior to endorsement of the Plan of Survey for each stage. 73:64. Easements will be required over any publicly owned services that traverse private land in conjunction with the sealing of Survey Plans for each Stage. 74:65. Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required Grant of Easement shall be submitted to Council for perusal. Any changes required by Council's Solicitor shall be attended to prior to endorsing the Plan of Survey. Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to the endorsing of the Plan of Survey. 7866. Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's Solicitor an appropriate undertaking in writing that in conjunction with lodgement of the Plan of Survey at the Land Titles Office, the Title Deed and the easement documents will also be lodged and any additional Titles Office forms or requisitions requiring the consent of Council being attended to forthwith. 7667. All easements required on downstream properties draining the site either by way of underground drainage or overland flowpaths shall be obtained and proof of registration of the easements shall be submitted with the Survey Plan. #468. A registered easement shall be created over the zone of influence of the existing and proposed sewer mains in the site. The easements shall generally be parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the finished surface) and be no less than 3.0 metres wide. In determining the zone of influence the existing sewer must be located on site by a licensed surveyor and designated, together with the finished surface levels, on any plans accompanying any application for this property. No building, swimming pool, retaining wall over 1 metre high or any other structure requiring a Building Permit shall be constructed within or encroach over an easement. No foundations or eaves shall encroach into an easement. Plans detailing any proposed foundations in close proximity to an easement shall be designed by a registered practicing Structural or Geotechnical Engineer and be submitted with the application for a Development Permit for Operational Works. No fill shall be placed over an easement without written Council approval. Council approval will not be considered for any fill over an easement, which causes the sewer to be more than 3.0m depth. Any increase in depth to sewer as a result of fill activity shall increase the minimum building setback and width of the required easement accordingly.
Page 34
-18-
78,69. Prior to endorsement of the Plan of Survey for each Stage, a State Survey Mark+- - { Formatted: Bullets and
shall be provided within the Stage. It shall be fevelled and located to the requirements Numbering
of the Manager - Land Development. A ‘Form 6° shall be submitted for Council's
records.
Each State or other Permanent Survey Mark shall be installed clear of overhead
vegetation, making it suitable for Global Positioning Equipment, and accurately
connected to at least one real property corner by a registered Surveyor.
Contributions
79:70. The applicant shall pay to Council a contribution toward the cost of upgrading thes - - - { Formatted: Bullets and
intersection of the new road and Beckmans Road (this contribution is $64,075, at Numbering
December 2002, which will be adjusted by CPI current at the date of payment). If the
intersection at Beckmans Road requires upgrading prior to Council's planned
construction date of these works, the developer shail undertake the necessary works
at its own cost instead of making the contribution.
Dedications
80.71. The public open space areas, apart from the area adjacent Beckmans Road, ands - - - | Formatted: Bullets and
the area adjacent the Conservation Residential allotments and wildlife corridor shall Numbering
be dedicated to the Crown prior to the sealing of the first completed Stage in the
Staging Plan of the development. The public open space area adjacent Beckmans
Road and wildlife corridor shall be dedicated to the Crown prior to the sealing of
Stage C in the Staging Plan of Development. The public open space area adjacent
the Conservation Residential allotments shall be dedicated to the Crown upon
completion of the vegetation monitoring required by Condition 51. The public open
space will be in the condition required by the Open Space Management Plan.
Headworks
84.72, For the residential component, contributions shall be paid to Council in accordances - - - { Formatted: Bullets and
with Planning Scheme Policies PSP 28 and PSP 30 on Water Supply Headworks Numbering
Contributions and Sewerage Headworks Contributions respectively and at the rates
applicable at the time of payment.
An estimate only of the contribution rates as of December 2004 under the current
policies is as follows:-
Stage A
Water Supply $285,909
Sewerage $258,488
TOTAL $544,397
Stage B
Water Supply $237,429
Sewerage $207,979
TOTAL $445,408
Page 35
-19- Stage C Water Supply $208,527 Sewerage $181,239 TOTAL $389,766 Stage D Water Supply $17,093 Sewerage $14,856 TOTAL $31,949 With regard to Stage D, the future development of the Forest Cluster Precinct will attract further contributions that will be assessed at the time of the future applications. Headworks contributions shall be paid prior to Council endorsement of the Plan of Survey for each Stage of the reconfiguration. Roads 82.73. All roads shall be constructed generally in accordance with the layout indicated one - - - Plan of Development prepared by PMM, Drawing Number 4740-56b dated 21 June Numbering 2004 and the conditions contained in this approval. 83-74. The road to the east that will connect to Swanbourne Way ultimately shall have a 20 metre wide road reserve between the entry road and Lot 6 on RP 80412 and can reduce to 16 metre wide road reserve along the eastern frontage of proposed lots 124 and 125. This road shall have an 11 metre wide pavement (kerb to kerb) for its full length. 84.75. All new roads will be required to comply with Council requirements for carriage widths. The road design may not be strictly in accordance with Council's Engineering Standards but this is because of the required incorporation of swales, vegetation retention and pedestrian/bikeway paths and will be to the satisfaction of Council. 85.76. The access to the new school shall be in accordance with the approved drawings in Development Permit 23468 DA. This roundabout will also service the contemporary parcels on the east of the development. Council may consider a separate egress point from the school site if Australian Standards requirements for sight distance and a traffic loads analysis indicates that roundabout 4 on Eraland Consulting Pty Ltd Drawing No. 01691-100 dated April 2003 have enough capacity to cater for the increase in traffic generated by this modification. 86.77. The developer will also be required to undertake the necessary modifications to the existing school’s access and car parking in accordance with Eraland Consulting Pty Ltd Drawing Nos. 01691-1 Amdt D, 01691-2 Amdt E and 01691-3 Amdt D Dated July 2003. The developer will have to construct the new road on an alignment that allows the school access to be constructed in accordance with this plan and will also construct the modified car park and access at the existing school. Discussion is to be held with Queensland Education about programming of construction.
Page 36
-20- 8778. Access to each lot shall be constructed to the standards and requirements of the Council. 88.79. The following frontage works shall be constructed across all road frontages within the site:- 88479.1. Construction of new kerb; 88.2.79.2. Vehicular access to each lot; 88.3:79.3. Associated stormwater drainage, generally in accordance with WBM's Report of 2/10/02 and as subsequently modified in their letter to Council of 14/11/02.; 88.4.79.4. New stormwater management to correct the current problem of stormwater discharge from the road reserve to the Noosa Primary School; 88-5-79.5. Hot mix correction to existing pavement as required; 88.6.79.6. Concrete bikeways/footpaths. The Developer is advised to contact Council to obtain the footpath alignment. 88:7,79.7. The remaining footpath area shall be formed, topsoiled and turfed, and planted with trees. A Development Permit for Operational Works shall be obtained prior to undertaking these works. 89:80, Alterations to lot sizes, number of lots and layout may be required following thes -- - issue of a Development Permit for Operational Works in respect of the internal roadworks design. 99.81. The developer will construct industrial strength crossovers to two parcels at the end of the proposed cul-de-sacs to enable the largest service vehicle to do a three point turn and leave the street in a forward direction. This will be included in an operational works application. Bikeways/Pedestrian Paths 9482, The developer will construct a path along the Beckmans Road frontage of existings - - - Lot 7. The Beckmans Road and new road bikeways should be constructed generally as indicated on Eppell Olsen & Partners Drawing No 3866-003 Issue A dated October 2002. The bikeway on the Beckmans Road frontage may need to be aligned within the open space area but any alignment would require vegetation retention. 92.83. The developer will construct a pedestrian/bikeway linkage in the vicinity of proposed Lots 109 -110 to the northern constructed end of Swanbourne Way in the form of a path and timber bridge 2 metres wide. 93:84. Internally (that is the area of the development north of Plan 3866-003) the bikeway network should be as indicated on Plan 6812-39 by PMM Group dated 13/02/03 with the exception of bikes being allowed in the open space area except the Swanbourne Way crossing. The pedestrian paths indicated in the open space on the plan will need to have their alignment and need agreed to in the Open Space Management Plan. 94.85. The developer will also construct a bikeway within the site along the road that allows connection to the new road linkage, through the parcel to the east, to Swanbourne Way required by this permit. Formatted: Bullets and Numbering Formatted: Bullets and Numbering
Page 37
-21-
96-86. The developer will also be required to pay a contribution towards the construction of
the bikeway link to the Lake Entrance Boulevard Network. The amount of the
contribution shall be calculated at the rate current at the date of payment, subject to
CPI changes. The contributions payable for each Stage (prior to endorsement of the
Plan of Survey for that Stage) at December 2004 are:
Stage A - $21,944;
Stage B - $17,456;
Stage C - $15,461; and
Stage D - $1,247.
With regard to Stage D, the future development of the Forest Cluster Precinct will
attract further contributions that will be assessed at the time of the future applications.
Sewer
96:87. The sewer network shall be generally in accordance with the approved ‘Sewerage - - -
Reticulation Master Plan’ - Drawing 01691-130B by Eraland Consulting.
9788. Design for a sewerage system to connect all new lots within the site to Council's
existing sewerage reticulation system shall be to the standards and requirements set
out in Council's Engineering Design Standards. {f the design requires the construction
of a pump station and a rising main, the connection point to Council's existing system
will be nominated by the Manager - Land Development.
98.89. Detailed design drawings and calculations shall be submitted with an application for
a Development Permit for Operational Works in respect of water or sewer works. To
avoid conflict with other underground pipes or services, all existing and proposed
services required by the development shall be shown on the plans.
99.90. All connections to sewer system shall be carried out either by Council or by a
Council approved Contractor and at no cost to Council. Any connection to a water
main shall be undertaken by Council.
Water
400-91. The water supply network shall be generally in accordance with the<-- -
approved ‘Water Supply Master Plan’ - Drawing 01691-140C by Eraland Consulting.
404-92. An application for a Development Permit for Operational Works for services
shall be obtained prior to commencement of works.
492-93. A reticulated water supply system shall be provided to connect to Council's
existing systems, including a metered water connection to the property boundary of
each proposed new lot within the site. All fees for the supply of water meters shall be
paid to the Council.
403.94. Fire hydrants are to be provided throughout the development in accordance
with Council and Queensland Fire Service standards.
4.04.95. Provision shall to be made in all parks locations for a water connection and
should conform to the recommendations of the Bushfire Management Plans. Under-
toad service conduits shall be provided to ensure a connection is available.
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Page 38
-22- Power, Telecommunications and Street Lighting 405.96. Any alteration of a public utility or other facility necessitated by the-- - - development of the land or associated construction works either internal or external to Numbering the site shall be at no cost to Council. 406-97. All lots are to be connected to underground power and telecommunications. 40498. An underground electricity service shall be provided to each lot if not already provided. In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with Council's Manager - Works Support to prepare detailed designs of the electrical proposal. The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their approval submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of Survey. Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at the applicant's expense and shall not entail a financial encumbrance on future purchasers of the proposed lots. 498-99. Street lighting and pathway lighting throughout the subdivision shall have a¢- - ~ high energy efficient rating to the reasonable satisfaction of Council and shall Numbering generally be provided in accordance with the principles of Council’s Engineering Design Standards, section 11.3.3. 409-100. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the provision of new telephone services to the proposed lots. In this regard written confirmation from an approved telecommunication agency shall be submitted to the Council prior to Council endorsing the Plan of Survey. Engineering Works Designs 440-101. A suitably qualified Registered Professional Engineer, specialising ins - - - hydraulics shall prepare engineering drawings and specifications for stormwater Numbering designs and shalt be submitted in conjunction with an application for a Development Permit for Operational Works. 4444102. All designs for engineering works involving the construction of pavements, kerb and channel, vehicular access, footpaths, turnouts, stormwater drainage, water supply or sewerage reticulation shall be prepared generally in accordance with the tequirements of Council's Engineering Design Standards (except where affected by the Water Sensitive Urban Design Principles), shall reference where applicable to Council's Standard Drawings and shall incorporate best engineering practice. 442-103. Prior to Council endorsing a Plan of Survey, a certificate from a registered Professional Civil Engineer shall be submitted to Council for each Development Permit for Operational Works issued pursuant to this permit. The engineer shall certify that he has supervised those works and that they have been completed in a workman like manner in accordance with good engineering practice and in accordance with that permit.
Page 39
-23- 443-104. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. In this regard a DXF/OWG file an GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any application for Operational Works. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au ). 444.105. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council’s records. The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shall not be granted until all As Constructed information has been supplied and accepted by Council. General 445.106. All Class 1, Class 2 and Class 3 pest plants declared under the Lands - -- Protection (Pest and Stock Route Management) Act 2002 are to be controlled on the Numbering site prior to Council endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2 pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they threaten environmentally significant areas of the site such as riparian zones and areas of natural vegetation. Where class 3 plants are removed as a result of this condition and there is not sufficient natural regeneration of native species, the areas shall be replanted with endemic native species so that a sustainable natural ecosystem is restored. Council's Conservation Management Supervisor will not inspect the site until 30 days after the weed treatment and replanting is complete. 446-107. The following steps shall be undertaken prior to commencement of any* ~~~ construction:- 446-4:107.1. The Principal Contractor shall give Council's Inspector seven (7) days' notice of intention to commence works. 446-2-107.2. The Principal Contractor or any of his subcontractors shall not undertake any works unless each contractor has public liability insurance in the sum of $10,000,000 and copies of current public liability insurance policies are submitted to Council's inspector. 446:3-107.3. The Principal Contractor shall nominate a site representative and give a telephone number that can reach the site representative at any time during a 24-hour day. 116.4.107.4. _ The site representative shall arrange to meet on-site with Council's Inspector to obtain Council's requirements for construction of access. 446-5-107.5. All signage, including that for safety during construction, shall be in accordance with the Manual of Uniform Traffic Control Devices and Department of Transport (Main Roads Division) Roadworks Signing Guide.
Page 40
-24- 444108. Prior to excavating any material to be used for fill on this site, a Development Permit for Operational Works shall have been obtained for the site from which the excavated material is taken. A soil report shall be submitted with the application certifying that the material is free of acid sulphate soils and other deleterious materials. 448-109. The transportation of all materials to and from the site shall be undertaken in a manner such that no particulate matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. 449-110. A program of works is to be submitted at the Prestart meeting detailing the construction schedule and proposed environmental protection measures. Where the program is changed for any reason whatsoever, a copy of the revised program shall be submitted to Council's Works Inspector within seven (7) days. 420.111. For the following classes of work associated with development, a+--- Development Permit for Operational Works must be obtained prior to commencement of works relating to that class of work. The application may combine any or all of these classes of work: 420-4-111.1. Site Civil Works; 420-2-111.2. _ Roadworks; 420-3-111.3. Stormwater Drainage; 420-4-111.4. _ Frontage works; 420-5-111.5.___ Sewer reticulation including new mains, relocations, diversions, pump stations and rising mains; 420-6-111.6. Water reticulation; 420-4111.7. Site Filling; 429-8-111.8. _ Excavation of materials to fill another site; and 420:9-111.9. Landscaping. 424.112. Operational works shall be carried out in a manner that prevents: 424-4+112.1. Pollution of a waterway; 424-2,112.2. _ Dust/sand nuisance to residents in the vicinity; 424:3-112.3. Transfer of dirt and debris onto a public road; 424.4.112.4. Excessive noise (less than 1.5 Dba above ambient measured at the lot boundaries); 424-5-112.5. Excessive traffic delays (less than 5 minute delays); and 424:6:112.6. _ Diminution of neighbourhood amenity (long term parking of employees vehicles, parking of construction equipment etc.). 422-113. A traffic management plan shall be submitted in conjunction with a Development Permit for Operational Works involving road or drainage works. The plan shall address all phases of construction to be undertaken on site. Formatted: Bullets and Numbering
Page 41
-25- 423-114. Where operational works are likely to affect nearby residents and the Noosa Primary School, at least 3 days notice of commencement of work, the name of the site supervisor, and a 24 hour contact telephone number shall be distributed to affected residents. 424-115. Earthworks shall be generally contained within existing and proposed road teserves. Where earthworks are required for the provision of services, existing contours shall be restored. 425-116. Fill imported to the site may only be from a site licensed with The Environmental Protection Agency or from a site for which a Development Permit for Operational Works has been issued approving the export of fill. 426-117. A registered practicing Geotechnical Engineer shall test the existing ground conditions for suitability of placing additional fill, prior to such fill being placed. 427118. Any existing fill or natural materials on the site or with the extent of approved works external to the site which do not satisfy a Geotechnical Engineer's requirements shall be removed and replaced with suitable material. 428.119. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A. A registered practicing Geotechnical Engineer shall supervise all the placement of fill and shall certify that all lots have been compacted to the required standard. 428-120. Following completion of the filling works and prior to endorsement of the Plan of Survey, the registered practicing Geotechnical Engineer supervising the works shall submit compaction tests across the entire filled areas and a site classification report for each lot subject to filling. The extent of fill and each lot site classification shall be shown on a metes and bounds survey plan. 130.121. An appropriate property notation shall be placed on Council's rates records to advise prospective purchasers of lots that have been filled that special foundations requirements will apply. 434-122. Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining properties to the reasonable satisfaction of the Manager - Land Development. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. 432-123. The stormwater discharge from the site shall be designed such that there is no net increase in the rate of discharge as a result of the development for storm events up to 100 year ARI. 4832124. Tabulated hydrologic and hydraulic calculations that demonstrate the adequacy or otherwise of the existing site stormwater drainage system shall be submitted in conjunction with a Development Permit for Operational Works. Such calculations shall include any remedial measures necessary to rectify defects in the existing system. Where proposed site drainage is to be connected to the existing system, the calculations shall clearly demonstrate the adequacy of the existing drainage network to accept the additional stormwater flows. 434-125. Stormwater drainage shall include measures to protect proposed allotments from run-off from or to surrounding land. The design shall also address controls for gross pollutants, nutrient runoff, oil and grease, and silt and sediment (in accordance with the approved Environmental Management Plan).
Page 42
-26- 436-126. Underground stormwater systems shall be designed in accordance with Noosa Council's Engineering Design Standards, and shall be connected, where possible to Council's existing drainage systems. 436.127. An easement of minimum width 4.0 metres shail be granted in favour of Council over any stormwater pipes that traverse private property. 4387128. The design plans detailing surface levels, which shall be controlled across the site of the development to create a major storm event overland flow path system to cater for the 1:100 year design storm, shall be submitted in conjunction with a Development Permit for Operational Works. Any overland flow from external catchments shall be accepted and incorporated in the major event surface flow drainage system through the site. Overland flows shall be discharged in a safe manner and the product of velocity time depth shall not exceed 0.4 m*/sec. 438-129. The design plans are to show how stormwater runoff within and from the site is to be controlled both during construction and permanently. The plans are to indicate measures to be taken to prevent erosion and the export of sediment from the site in accordance with the approved Environmental Management Plan. 439-130. An easement for drainage in favour of Council shall be created over the full length and width of major storm event surface flow paths within the site at no cost to Council. 440.131. A minimum floor level freeboard of 0.5m shall be provided for habitable and storage areas above the top water level of the stormwater overland flows. 444132. Details of any proposed estate entrance signage shall be submitted in conjunction with an application for a Development Permit for Operational Works for either roadworks or landscaping. A $1500 fee shall accompany the application. The design shall conform to Council's "Signage Policy - Development Estate Entrance". 442.133. The proposed names of new roads (public and private) and parks shall bes ~- - - lodged with the application for a Development Permit for Operational Works. Names are to be selected from any of the following categories:- Formatted: Bullets and Numbering 142:4.133.1. Easily pronounced words of Murri languages. we 442,2,133.2. _ Names or words of local significance or historical interest. 442-3:133.3. Flora, fauna, industry, topographical, geological and similar features and terms relative to the district. 442.4.133.4. __ Surnames of persons of merit or historical significance. (Personal names should be avoided.) Approval will not be given to a name that is the same or similar to the name of another road in the Shire, or of a road in close proximity in a neighbouring Shire. Names that are not easily pronounced, or may cause confusion to emergency services are to be avoided. 443.134. All street signs on new roads (public and private) and parks shall be erected prior to works being accepted on maintenance. 444-135. The person acting on this permit shall apply and obtain for all other necessary permits including crane permits, road opening permits, hoarding permits, footpath occupation permits and/or any other approvals required under any other Act. Formatted: Bullets and Numbering
Page 43
-27- 446-136. Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant shail sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath, kerb and gutter, or other Council property damaged as a result of construction of the proposed development. If any person acting under this permit damages any Council property or facilities (such as underground drainage, water supply and sewerage) , through any cause whatsoever in the course of, directly or indirectly carrying out development, that person shall forthwith notify the Manager - Land Development and shall forthwith rectify that damage at its cost and to the satisfaction of the Manager - Land Development. Altematively, the Applicant may request the Council to carry out the rectification works. Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall be undertaken by either Council or a Council approved contractor. In all cases, Council reserves the right to carry out rectification works in an emergency and where no reasonable attempt has been made to complete the rectification works as part of the development. All costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement of the Plan of Survey. 2 ADVISORY NOTES “| The following Advisory Notes are for information purposes only and do not form conditions of approval: 1, Approval of this development application will trigger an Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan. The estimated amounts per Stage are as follows: Stage A - $195,132; Stage B - $173,912; Stage C - $158,276; and Stage D - $12,765. With regard to Stage D, the future development of the Forest Cluster Precinct will attract further contributions that will be assessed at the time of the future applications. These amounts will subject to variations in the Price Index, All Groups Brisbane from December 2004 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated Planning Act 1997. This notice will require payment of the charge for each Stage prior to the endorsement of the Plan of Survey for that Stage. Payment via credit card transaction will not be an acceptable method of payment for development contributions conditioned in this permit or for infrastructure charge notices issued separately.
Page 44
-28- 3. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of operational works exceeds $80,000, then a portable long service levy is required to be paid. In accordance with Section 77.(1) of the Act, Counci! is required to sight the approved form issued by the Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational works must be submitted to Council with the lodgement of any application for operational works over the site. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. |t is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any obligations under the ACH Act. [3 FURTHER DEVELOPMENT PERMITS REQUIRED Type of Development Permit Subject of the required Development Permit fequired vee ein ce Development Permit for Material Dwelling Houses and Dwelling Units | Change of Use ' tee ot Fee beara en ee Development Permit for Building Dwelling Houses, Dwelling Units and Estate Works | Sales Office Development Permit for Operational Landscaping, car parking and access, frontage Works works, stormwater disposal, sediment and erosion controls, filling of the site
Page 45
Proposed Amendments to Judgement/Order relating to Appeal No. BD2220 of 2003 Preliminary Approval for Material Change of Use & Lot Reconfiguration 1. Development over the subject site is to comply with the Plan of Development, Drawing Number 4740-56b prepared by PMM Group, dated 21 January 2003 (as amended by conditions 2 & 3) and the conditions contained in this preliminary approval. The development over the subject site shall comply with the following: 2.1. 2.2. 2.3. 2.4, 2.5. 2.6. 2.7. 2.8. 2.9. 2.10. All necessary fire protection measures and devices that are required to protect the development from bushfires shall be incorporated within the premium, contemporary, conservation residential precincts, forest cluster precinct and secondary school precinct. All necessary stormwater & water quality management & control devices associated with the development shall be incorporated within premium, contemporary, conservation residential precincts, forest cluster precinct and secondary school precinct. No development (roads, buildings, vegetated swales, bioretention/iltration devices, sediment ponds or fire breaks associated with the development) shall be below RL16 in the subcatchments that naturally drain directly into Lake Doonella or its associated marine wetlands, except for the provision of sewer connection through the public open space precinct. No development or clearing of vegetation shall be undertaken within 100m of Cranks Creek and the eastern property boundary adjacent Lot 502 RP867858, except for the provision of sewer connection through the public open space precinct. No development or clearing of vegetation within 100m of the wetlands & drainage lines or within areas with important ecological values within the context of the site for the downstream of the confluence with the east-west gully and 70m of the upstream of the confluence with the east-west gully, except for the provision of sewer connection through the public open space precinct. The open space over all gullies shall be a minimum of 50m wide, at least 25m on either side of the drainage line and shall include the upstream extent of the gullies. A one lane access way shall be permitted access across the head of the school site's gully along the site’s southern boundary. No development, such as roads, buildings, vegetated swales bioretention/filtration devices, sediment ponds or fire breaks, driveways or driveways associated with the development shall be undertaken within the private open space over gullies. No development within 30 metres of Beckmans Road, comprising 20 metre wide public open space and 10 metre private open space area, except for the provision of a bikeway within the public open space precinct and a sewer line through the private open space precinct. No development including pathways, shall be permitted within 30m of the tree supporting the Sea Eagles’ next, with all natural vegetation retained. No development shall be permitted within 10m of the scarred tree.
Page 46
Plan of Development The Pian of Development, Drawing Number 4740-56b prepared by PMM Group, dated 21 January 2003 shall be amended in accordance with the following: 3.1. 3.2. 3.3. 3.4. 3.5. The assessment table shown in the bottom left hand corner is to be titled ‘Assessment Table’. The Assessment Table is to be amended to incorporate Column | Column Il Column Ill Precinct Self Assessable Code Assessable Group-heusing- development Dwelling houses where complying with the specific requirements identified on this plan for the Conservation Residential Precinct. Conservation Residential | Nil (Group Housing) The note below the Assessment Table is to be amended as follows: 3.3.1. The maximum yield for the development shall not exceed 247 allotments, comprising: 3.3.1.1. Conservation Residential (Group-Housing)-not exceeding 43 Dwelling units. 3.3.1.2. Premium Residential not exceeding 52 Dwelling houses. 3.3.1.3. Forest Cluster (Group Housing) not exceeding 23 Dwelling units. 3.3.1.4. Contemporary Residential not exceeding 129 Dwelling houses. The legend at the top of the Plan of Development describing the Precincts is to contain names that are consistent as follows: 3.4.1. Conservation Residential (Group-Heusing)Precinct. 3.4.2. Forest Cluster (Group Housing) Precinct. 3.4.3. Public Open Space Precinct. 3.4.4. Private Open Space Precinct. The table on bottom right hand side of the Plan of Development is to be titled ‘Key Requirements’, and is to include the following amendments: 3.5.1. Reference to ‘other than Reconfiguration of a Lot’ is to be removed. 3.5.2. The description ‘School Site’ is to renamed ‘Secondary School’. 3.5.3. The Educational Establishment section of the Key Requirements table shall include:
Page 47
3.5.3.1. Car parking shall be provided in accordance with the planning
scheme that being 1 space per employee, plus 1 space per 10
students, plus a sealed area making provision for 5 buses.
3.5.3.2. Maximum site cover of all buildings shall not exceed 15%.
3.5.3.3. Maximum gross floor area shall not exceed 9000m?.
3.5.3.4. Minimum landscaped setback to residential properties shall be
not less than 10 metres.
3.5.3.5. All building design shall incorporate pitched roofs, eave
overhangs and a mix of materials, including
Zincalumnicolourbond roofing.
3.5.3.6. A 1 lane access way shall be permitted across the head of the
school site's gully along the sites southern boundary.
3.5.3.7. The secondary school shall be fitted with a rainwater collection
and reuse system with a minimum capacity of 100,000L. This
system will be appropriately designed such that runoff from
major roof areas is collected and delivered to a rainwater tank(s)
for use for non-potable (non drinking water) to supply toilet
flushing ata minimum.
3.5.3.8. The development shall make provision for a minimum 6.0 metre
landscaped buffer to the road reserve. Subject to Council
consent, this setback may be varied where it is demonstrated
that a lesser buffer will not impact on amenity of the streetscape.
3.5.4. Reference to the Conservation Residential (Group Housing) Precinct is to be « - - -
amended to read:
Formatted: Bullets and
Numbering
Formatted: 'Indent: Left Left: 1.27
cm
4.1. Conservation Residential; oa
. we
3.5.5. The last dot point under key development requirements for Premium 5s | Nompanpeds Bullets and
Residential and Conservation Residential is to be amended to read:- ‘Os —
+ Areas of private open space (for Premium Residential only) are to be ‘\ Formatted: Indent: Left: 1.9
managed as discrete hydrological/ecological units tg achieve desired ‘
environmental outcomes, with no development permitted in the private open
Space areas, apart from works permitted by an approved EMP.
3.6. Further dimensions shall be provided on the Plan of Development showing the
width of the open space area surrounding the developable part of the site
pursuant to condition 2.
Formatted: Bullets and
Numbering
3.7. The Plan of Development shall be amended to include:
3.7.1 Arevised access to the new school and eastern parcels as referred to in
condition no.98.
3.7.2 A pedestrian bikeway linkage as referred to in condition no.103.
3.7.3 A loca! neighbourhood park (600m?) shall be developed adjacent to the
forest cluster precinct as shown on Drawing No 68124 oe Lm ae pronmnately
3.7.3-1-Thetree canopy-shall-be-retained-througheutthe-park-with-patches + - - - -{ Formatted: Bullets and
etintact bushland jatermingled-with-smal-areas-ef mewn grass, Numbering
Page 48
eee e--- 3.7.3.5Genrstruct-an-approprate tence or chidproof barrie-around-the fecal neighbourkeed-park- developmentfrom-this nerhern-road. tel rrunieation-infrastrueturereauirements_thatwould-enceur: t Hef HORA i et tat ie home-based businesses within-the residential precinets- Management Plans The developer shall prepare various management plans that relate to the design, construction and operational phases of the development. These plans are to be prepared by an appropriately qualified person and are to be approved by Council as partofa subsequent application fora Development Permit.priette-anyforther The plans are to provide specific matters detailed in the conditions of this approval. The plans submitted include: o Environmental Management Plan © Public Open Space Management Plan o Sediment and Erosion Control Plan o Flora and Fauna Management Plan o Fire Management Plans o Construction Management Plan (including Traffic Management Plan) o Stormwater Management Plan o Water Quality Management Plan o Acid Sulphate Soils Management Plan. Fees Payable The developer shall pay Council all reasonable costs for the assessment of the management plans and also the costs associated with ensuring the development complies with the requirements of this approval. These costs shall be limited to a maximum of $25,000 including the cost of external consultants should they be required. 2-5 --- «--- Formatted: Bullets and Numbering Formatted: Builets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbertng Formatted: Bullets and Numbering Formatted: Bullets and Numbering See?
Page 49
10.
The further approvals required to allow development to occur shall be subject to the
fees contained in Council's Fees and Charges Schedule.
Residential Design Guidelines
All Dwelling houses and Dwelling units shall be designed and constructed to accord
with the Residential Design Guidelines prepared by PMM Group and stamped
approved. The Residential Design Guidelines shall include the following amendments:-
8.1 Setbacks for dwelling houses (including garage/carport) shall be in accordance
8.2 All buildings (which does not include swimming pools or other structures that do
not present a fire hazard) located on allotments adjoining either private open
space or public open space shall be located in accordance with the setback
requirements contained in the Fire Management Plan except where allotments
are bounded by open space on 2 sides and subject to Council approval this
setback may be reduced.
8-3The-Energy-Efficiency criteria shaltinclude-the- requirement foralldwelling-houses-to- - - - -{ Formatted: Bullets and
have-a-selarhetwater system. Numbering
evision- shat-be-included-+reauiring ith +--- + Formatted: Bullets and
a-Koala-to-exitthe-pool: Numbering
8-68.3Rainwater harvesting provisions shall be included for Forest Cluster Precinct, + - - - | Formatted: Bullets and
including a rainwater tank of 15kL. Numbering
8.6Water saving devices-shal-be-inclided for all dwelling heuses-with-a-maximum-OL + -- - { Formatted: Bullets and
per-minute-restricter en-all_ showers: Numbering
Forest Cluster Precinct
The further development application over the Forest Cluster precinct is to include the
following at a minimum:
9.1. Avegetation survey identifying all significant vegetation that is to be retained and
removed from the site
9.2. Deleted.
9.3. Building design that is consistent with a Queensland vernacular style and
supported by an architectural design report.
9.4, Compliance with the Schedule to the Planning Scheme for Noosa Shire for
Group Housing Developments.
9-6:Germpliance-withth: identiat-euideli - .
Fa-G - > >| Formatted: Bullets and
Numbering
Acoustic Measures
The developer shall provide an acoustic report addressing the acoustic requirements
for those residential lots in proximity to Beckmans Road specifically lots 167-171
inclusive and lots 178-181. Any acoustic measures (mounding, fencing) shall be
located inside the lot boundaries. This report shall be prepared by an appropriately
qualified person(s) and is to be submitted with the application to reconfigure a lot for
stage 7.
Page 50
Community- Management Statement
44-Grer fe housing 4. ti priest Kall bes. Bj. t-te). Comm Hy. Mar 2 FReRt Statens: AH
. " 5 i :
Particularthe-measures- contained in the approval that ensure the protection ofthe
iy OF foal aH — £ thy, py i oH and pr by Li, }.- B areas i fading Storm, at
fot vont
satisfaction-ef- C. it
Fethis-endthe CMS willmok i fie. fg Py t 4} 4 +
this-end. miley p f fevant
Management Plans.
Environmental Covenant
12-Ar-environmental covenantas defined -by-Part6_Division-4A of the-Land-Title-Act-4904,
shall be registered,-in-favour-of Council,-on the-title- of any property of a Group Housing
vate-epen. Thi
Private-op HH
of-th
tHe
Avironmentaleces at
developmenteverth:
Pt REF YeRaAt
2 ingtarea.
PAce-Preeinet a
ite. ntalvat
VIFOREA: ates:
Raltbe-forth. pr tect
Environmental-values-of the-site-mean-the following eavironmental-values:
4244 wef ‘ti . . itat:
42.1.2. the-corrider- habitat connections-and
Flora and Fauna Protection
13. A Flora and Fauna Protection and Management plan shall be prepared for the site. It
shall document how the flora, fauna, habitat and ecological values of the site shall be
protected, enhanced and sustained during the design, construction and operation
phrases of the development. It is to address the findings in the other management
plans including :
13.1. Landscape Management
13.2 Fire Management Plan
13.3. Construction Management Plan
13.4 Public Open Space Management Plan, and
13.5 Community Management Statements.
14.The developer shall comply with the Flora and Fauna Management Plan during design and+ - -
construction of the development. ‘+he-Flera-and-Fauna-Management Plan-shall-be
referan, ip-aryy- FARAH arnagermentstatem +t frye thes Co Jet, iy
F any ty age! sta for tp Hi
36-14.During construction, the boundaries of the Public and Private Open Space areas shall
be clearly marked for the purpose of preventing access into these areas thereby
Protecting the vegetation and habitat values. No unrestrained dogs shall be permitted
on site during construction.
46-15.Within the Public and Private Open Space areas no native vegetation will be cut down,
lopped, damaged, disrupted or adversely affected, without the prior written consent of
Council. Council acknowledges that a sewer line is required in the open space area
and will not unreasonably withhold approval to clear vegetation where such clearing
relates to the location of the sewer line.
*--- 1 Formatted: Bullets and
Numbering
* 7” ~~) Formatted: Bullets and
Numbering
a---
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
“| Formatted: Bullets and ~
Numbering
Formatted: Bullets and
Numbering
a---
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
et eat! a
Page 51
4#16.Vegetation and individual trees retained in the residential precincts and the school site < - - -
shall be healthy and vigorous with an expected life span of at least 50 years. Retained
trees should vary in age and preference should be given to retaining mixed-age stands.
Although they have habitat values, many of the old growth, large eucalyptus trees are
inherently dangerous in urban areas. Therefore a risk assessment by a qualified
arborist shall be undertaken on all individual trees and stands of vegetation to be
tetained. An arborist’s written report shall be included in the Flora and Fauna
Protection and Management Plan. These requirements do not apply to the public open
space areas.
48-17.All underground services, drainage, footpaths, bike paths, roads and other site works < -
shall be located to minimize adverse impacts on retained vegetation, particularly their
root systems.
49-18.Following development of the site, the vegetation in the gullies shall be monitored +---
annually by a suitably qualified person for three (3) years or until such time as
development works are accepted off-maintenance by Council (although Council can at
its own cost conduct monitoring after this time), whichever is the sooner, so as to detect
any adverse effects due to rainwater tanks harvesting water that would normally flow
into the gullies and sustain the vegetation. If adverse effects are evident, appropriate
contingency measures shall be undertaken to rectify the problem/sthe-water-harvesting
Podified-to-overceme the problems-and
Reports of monitoring results and recommendations shall be submitted to Council for
their records.
- ity- Management Statements are-to-address-the-obligations-of-this condition
20:Buildings_reads-and-fences-shall-be-sited-and-constructed-to-allew movementoffauna = + - --
Vegetation Removal and Disposal
24,19. Vegetation removal, tree felling and lopping shall be undertaken in an environmentally « - - -
sensitive manner to avoid damaging surrounding vegetation, trees and habitat.
22-20.Prior to felling or lopping all trees are to be checked for wildlife (e.g. koalas, cockatoos, < - - -
possums). If wildlife species are present, the tree shall not be felled or lopped until the
wildlife has left the tree.
23-21.All cleared vegetation shall be suitably processed or removed from the site by a 7--
method approved by Council.
24-22.Weed species cleared from the site shall not be mulched. Vegetative material from #---
weed species shall be removed from the site and disposed of in a Council approved
refuse tip.
Weed species means:
i. all declared pian species listed under the Rural Lands Protection Act, 1985;
ii. all plant species listed in the Environmental Weeds List published by the
Environmental Protection Agency's and Department of Natural Resources and
Mines’ Southeast Queensland Environmental Weeds Management Group; and
iti. all plant species listed in Noosa Council's Planning Scheme Policy PSP1,
Section 9.0 Undesirable Plants.
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Page 52
26.23 Burning off is not considered an acceptable means of disposable and is not to take *- >> Formatted: Bullets and
place. Numbering
Sea Eagles’ Nest
26:24.No construction work or development activities, with the exception of approved dwelling - - - - Formatted: Bullets and
houses, shall take place within 100 metres of the Sea Eagles’ nest between 1 May and Numbering
31 October of each year.
Koalas and Koala Habitat Protection
2425 .Koalas and their habitat require special protection and particular consideration shall be « - - - -{ Formatted: Bullets and
given to: Numbering
. the protection and enhancement of koala habitat on the site,
. the protection of Koalas during the construction and operation phases of the
development,
. the protection and enhancement of existing and new vegetation to facilitate
Koala movement throughout the entire site, and
. the planting of additional koala food and habitat tree species as part of the
landscaping in the residential precincts and the schoo! site.
28:26.Trees known to have frequented by Koala within residential precincts and the school _« - - - -{ Formatted: Bullets and
site shall be protected, unless specific approval exists for their removal or lopping. Numbering
29-27.Rehabilitation/re-establishment of Koala habitat within the residential precincts and +---- Formatted: Bullets and
school site shall be given priority in the Landscape Management Plan. Numbering
*--~ 7 Formatted: Bullets and
Numbering
3+28.Glossy Black Cockatoos and their habitats require special protection and particular +---+ Formatted: Bullets and
consideration shall be given to: Numbering
344.28.1. the protection and enhancement of Glossy Black Cockatoo habitat ons - - - -{ Formatted: Bullets and
the site; Numbering
342.28.2. the protection of Glossy Black Cockatoos during the construction and « - - - -[ Formatted: Bullets and
operation phases of the development; and Numbering
343.28.3. the planting of additional Glossy Black Cockatoo food and habitat + - - - -{ Formatted: Bullets and
tree species as part of the landscaping in the residential precincts and school Numbering
site.
32:29. Rehabilitation/re-establishment of Glossy Black Cockatoo habitat within the residential « - - - -{ Formatted: Bullets and
Precincts and school site shall be given priority in the Landscape Management Plan. Numbering
Glossy Black Cockatoos
aN. sting. pexe: 2. £ g sf. iz 4p 46-2 e4 4 } huding he. HH S-RESHAG. by are-t be eee Formatted: Bullets and
installed-on-trees. Numbering
Weed and Pest Species Control During the Construction Phase of the
Development
34:30.Prior to entering the site, all construction machinery and vehicles shall be washed downs - - - { Formatted: Bullets and
to remove soil that may contain weed seeds, soil pathogens and pest species. Numbering
Page 53
35.31.All nursery stock shail be weed, pest and disease free and certified as such by the *--~ 4 Formatted: Bullets and
supplier. The certificates are to be obtained prior to the commencement of any Numbering
landscaping works on site and shall be made available to Council upon request.
36.32.All mulch produced on site by mulching cleared vegetation and trees shall specifically + - - - { Formatted: Bullets and
exclude material (particularly seeds) from weed species (e.g. lantana, asparagus and Numbering
umbrella trees).
32.33.Soil disturbance in the Public and Private Open Space areas shall be kept to a +--- 1 Formatted: Bullets and
minimum to avoid weed proliferation. Numbering
38:34.Weed eradication and control will be an integral part of both the Public Open Space + - - - { Formatted: Bullets and
Management Plan and the Landscape Management Plan. Vegetation used in Numbering
rehabilitation and landscaping shall exclude weed species.
Landscape Management Plan
39:35.A Landscape Management Plan shall be prepared for the residential development and « - - - -{ Formatted: Bullets and
the school site. It shall incorporate all the relevant requirement of all management Numbering
plans required by this approval.
40.36. The Landscape Management Plan shall detail the planting schemes for the residential « - - - -( Formatted: Bullets and
Precincts and the school site shall detail, inter alia: Numbering
o site preparation;
© construction materials and details;
o weed control;
o planting scheme;
o erosion and sediment control;
© Planting out procedures and horticultural requirements;
o mulching procedures;
o fertilising procedures;
o irrigation and watering procedures;
o on-going maintenance;
o environmental safeguards;
4437. The Landscape Management Plan shall specifically acknowledge and demonstrate the « - - -
aesthetic values of the site and Lake Doonella will be maintained and enhanced. In Numbering
particular special consideration needs to be given to the integration of roads and
pathways into the landscape setting. Landscaped areas shall be integrated floristically
and structurally with the surrounding native vegetation in the Public and Private-Open
Space Areas.
42:38. The Landscape Management Plan shall be consistent with Planning Scheme Policy No - -- { Formatted: Bullets and
4 —Landscaping Guidelines, and will primarily utilise advanced native species that Numbering
have been recorded on the site.
43-39. The Landscape Management Plan shall address, inter alia, the following issues with — + - - - -{ Formatted: Bullets and
the residential precincts and the school site: Numbering
Page 54
43-4.39.1. enhancement of environmental corridors; Formatted: Bullets and
Numbering
43.2,39.2. enhancement and establishment of fauna habitat, particularly for Formatted: Bullets and
koalas and glossy black cockatoos; Numbering
43-3.39.3. visual screening of buildings and visual integration of built +---- Formatted: Bullets and
environment. Numbering
Fire Management
44-40. Three Fire Management Plans shall be prepared. One for the residential precincts, ones - - - { Formatted: Bullets and
for the school site and once for the Public Open Space area. Numbering
45.41. The Fire Management Plan for the residential precincts and the school site will deal +----+ Formatted: Bullets and
with all matters and issues relating to fire management in urban areas as well as Numbering
bushfire management in the vegetated parts of the residential precincts and the school
site. The Fire Management Plan for the residential precincts shall be referenced in any
community management statement for group housing developments over the site.
46-42. The Fire Management Plans for the residential precincts and the schoo! site shall +---- Formatted: Bullets and
address the following: Numbering
© expected behaviour of fire;
o fire hazard management actions and risk minimisation strategies;
o setback zones, proposed building construction methods, materials and design;
o gutter treatment to avoid the collection of leaves;
© fire hydrant locations;
© access for firefighters;
o landscaping measures to reduce fire risk;
© access between structures and vegetated areas;
o fire suppression and evacuation procedures;
o fuel load management and hazard reduction within vegetated areas;
o fire suppression and evacuation procedures;
© fuel load management and hazard reduction within vegetated areas;
o how the ecological values, habitat values and the visual and amenity values of the
vegetation will be retained/protected;
© required infrastructure — vehicle access tracks, fire breaks, hydrants etc;
© coordination with other relevant organisations and agencies;
© owners and operators training and responsibilities;
o implementation procedures;
-10-
Page 55
47.43.A Bushfire Management Plan for the Public Open Space Area is to be prepared with the recommendations of the Plan being incorporated into the Public Open Space Management Plan. 48-44 The residential precincts and the school site shall be designed to incorporate all the required fire protection measures and devices that are necessary to protect the development from bushfires. 49.45. The Bushfire Management Plan for the Public Open Space area shall address the following: © expected behaviour of bushfires; o fire hazard management actions and risk minimisation strategies; o access for firefighters; o fuel load management; o how ecological values, habitat values and the visual and amenity values of the vegetation will be retained/protected; © required firebreaks, fire trails, access points and fire hydrants, etc; © maintenance requirements for the above infrastructure; © how bushfires will be prevented from spreading into adjacent bushland and residential areas; © coordination with other relevant organisations and agencies; © implementation procedures. 69-46. The fire management plans shall demonstrate a high level of environmental care and responsibility and be consistent with best practice for developments of this type in similar environments. §4.47. The fire management plans shall meet the provisions of the Queensiand Fire and Rescue Authority Act 1990 and shall be endorsed by the Queensland Fire & Rescue Authority. 62-48. The Developer must provide a bushfire information kit to purchasers of allotments on the site. §3-49. The bushfire information kit shall be submitted to Council for approval as part of the Fire Management Plan for the Residential Precincts and School Site. Public Open Space Management Plan 84-50. The Developer in consultation with Council shall prepare a management plan for the Public Open Space areas. The management pian is to address the following: 64-450.1 The primary role of the Public Open Space area which is for conservation and waterways protection. 64-250.2 Vehicle access will be kept to a minimum and limited to fire and emergency vehicles and Council maintenance vehicles. All unnecessary tracks and trails will be closed off and rehabilitated and vehicle access points shall be minimal. *-- > 1 Formatted: Bultets and Numbering *- - > 1 Formatted: Bullets and Numbering * >> > 4 Formatted: Bullets and Numbering * "7" 1 Formatted: Bullets and Numbering * >>> 4 Formatted: Bullets and Numbering +--+ ~*~" Formatted: Bullets and Numbering * 7” > | Formatted: Bullets and Numbering *~-- + Formatted: Bullets and Numbering * >>" Formatted: Bullets and Numbering *-7- 7 4 Formatted: Bullets and Numbering
Page 56
50.3In-general-physical access-to- Lake Doonella and-Cranks-Creek-wil-notbe which-the-t §4.450.3 Playground and picnic facilities, rubbish bins and other facilities associated with recreational parkland are not allowed _except where located in the nominated Neighbourhood Park. 54;550.4 Council's resources with respect to future management and maintenance of this area are limited, therefore the Public Open Space should be designed to be as self-sustaining as possible. 55.51.The Public Open Space Management Plan shall: §6-4+51.1. Include the recommendations of the Bushfire Management Plan for the Public Open Space area. $5-2,51.2. Include the recommendations of the Flora and Fauna Protection Management Plan. 66-3:51.3. Include a walking and cycleway network primarily using sewer easement through the site and possibly other existing tracks and fire trails. §6-4.51.4. Identify weed control, erosion contro! and rehabilitation needs within the area and detail how the necessary works shall be undertaken. §5-5:51.5. Identify lakeside viewing points and document the works required in these areas; 66-6-51.6. Identify all existing access points into the Public Open Space and recommend how these shall be managed. §6-451.7. Determine how the Sea Eagles’ nest tree and the scarred tree shall be protected in the long term. §6-8-51.8. Document the rehabilitation and planting enhancement requirements for the Public Open Space areas adjacent to Beckmans Road. §6.9.51.9. to suffer and their sources and causes, and recommend actions to avoid or minimize these. §6-10-51.10. Document all the works and items that the Developer shall undertake or provide to establish and secure the Public Open Space area prior to its dedication. It is acknowledged the Developer will have no further responsibility (including but not limited to the undertaking of works) after the dedication of the Public Open Space. 86:52.Prior to th e dedication of the Public Open Space, the Developer shail undertake alt works required by the Plan. Private Open Space :53.All private open space precinct areas shall be managed and maintained in accordance with the approved Environmental Management Plan, Landscape Management Plan, Document the likely edge-effects from which the Open Space is likely - - - a--- Formatted: Bullets and Numbering *- > 7-1 Formatted: Tabs: 9.68 cm, Left + Not at 2m oy Formatted: Bullets and Numbering “n 7 Formatted: Bullets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbering . «---4 Formatted: Bullets and Numbering e--- Formatted: Bullets and Numbering | «---4 Formatted: Bullets and Numbering «--- Formatted: Bullets and Numbering #--- Formatted: Bullets and Numbering i e Formatted: Bullets and Numbering wees Formatted: Bullets and Numbering Formatted: Bullets and Numbering @--- Formatted: Bullets and Numbering #--- Formatted: Bullets and Numbering tA eee Formatted: Bullets and Numbering Flora and Fauna Management Plan, Fire Management Plans, Stormwater Management Plan, Water Quality Management Plan. -12-
Page 57
Environment Management Pian
§8.54.An Environmental Management Plan (EMP) for the site to ensure that the impact on thee - - -
environment as a result of the development is minimised and that the environmental
values of the site are protected and enhanced. The EMP is to:
68-4541. comply with AS00014,
§8-2:54.2. demonstrate a high level of environmental care and responsibility
and be consistent with the best practice for developments of this type in similar
environments
§8-3-54.3. detail the developer's environmental policy and the proposed
environmental management system for the sale
§8-4:54.4, specify to the reasonable satisfaction of Council:
§84454.4.1, the performance targets, including those derived from the
conditions and other requirements arising from legislation and other
approvals;
68.4.2:54.4.2. how the performance targets are to be achieved;
§8-4-3:54.4.3. when the performance targets will be satisfied;
68-4-4.54.4.4. how performance will be monitored;
58.4.5.54.4.5. corrective actions and contingency measures to be
undertaken;
68-4-6:54.4.6.
§8-4-454 4.7. auditing arrangements
§8-4.8:54.4.8. how the requirements are to be incorporated into
construction and works contracts;
reporting arrangements
68-4:9-54.4.9. how the developers employees, contractors and the
contractor's employees will be informed and trained with respect to the
environmental protection requirements;
§8-4-40-54.4.10, enforcement; and
68-4-44.54.4.11. _ penalties for non-compliance.
59.55.In particular, but without limitation, the EMP shall address the following issues in
relation to the construction and operational phases of the development:
© legislative compliance;
© soil erosion and sediment control;
eo vegetation protection;
o fauna and fauna habitat protection.
© aquatic ecosystem protection;
o weed and pest control;
-13-
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
a---
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
eee.
Pe
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
eee
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
+ >> > -| Formatted: Bullets and
Numbering
eeee
eee
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numbering
Formatted: Bullets and
Numberng
vec. ad od
Page 58
water quality protection; ground water protection: air quality protection; acid sulphate soil management; storage and handling of hazardous substances: noise and vibration management; waste management; cultural heritage management; visual amenity protection; bushfire control; © environmental emergencies; © community liaison. 60-56. The Developer shall comply with development. eBM all dn-a foranygroup-housing-development overthe-site, the EMP during Sediment and Erosion Control Plan §1:57.Detailed staged Sediment and Erosion Control Plans are to be prepared for the site and shall be prepared to the reasonable satisfaction of Council and in accordance with the institution of Engineers Australia ‘Engineering Guidelines for Queensland Soil and Sediment Contro!’ (June 1996) and in particular using Checklist No.3 from that document. The sediment and erosion control plans shall cover all development on site (during the construction, establishment and operational phases) including rehabilitation and remediation. 62:58. The Sediment and Erosion Control Plans will deal with the staging of the development generally in accordance with WBM’s Report ‘Lensworth Lake Doonella — Provision of further Stormwater and Water Quality Advice — Version 2' of 2/10/02. 63-59. The Sediment and Erosion Control Plans shall also include the Public pen Space area and shall: 63-459. 1. identify existing erosion problems, and 63.2.59.2. Specify appropriate remedial treatments. §460.The residential precincts and the school site shall be designed to incorporate, within their boundaries all the necessary sediment and erosion control devices. Stormwater Management Plan §§-61.A Stormwater Management Plan for the site including revegetation and remediation shall be prepared to the reasonable satisfaction of Council. The Stormwater Management Plan shall be generally in accordance with WBM’s Report of 2/10/02 and as subsequently modified in their letter to Council of 14/11/02. The developer shall comply with the Stormwater Management Plan. -14- * 7-7” 7 Formatted: Bullets and Numbering *-- >" 7 Formatted: Bullets and Numbering * 7-7”) Formatted: Bullets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbering *) Formatted: Bullets and Numbering **— > 7 Formatted: Bullets and Numbering *- 7" ~ 4 Formatted: indent: Left: 1 cm eee
Page 59
* >>> 1 Formatted: Bullets and
FA vt Numbering
82.62. The Stormwater Management Plan shail take into account matters specified in section « - - - (Formatted: Bullets and
19.4 of the Environmental Protection (Water) Policy 1997. Numbering
68-63.Key water quality objectives to be reflected in the Stormwater Management Plan are « - - - -{ Formatted: Bullets and
the protection of aquatic ecosystems in the site gullies, Cranks Creek and the eastern Numbering
creek and within the receiving waters of Lake Doonella and the Noosa River, as well as
primary contact recreational standards within the receiving waters. Appropriate water
quality standards to be adopted are those as specified by Brisbane City Council (in
conjunction with the South East Queensland Regional Water Quality Management
Strategy).
69.64. The Stormwater Management Plan for the site shall address: + ~~~ Formatted: Bullets and
69:+.64.1.___——Construction, establishment and operational phases. enee mre Ballet ana
69-2-64.2. The establishment and operational phases for the project, atleast = +- ~_ Murbering
Formatted: Bullets and
two per year event and three monthly campaign based water quality monitoring Numbering
within the gullies of the site, in the two creeks and in the receiving waters for:
69:2-4.64.2.1. Tota! Nitrogen Formatted: Bullets and
Numbering
69,2-2.64.2.2. Total Phosphorus Formatted: Bullets and
. a Numbering
69.2:3-64.2.3. Suspended Solids & Turbidity Formatted: Bullets and
Numbering
69:2-4.64.2.4. PH
OO Formatted: Bullets and
60:2.6.64.2.5. Salinity Numbering
Formatted: Bullets and
69.2.6.64.2.6. Temperature __ (Aumbering
Formatted: Bullets and
69.2-764.2.7. Dissolved Oxygen Numbering
Formatted: Bullets and
68-28-64 .2.8. Trash & gross pollutants Numbering
. . . Formatted: Bullets and
69.2:9:64.2.9. Algae count and identification Numbering
. Formatted: Bullets and
69-2-40-64.2.10. _ Faecal coliforms Numbering
The developer shall continue monitoring for a period of 3 years from completion of the Formatted: Bullets and
final stage of construction. 9
69.3 For the establishment and operational phases the developer is to undertake
inspections for erosion and deposition, and build up of trash and gross
pollutants, and other water pollution. These inspections will be carried out after
significant rainfall events, and on a three monthly campaign basis for a period of
three years from completion of the final stage of construction.
69.4 For the construction phase at least two per year event and monthly campaign
based water quality monitoring shall be undertaken for:
o Suspended Solids & Turbidity
o Temperature
-18-
Page 60
o Salinity o Trash & gross pollutants o Dissolved Oxygen In addition to the above, inspections for erosion and deposition, and build up of trash and gross pollutants should be carried out on a weekly basis during the construction period and corrective measures implemented. 69.5 An operational phase Water Quality Management Plan shall be prepared to address water treatment device water quality maintenance requirements for stormwater management measures and devices, contingency measures for aquatic plant growth, loss of vegetation in swales and filter strips, pollution response and algal blooms and should include a mosquito management strategy. The plan shall demonstrate compliance with the water quality objectives set and a no worsening over the existing pre-development situation in the site gullies, Cranks Creek, the eastern creek and in Lake Doonella and the Noosa River. 69.6 Responsibilities are to be clearly delineated. 69.7 Non-compliance with prescribed water quality standards should trigger the implementation of measures/further testing to rectify. 69.8 Monthly reports on monitoring, incidents, corrective action and plan updates are required to be submitted to Council. These reports are to be submitted in a form acceptable to Council and are to highlight any non-standard results. 69.9 Any stormwater outlet to the gullies on the site are to be stabilised with appropriate energy dissipation and local armouring. Regular monitoring of creek erosion is required with appropriate corrective action specified to ensure a stable creek system, All work to be undertaken to minimise impacts on the Environmental Values of the creek system. 70:65.The residential precincts and the secondary school precinct shall be designed to tree incorporate, within their boundaries, all the necessary stormwater and water quality control devices associated with the development. Water Quality 44,66. The Developer is to install water quality control devices generally in accordance with + - - - the Stormwater Management Plan. Detailed staging plans and specifications, based on and generally in accordance with the Plan are to be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works, Drainage #2,67.The Developer is to complete the drainage works progressively in conjunction with treed development of the site and generally in accordance with the approved Stormwater Management Plan. Detailed drainage plans and specifications, based on and generally in accordance with the approved Drainage Plan, the EMP and these Conditions, are to be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works. #3:68.All drainage works as required by the Drainage Plan are to be provided by the t--- developer at its own cost. . Water-Cycle-Management -16- Formatted: Bullets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbering
Page 61
74-Fera year in-which the-rainfalis the median of wetter than average years or the median of- - - - { Formatted: Bullets and
saity the bed i eh i Numbering
recharge} of the-satchments-of the three significant gullies. onthe-site- will not ehange
6 8%-frem-theirp conditientaking4 nsidera olimne
Acid Sulphate Soils Management Plan
75.69.An Acid Sulphate Soils (ASS) Management Plan must be provided for any excavation « - - -
#6-70.The staging of the Lot Reconfiguration for the residential areas will be in accordance « - - - { Formatted: Bullets and
with the Plan titled “Staging Plan” by PMM Group — Reference 4740-57 and dated 21 Numbering
#471. This Preliminary Approval for material change of use of premises and reconfigure a lot < - - -
#8-72.The developer must obtain all of the other Development Permits referred to in the
79:73.Security in the form of a cash bond or trading bank guarantee to the sum of $400,000 + - - - { Formatted: Bullets and
must be submitted, to secure performance of all conditions of this approval, prior to the Numbering
Formatted: Bullets and
works undertaken in areas of the site below 5m AHD. The Management Plan must Numbering
outline all proposed ASS Investigation and management procedures, which are to be
undertaken in accordance with State Planning Policy 2/02 “Planning and Managing
Development Involving Acid Sulphate Soils”.
Staging
January 2003.
Currency
Formatted: Bullets and
lapses if:~ Numbering
#44711. the use or erection of a building or other structure associated with thes - - - { Formatted: Bullets and
use, has not commenced by 6 February 2007, unless application is made and Numbering
approved by “Council for an extension; or
#42.71.2. the use of any premises pursuant to the Preliminary Approval + ---- Formatted: Bullets and
ceases. Numbering
General
*- ~~ 4 Formatted: Bullets and
Decision Notice, prior to obtaining a Development Permit for Building Works. Numbering
issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be reduced to $100,000 upon completion of all construction works
(except building construction) and the balance will be returned-en-satisfactery
ef-enforeing-performance-ofthis-permit following acceptance of development works off-
maintenance by Council:
Plan Sealing and Easements
80.74.For the purpose of these conditions, the following definitions apply:- eee
Numbering
80-4,74.1. A Plan of Survey means the plan for the reconfiguration of a lot a7 -e
required to be endorsed by Council pursuant to S3.7.1 of the Integrated Planning
Act 1997.
Formatted: Bullets and
Numbering
-47-
Page 62
80.2.74.2. A registered Professional Civil Engineer means acivilengineer + - - - -{ Formatted: Bullets and
who is listed under the Institution of Engineers, Australia “National Professional Numbering
Engineers Register 3” (NPER 3) or an engineer who is registered in Queensland
pursuant to the Professional Engineers Act 1988.
80-3.74.3. Car parking area means a parking area as defined in the Schedule + - - - -( Formatted: Bullets and
to the Shire of Noosa Planning Scheme inclusive of manoeuvring areas and Numbering
access from the roadway.
86-4,74.4. The person acting on this permit means any person or company - - - { Formatted: Bullets and
who undertakes development pursuant to this permit. Numbering
80.6-74.5. AS 2890.1 —- 1993 means Australian Standard for Off Street Car +-- - -( Formatted: Bullets and
parking AS 2890.1-1993. Numbering
80.6:74.6. Principal Contractor means the person nominated by the Applicant « - - - { Formatted: Bullets and
and approved by the Manager ~ Land Development at a pre-start meeting as Numbering
being responsible for the major component of works associated with a
Development Pennit for Operational W orks of any works on the site.
8475.Conditions of any Development Permit for a Material Change of Use of premises +-- ~~ Formatted: Bullets and
relevant to each stage of this lot reconfiguration shall be complied with prior to Council Numbering
endorsement of the Plan of Survey.
82.76.The proposed contemporary residential lots shall have a minimum size of 600 m* «-~-- Formatted: Bullets and
Numbering
83.77.In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal + --- (Formatted: Bullete and
documentation shall be presented to Council and shall be submitted in the correct form Numbering
with the fees prescribed in Council's adopted fee schedule.
84.78.Pursuant to Section 3.7.3(c) of the Integrated Planning Act, all outstanding rates and « - - - { Formatted: Bullets and
charges due and payable to Noosa Council in respect of the lots being reconfigure shall Numbering
be paid prior to endorsement of the Plan of Survey for each stage.
86-79.Easements will be required over any publicly owned services that traverse private land « - - - -{ Formatted: Bullets and
in conjunction with the sealing of Survey Plans for each Stage. Numbering
86:80.Prior to Council endorsement of the Plan of Survey, a duly executed copy of any +--+ Formatted: Bullets and
required Grant of Easement shall be submitted to Council for perusal. Numbering
Any changes required by Council's Solicitor shall be attended to prior to endorsing the
Plan of Survey.
Any necessary Titles Office forms requiring the consent of Council is to be submitted
prior to the endorsing of the Plan of Survey.
87,81.Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give +---~- Formatted: Bullets and
Council's Solicitor an appropriate undertaking in writing that in conjunction with Numbering
lodgement of the Plan of Survey at the Land Titles Office, the Title Deed and the
easement documents will also be lodged and any additional Titles Office forms or
requisitions requiring the consent of Council being attended to forthwith.
vi
88.82.All easements require on downstream properties draining the site either by way of *--~ 4 Formatted: Bullets and
underground drainage or overland flowpaths shall be obtained and proof of registration Numbering
of the easements shall be submitted with the Survey Plan.
BON by Heng, +f thy strut ture. allt, acs ty 1ste¢d f- CACO boveran. nh. Bt ARY @--4 Formatted: Bullets and
building-orstructure-within proximity-of an-easement-or Gouncils-or-any otherpublic Numbering
utility’s-underground-infrastructure-must have-its foundations-designed-so-thatnoe
such_undergroundinrastructure—Feundations
+18-
Page 63
must betaken- dewn 2 minimum ef 4m below a line ofinfluence-measuredtm-in-the
designed-by-a-registered.practicing- Geotechnical Engineerand submitted-with-any
‘ation f D 2 for Building VA :
96-83.Prior to endorsement of the Plan of Survey for each Stage, a State Survey Mark shail + - - - { Formatted: Bullets and
be provided within the Stage. It shall be levelled and iocated to the requirements of the Numbering
Manager — Land Development. A ‘Form 6' shall be submitted for Council's records.
Each State or other Permanent Survey Mark shall be installed clear of overhead
vegetation, making it suitable for Global Positioning Equipment, and accurately
connected to at least one real property corner by a registered Surveyor.
91.1 Prior to the issue of further approvals on the site, the developer shall pay to Council a
contribution toward the cost of upgrading the intersection of the new road and
Beckmans Road (this contribution is $64,075, at December 2002, which will be
adjusted by CPI current at the date of payment) and contribute toward the major road
network in the coastal region, in accordance with Council's Braft-Coastal Major Road
Network Infrastructure Charges Plan dated March 2002 at the rate current at the date
of payment. This-willbe-inthe-form-of an-infrastructure-agreement between the
develeperand Gouncil.
the intersection-and- Beckmans Read-requiring-upgrading priorto-Couneil's-planned
canstruction-date-of these works, in-requiring the developer to-undertake the necessary
*-- 7 4 Formatted: Bullets and
Numbering
Dedications
92. The open space area shall be dedicated to the Crown prior to the sealing of the first
completed Stage in the Staging Plan of the development. The public open space will
be in the condition required by the Open Space Management Plan.
Headworks
93. For the residential component, contributions shall be paid to Council in accordance with
Planning Scheme Policies PSP 28 and PSP 30 on Water Supply Headworks
Contributions and Sewerage Headworks Contributions respectively and at the rates
applicable at the time of payment.
An estimate only of the contribution rates as of December 2002 under the current
policies is as follows:-
Water Supply $749,171
Sewage $592,025
TOTAL $1,341,196
Headworks contributions shall be paid prior to Council endorsement of the Plan of
Survey for each Stage of the reconfiguration. Each additional a lot shall be assessed
as a dwelling house and each group title dwelling as being a dwelling unit (3 Bed).
94. For the Secondary School site, headworks will be calculated in accordance with
Planning Scheme Policies PSP 28 and PSP 30 on Water Supply Headworks
Contributions and Sewage Headworks Contributions respectively, and required in the
-419-
Page 64
95. 96. 97. 98. 99. 100. 101. assessment of an application for the Material Change in Use and payable prior to any Operational Works Approvals. Roads All roads shall be constructed generally in accordance with the layout indicated on Plan of Development prepared by PMM, Drawing 4740-56b dated 21 January 2003 (as amended by condition 2) and the conditions contained in this preliminary approval. All new roads will be required to comply with Council requirements for carriage widths. The road design may not be strictly in accordance with Council's Engineering Standards but this is because the required incorporation of swales, vegetation retention and pedestrian/bikeway paths and will be to the satisfaction of Council. There will be the capacity for an eastern road link to Swanboume Way through the adjacent property. The access to the new school should be converted to one point, which is an arm ona four-leg roundabout on the new road. This roundabout will also service the contemporary parcels on the east of the development and the layout will be modified on the Plan of Development to accommodate this change. Council may consider a separated egress point from the school site is Australian Standards requirements for sight distance and a traffic loads analysis indicates that roundabout 4 on Eraland Consulting Pty Ltd Drawing No. 01691-100 dated April 2003 have enough capacity to cater for the increase in traffic generated by this modification. The developer will also be required to undertake the necessary modifications to the existing school's access and car parking in accordance with Eppell Olsen & Partners Drawing No. 3866-003 Issue A dated October 2002. The developer will have to construct the new road on an alignment that allows the school access to be constructed in accordance with this plan and will also construct the modified car park and access at the existing school. Discussion is to be held with Queensland Education about detailed design and programming of construction. Access to each lot shail be constructed to the standards and requirements of the Council. The following frontage works shall be constructed across all road frontages within the site:- 101.1.Construction of new kerb and channel; 101.2.Vehicular access to each lot; 101.3.Associated stormwater drainage, generally in accordance with WBM's Report of 2/10/02 and as subsequently modified in their letter to Council of 14/11/02.; 101.4.New stormwater management to correct the current problem of stormwater discharge from the road reserve to the Noosa Primary School; 101.5.Hot mix correction to existing pavement as required; 101.6.Concrete bikeways/footpaths. The Developer is advised to contact Council to obtain the footpath alignment. 101.7.The remaining footpath area shall be formed, topsoiled and turfed, and planted with trees. A Development Permit for Operational Works shall be obtained prior to undertaking these works.
Page 65
102. Alterations to lot sizes, number of lots and layout may be required following the issue of a Development Permit for Operational Works in respect of the internal roadworks design. Bikeways/Pedestrian Paths 103. The developer will construct a bikeway link from the existing path already servicing the Noosa Primary School to the bicycle storage facilities to be included in the proposed secondary school. This bikeway shall be constructed to the satisfaction of Council. 104. The developer will construct a path along the Beckmans Road frontage of existing Lot 7. The Beckmans Road and new road bikeways should be constructed as indicated on Eppell Olsen & Partners Drawing No 3966-003 Issue A dated October 2002. The bikeway on the Beckmans Road frontage may need to be aligned within the open space area but any alignment would require vegetation retention. 105. The developer will construct a pedestrian/bikeway linkage in the vicinity of proposed Lot 112 to the northern end of Swanbourne Way in the form of a path and timber bridge 2 metres wide. 106. Internally (that is the area of the development north of Plan 3866-003) the bikeway network should be as indicated on Plan 6812-39 by PMM Group dated 13/02/03. The pedestrian and bikeway paths indicated in the open space on the plan will need to have their alignment and need agreed to in the Open Space Management Pian. 107. The developer will also construct a bikeway within the site that allows connection to the new road linkage, through the parcel to the east, to Swanboume Way required by this permit. 108. The developer will be required to pay a contribution towards the construction of the bikeway link to the Lake Entrance Boulevard Network. The amount of the contribution shall be $200 per additional lot adjusted for changes to CPI since September 2000. Sewer 109. A Sewerage Reticulation Master Plan is to be submitted for Council approval prior to the issue of any further permits. 110. Design for a sewerage system to connect all new lots within the site to Council's existing sewerage reticulation system shall be to the standards and requirements set out in Council's Engineering Design Standards. If the design requires the construction of a pump station and a rising main, the connection point to Council's existing system will be nominated by the Manager —Land Development. 111. Detailed design drawing and calculations shall be submitted with an application for a Development Permit for Operational Works in respect of water or sewer works. To avoid conflict with other underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. 112. All connections to sewer system shall be carried out either by Council or by a Council approved Contractor and at no cost to Council. Any connection to a water main shall be undertaken by Council. Water 113. AWater Supply Master Plan is to be submitted for Council approval prior to the issue of any further permits. -21-
Page 66
114. 115. 116. 117. 118. 119. 120. 121. 122. 123. 124. 125. Each water connection to the water reticulation system shall extend to the property boundary and be metered. All fees for the supply of water meters shall be paid to the Council. An application for Development Permit for Operational Works for services shall be obtained prior to commencement of works. A reticulated water supply system shall be provided to connect to Council's existing systems, including a metered water connection to the property boundary or each Proposed new lot within the site. Fire hydrants are to be provided throughout the development in accordance with Council and Queensland Fire Service standards. Provision shall to be made in all parks locations for a water connection and should conform to the recommendations of the Bushfire management Plans. Under road service conduits shall be provided to ensure a connection is available. Power, Telecommunications and Street Lighting Any alterations of a public utility of other facility necessitated by the development of the land or associated construction works either internal or external to the site shall be at no cost to Council. All lots to be connected to underground power and telecommunications. An underground electricity service shall be provided to each lot if not already provided. in this regard an approved ENERGEX Electrical Design Consultant shall work in conjunction with Councils Manager — Works Support to prepare detailed designs of the electrical proposal. The detailed designs shall then be submitted to ENERGEX for approval and a copy of their approval submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design consultant) prior to Council endorsing the Plan of Survey. Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at the applicant's expense and shall not entail a financial encumbrance on future purchasers of the proposed lots. Street lighting and pathway lighting throughout the subdivision shail be provided in accordance with council’s Engineering Design Standards, section 11.3.3 and to the satisfaction of Council. The requirements for TELECOMMUNICATION services shall be satisfied in relation to any existing services that currently traverse the site and for the provision of new telephone services to the proposed lots. In this regard written confirmation from an approved telecommunication agency shall be submitted to the Council prior to Council endorsing the Plan or Survey. Engineering Works Designs A Suitably qualified Registered Professional Engineer, specialising in hydraulics shall prepare engineering drawings and specifications for stormwater designs and shall be submitted in conjunction with an application for a Development Permit for Operational Works. Alt designs for engineering works involving the construction of pavements, kerb and channel, vehicular access, footpaths, turnouts, stormwater drainage, water supply or -22-
Page 67
126. 127. 128. 129. 130. 131. sewerage reticulation shall be prepared generally in accordance with the requirements of Council’s Engineering Design Standards, shall reference where applicable to Council's Standard Drawings and shall incorporate best engineering practice. A Suitably qualified Registered Professional Engineer shail prepare engineering drawings and specifications for all engineering works, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. Prior to Council endorsing a Plan of Survey, a certificate from a registered Professional Civil Engineer shail be submitted to Council for each Development Permit for Operational Works issued pursuant to this permit. The engineer shall certify that he has supervised those works and that they have been completed in a workman like manner in accordance with that permit. As constructed drawings certified by a registered surveyor showing the extent and finished levels of the filling works are to be submitted for Council's records. These drawings must fully detail levels for all engineering works including water supply and sewer reticulation, drainage structures, building floor levels, finished ground levels, effluent trenches and pavement surface levels. Drawings shall be on transparencies, a hard copy highlighting any changes from design and in electronic format on an IBM PC compatible floppy disk in a format capable of integration with Council's computer system. Approval of works shall not be granted until as constructed drawings have been supplied. General The following steps shall be undertaken prior to commencement of any construction:- 129.1 The Principal Contractor shall give Council's Inspector seven (7) days notice of intention to commence works. 129.2 The Principal Contractor or any of his subcontractors shall not undertake any works unless each contractor has public liability insurance in the sum of $10,000,000 and copies of current public liability insurance policies are submitted to Council's Inspector. 129.3 The Principal Contractor shall nominate a site representative and give a telephone number that can reach the site representative at any time during a 24- hour day. 129.4 The site representative shall arrange to meet on-site with Council's Inspector to obtain Council's requirements for construction of access. 129.5 All signage, including that for safety during construction, shall be in accordance wit the Manual of Uniform Traffic Control Devices and Department of Transport (Main Roads division) Roadworks Signing Guide. Prior to excavating any material to be used for fill on this site, a Development Permit for Operational Works shail have been obtained for the site from which the excavated material is taken. A soil report shall be submitted with the application certifying that the material is free of acid sulphate soils and other deleterious materials. The transportation of all materials to and from the site shall be undertaken in a manner such that no particulate matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. =23-
Page 68
132. 133. 131. 132. 133. 134. A program of works is to be submitted with any application for any Development Permit for Operational W orks detailing the construction schedule and proposed environmental protection measures. Where the program is changed for any reason whatsoever, a copy of the revised program shall be submitted to Council's Works Inspector within seven (7) days. For the following classes of work associated with development, a Development Permit for Operational W orks must be obtained prior to commencement of works relating to that class of work. The application may combine any or all of these classes of work:- 133.1 Site Civil Works 133.2 Roadworks 133.3 Stormwater Drainage 133.4 Frontage works 133.5 Sewer reticulation including new mains, relocations, diversions, pump stations and rising mains 133.6 Water reticulation 133.7 Site Filling 133.8 Excavation of materials to fill another site 133.9 Landscaping. Operational works shall be carried out in a manner that prevents :- 131.1.Pollution of a waterway 131.2.Dust/sand nuisance to residents in the vicinity 131.3, Transfer of dirt and debris onto a public road 131.4,Excessive notice (less that 1.5 Dba above ambient measured at the lot boundaries) 131.5.Excessive traffic delays (less than 5 minute delays) 131.6. Diminution of neighbourhood amenity (long term parking of employees vehicles, parking of construction equipment etc.) A traffic management plan shall be submitted in conjunction with a Development Permit for Operational Works involving road or drainage works. The plan shall address all phases of construction to be undertaken on site. Where operational works are likely to effect nearby residents and the Noosa Primary School, at least 3 days notice of commencement of work, the name of the site supervisor and a 24 hour contact telephone number shalt be distributed to affected results. Earthworks shall be generally contained within existing and proposed road reserves. Where earthworks are required for the provision of services, existing contours shall be restored. -24-
Page 69
135. Fill imported to the site may only be from a site licences with The Environmental Protection Agency or from a site for which a Development Permit for Operational Works has been issued approving the export of fill. 136. A registered practising Geotechnical Engineer shall test the existing ground conditions for suitability of placing additional fill, prior to such fill being placed. Filling works shall be restricted to the development area itself, and the finished fill levels are to taper to the existing levels prior to the rear boundary of the development area. Batters shall be at a maximum grade of 1:4 unless retained by a wall. Any existing fill or natural materials on the site or with the extent of approved works to the site which do not satisfy the manager — Land Developments or a geotechnical Engineer's requirements shall be removed and replaced with suitable material. 137. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A. A registered practising Geotechnical Engineer shall supervise all the placement of fill and shall certify that all lots have been compacted to the required standard. Any existing fill on the site that does not comply with Council's requirements shall be removed at the direction of the Manager — Land Development prior to additional filling works commencing. 138. Following completion of the filling works and prior to endorsement of the Plan of Survey, the registered practicing Geotechnical Engineer supervising the works shall submit compaction tests across the entire filled areas and a site classification shail be shown on a metes and bounds survey plan. An appropriate property notation shall be placed on Council's rates records to advise prospective purchasers of lots that have been filled that special foundations requirements will apply. 139. Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining properties to the reasonable satisfaction of the Manager —- Land Development. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. 140. The stormwater discharge from the site shall be designed such that there is no net increase in the rate of discharge as a result of the development for storm events up to 100 year ARI. 141. Tabulated hydrologic and hydraulic calculations that demonstrate the adequacy or otherwise of the existing site stormwater drainage system shall be submitted in conjunction with a Development Permit for Operational Works. Such calculations shail include any remedial measures necessary to rectify defects in the existing system. Where proposed site damage is to be connected to the existing system the calculations shall clearly demonstrate the adequacy of the existing drainage network to accept the additional stormwater flows. 142. Stormwater drainage shall include measures to protect proposed allotments from run- off from or to surrounding land. The design shall also address controls for gross pollutants, nutrient runoff, oil and grease, and salt and sediment. Underground stormwater shall be designed in accordable with Noosa Council Engineering Design Standards, and shall be connected, where possible to Council's existing drainage systems. An easement of minimum width 4.0 metres shail be granted in favour of Council over any stormwater pipes that traverse private property. -25-
Page 70
143. 144. 145. 146. 147, 148. Designs that concentrate stormwater onto adjoining land shail require separate formal approval from the owner of the land or relevant Government Authority. Such approval shall be submitted with the design in conjunction with an application for a Development Permit for Operational Works. The design plans detailing surface levels, which shall be controlled across the site of the development to create a major storm event overland flow path system to cater for the 1:100 year design storm, shall be submitted in conjunction with the Development Permit for Operational Works. Any overland flow from external catchments shall be accepted and incorporated in the major event surface flow drainage system through the site. Overland flows shall be discharged in a safe manner and the product of velocity time depth shall not exceed 0.4m’/sec. The design plans are to show how stormwater runoff within and from the site is to be controlled both during construction and permanently. The plans are to indicate measures to be taken to prevent erosion and the export of sediment from the site and will embrace the principals set out in the Institution of Engineers Australia Engineering Guidelines for Queensland Soil Erosion and Sediment Control, June 1996. Designs shall also incorporate the principal of “no net increase” in nutrients and other pollutants from the developed site. This may require the provision of a drainage system that allows first flush (first 12mm of rainfall) to be collected and treated prior to release into the drainage system. An easement for drainage in favour of Council shall be created over the full length and width of major storm event surface flow paths within the site at no cost to Council. A dealing number for registration of the easement shall be obtained from the Land Titles Office before occupation of the site. Minimum floor level freeboard of 0.5 m shall be provided for habitable and storage areas above the top water level of the stormwater overland flows. Details of any proposed estate entrance signage shall be submitted in conjunction with an application for a Development Permit for Operational Works for either roadwork’s or landscaping. A $1500 fee shall accompany the application, The design shall conform to Councils "Signage Policy ~ Development Estate Entrance”. The proposed names of new roads (public and private) and parks shall be lodged with the application for a Development Permit for Operational Works. 148.1.Names are to be selected from any of the following categories:- 148.2.Easily pronounced words of Murri Languages. 148.3.Names or words of local significance or historical interest. 148.4. Flora, fauna, industry, topographical, geological’ and similar’ features and terms relative to the district. 148.5.Sumames of persons of merit or historical significance. (Personal names should be avoided), 148.6. Approval will not be given to a name that is the same or similar to the name of another road in the Shire, or of a road in close proximity in a neighbouring Shire. Names that are not easily pronounced, or may cause confusion to emergency services are to be avoided. 148.7.All street signs on new roads (public and private) and parks shall be erected prior to works being accepted on maintenance. +26 -
Page 71
149. 150. 151. The person acting on this permit shall apply and obtain for all other necessary permits including crane permits, road opening permits, hoarding permits, footpath occupation permits and/or any other approvals required under any other Act. Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant shall sign a written undertaking to be responsible for the full coast of repairs to road pavement, footpath, kerb and gutter or any other Council property damaged as a result of construction of proposed development. if any person acting under this permit damages any Council property or facilities (such as underground drainage, water supply and sewerage), through any cause whatsoever in the course of directly or indirectly carrying out development, that person shall forthwith notify manager ~ Land Development and shall forthwith rectify that damage at its cost and to the satisfaction of the Manager — Land Development. Alternatively, the applicant may request the Council to carry out the rectification works. Any damage to water main shall be reflected by Council. Any damage to sewer main shall be undertaken by either Council or a Council approved contractor. In all cases, Council reserves the right to carry out rectification works in an emergency and where no reasonable attempt has been made to complete the rectification works as part of the development. All cost incurred by Council in any rectification works shall be repaid to Council prior to the endorsement of the Plan of Survey. Portable Long Service Leave Prior to the issue of a Development Permit for Operational Work, the applicant shall comply with the requirements of the Building and Construction Industry (Portable Long Service Leave) Act 1991. In this regard, a statutory declaration outlining the cost building and construction works, as defined $73.(1) of the Act, shall be submitted in conjunction with an application for Operational Works. If payment of the levy is required, the approved forms as outlined in s77.(1), must also be sighted by the assessment manger. -27-
Page 72
Development Permit to Reconfigure a Lot For the purpose of these conditions, the following definitions apply:- 1.1. APlan of Survey means the plan for the reconfiguration of a lot required to be endorsed by Council pursuant to $3.7.1 of the Integrated Planning Act 1997. 1.2, Aregistered Professional Civil Engineer means a civil engineer who is listed under the Institution of Engineers, Australia “National Professional Engineers Register 3° (NPER 3) or an engineer who is registered in Queensland pursuant to the Professional Engineers Act 1988. 1.3. The person acting on this permit means any person or company who undertakes development pursuant to this permit. 1.4. Principal Contractor means the person nominated by the Applicant and approved by the Manager - Land Development at a pre-start meeting as being responsible for the major component of works associated with a Development Permit for Operational Works of any works on the site. The lot reconfiguration shall be in accordance with plan 6812-28A dated 02-04-03 as submitted by PMM Group except as modified herein. Pursuant to Section 3.5.21(6) of the Integrated Planning Act, the currency period is four (4) years from the day this permit takes effect during which time all conditions must have been complied with, operational works completed, and the Plan of Survey lodged with the Council for endorsement. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal documentation shall be presented to Council and shall be submitted in the correct form with the fees prescribed in Council’s adopted fee schedule. Pursuant to Section 3.7.3(c) of the Integrated Planning Act, all outstanding rates and charges due and payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to endorsement of the Plan of Survey for each stage. Plan Sealing and Easements If all works required by this permit are not completed at the time of submission of a survey plan, Council may accept submission of a security bond to cover the cost of these uncompleted works. This bond would remain with Council until the works are completed. Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required Grant of Easement shall be submitted to Council for perusal. Any changes required by Council's solicitor shall be attended to prior to endorsing the Pian of Survey. Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to the endorsing of the Plan of Survey. Prior to Council endorsement of the Plan of Survey, the Developer's Solicitor shall give Council's Solicitor an appropriate undertaking in writing that in conjunction with lodgement of the Plan of Survey at the Land Titles Office, the Title Deed and the easement documents will also be lodged and any additional Titles Office forms or requisitions requiring the consent of Council being attended to forthwith. -28-
Page 73
10. 11. 12. 13. 14, 15. All easements required on downstream properties draining the site either by way of underground drainage or overland flowpaths shall be obtained and proof of registration of the easements shall be submitted with the Plan of Survey. No building or other structure shall be constructed or encroach over an easement. Any building or structure within proximity of an easement or Council's or any other public utility's underground infrastructure must have its foundations designed so that no surcharge loads are imposed upon such underground infrastructure. Foundations must be taken down a minimum of im below a line of influence measured 1m in the direction of the foundation from the centreline of the closest underground service and along the natural angle of repose of the foundation soil type(s). Plans, and supportive documents, detailing these proposed foundations shall be designed by a registered practising Geotechnical Engineer and submitted with any application for any Development Permit for Building Works. Registered easements are to be provided on the Plan of Survey over all sewage mains within private property. Easements are to be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment. Easements are to be provided parallel to and centred over the water main, with a minimum width of 3.0 metres. Registered easements are to be provided on the Plan of Survey over all water mains within private property. Easements are to be equivalent in width to twice the depth to invert level of the water main at the deepest point within the allotment, Easements are to be provided parallel to and centred over the water main, with a minimum width of 3.0 metres. Prior to endorsement of the Plan of Survey, a State Survey Mark shall be provided within the site. It shall be levelled and located to the requirements of the Manager — Land Development. A “Form 6” shall be submitted for Council's records. Each State or other Permanent Survey Mark shall be installed clear of overhead vegetation, making it suitable for Global Positioning Equipment, and accurately connected to at least one real property corner by a registered surveyor. Engineering Works Prior to undertaking any excavation, the person acting on this permit shall contact public utility service providers to ascertain the location of their underground services. For the following classes of work associated with development, a Development Permit for Operational W orks must be obtained prior to commencement of works relating to that class of work. The application may combine any or all of these classes of work:- 15.1. Site Civil Works 15.2, Roadworks 15.3. Stormwater Drainage 15.4. Frontage Works 15.5. Sewer reticulation including new mains, relocations, diversions, pump stations and rising mains 15.6. Water reticulation -29-
Page 74
16. 17. 18. 19. 20. 21. 22. 23. 15.7. Site filling 15.8. Excavation of materials to fill another site 15.9. Landscaping The person acting on this permit shall apply and obtain for all other necessary permits including crane permits, road opening permits, hoarding permits, footpath occupation permits and/or any other approvals required under any other Act. Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath, kerb and gutter, or other Council property damaged as a result of construction of the proposed development. \f any person acting under this permit damages any Council property or facilities (such as underground drainage, water supply and sewage), through any cause whatsoever in the course of, directly or indirectly carrying out development, that person shall forthwith notify the Manager — Land Development and shall forthwith rectify that damage at its cost and to the satisfaction of the Manager — Land Development. Alternatively, the Applicant may request the Council to carry out the rectification works. Any damage to a water main shall be rectified by Council. Any damage to a sewer shall be undertaken by either Council or a Council approved contractor. In all cases, Council reserves the right to carry out rectification works in an emergency and where no reasonable attempt has been made to complete the rectification works as part of the development. All costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement of the Plan of Survey. A suitably qualified Register Professional Engineer, specialising in hydraulics shall prepare engineering drawings and specifications for stormwater designs and shall be submitted in conjunction with an application for a Development Permit for Operational Works. All designs for engineering works involving the construction of pavements, kerb and channel, vehicular access, footpaths, turnouts, stormwater drainage, water supply or sewerage reticulation shall be prepared generally in accordance with the requirements of Council's Engineering Design Standards, shall reference where applicable to Council's Standard Drawings and shall incorporate best engineering practice. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works, which shal! be submitted in conjunction with an application for a Development Permit for Operational Works. Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining properties to the reasonable satisfaction of the Manager — Land Development. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regards to the drainage scheme. The stormwater discharge from the site shall be designed such that there is no net increase in the rate of discharge as a result of the development for storm events up to 100 year ARI at the receiving waters. Tabulated hydrologic and hydraulic calculations that demonstrate the adequacy or otherwise of the existing site stormwater drainage system shail be submitted in - 30 -
Page 75
24, 25. 26. 27. 28. 29. 30. conjunction with a Development Permit for Operational Works. Such calculations shall include any remedial measures necessary to rectify the defects in the existing system. Where proposed site drainage is to be connected to the existing system, the calculations shalt clearly demonstrate the adequacy of the existing drainage network to accept the additional stormwater flows. The design plans detailing surface levels, which shall be controlled across the site of the development to create a major storm event overland flow path system to cater for the 1:100 year design storm, shall be submitted in conjunction with a Development Permit for Operational Works. Any overland flow from external catchments shall be accepted and incorporated in the major event surface flow drainage system through the site. Overland flows shail be discharged in a safe manner and the product of velocity time depth shall not exceed 0.4m?/sec. The design plans are to show how stormwater runoff within and from the site is to be controlled both during construction and permanently. The plans are to indicate measures to be taken to prevent erosion and the export of sediment from the site and will embrace the principles set out in the Institution of Engineers Australia Engineering Guidelines for Queensland Soil Erosion and Sediment Control, June 1996. Designs shall also incorporate the principle of “no net increase" in nutrients and other pollutants from the developed site. This may require the provision of a drainage system that allows first flush (first 12mm of rainfall) to be collected and treated prior to release into the downstream drainage system. All site drainage shall be by means of gravity systems. A minimum floor level freeboard of 0.5m shall be provided for habitable and storage areas above the top water level of the stormwater overland flows. The following steps shall be undertaken prior to commencement of any construction:- 28.1 The Principat Contractor shall given Council's Inspector seven (7) days' notice of intention to commencement works. 28.2 The Principal Contractor or any of his subcontractors shall not undertake any works unless each contractor has public liability in the sum of $10,000,000 and copies of current public liability insurance policies are submitted to Council's inspector. 28.3 The Principal Contractor shall nominate a site representative and give a telephone number that can reach the site representative at any time during a 24- hour day. 28.4 The site representative shall arrange to meet on-site with Council's inspector to obtain Council's requirements for construction access. 28.5 All signage, including that for safety during construction, shall be in accordance with the Manual of Uniform Traffic Control Devices and Department of Transport (Main Roads Division) Roadworks Signing Guide. Prior to excavating any material to be used for fill on this site, a Development Permit for Operational Works shall have been obtained for the site from which the excavated material is taken. A soil report shall be submitted with the application certifying that the material is free of acid sulphate soils and other deleterious materials. The transportation of all materials to and from the site shall be undertaken in a manner such that no particulate matter scapes onto a public road. All vehicles carrying -31-
Page 76
materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. 31. A programme of works is to be submitted with any application for any Development Permit for Operational Works detailing the construction schedule and proposed environmental protection measures. Where the program is changed for any reason whatsoever, a copy of the revised Program shail be submitted to Council's Works inspector within seven (7) days. 32. Operational Works shall be carried out in a manner that prevents:- 32.1. Pollution of a waterway 32.2. Dust/sand nuisance to residents in the vicinity 32.3. Transfer of dirt and debris onto a public road 32.4. Excessive noise (less than 1.5 Oba above ambient measured at the lot boundaries) 32.5. Excessive traffic delays (less than 5 minute delays) 32.6. Diminution of neighbourhood amenity (long term parking of employees vehicles, Parking of construction equipment etc.) 33, A traffic management plan shall be submitted in conjunction with a Development Permit for Operational Works involving road or drainage works. 34. Where operational works are likely to affect nearby residents or the Primary School, at least 3 days notice of commencement of work, the name of the site supervisor, and a 24 hour contact telephone number shall be distributed to affected residents. 35. Prior to Council endorsing a Plan of Survey, a certificate from a registered Professional Civil Engineer shall be submitted to Council for each Development Permit for Operational Works issued pursuant to this permit. The engineer shall certify that he has supervised those works and that they have been completed in a workman like manner in accordance with good engineering practice and in accordance with that permit. 36. As constructed drawings certified by a registered surveyor showing the extent and finished levels of the filling works are to be submitted for Council's records. These drawings must fully detail levels for all engineering works including water supply and sewer reticulation, drainage structures, building floor levels, finished ground levels effluent trenches and pavement surface levels. Drawings shall be on transparencies, a hard copy highlighting any changes from design and in electronic format on an IBM PC compatible floppy disk in a format capable of integration with Council's computer system. Approvai of works shall not be granted until as constructed drawings have been supplied. Roads 37. The new access road to the lots shall be constructed to the standards and requirements of Council from the Beckmans Road intersection. These works will include any necessary upgrade of the intersection. -32-
Page 77
38. 39. 40. Where kerb and channel is constructed at a road intersection or any other place providing access to a disabled area, a disabled access ramp to Council’s standard drawing shall be incorporated. The developer will also be required to undertake the necessary modifications to the existing school’s access and car parking in accordance with Eppell Olsen and Partners Drawing No. 3866-003 issue A dated October 2002. The developer will have to construct the new road on an alignment that allows the school access to be constructed in accordance with this plan and will also construct the modified car park and access at the existing school. Discussion is to be held with Queensland Education about detailed design and programming of construction. The foliowing frontage works on the new road shall be constructed:- 40.1. Construction of new kerb and channel; 40.2. Vehicular access to each lot; 40.3. Bitumen pavement widening where required; 40.4. Associated stormwater drainage, generally in accordance with WBM's Report of 2/12/02 and as subsequently modified in their letter to Council of 14/11/02; 40.5. New stormwater management to correct the current problem of stormwater discharge from the road reserve to the Noosa Primary School; 40.6. Hot mix correction to existing pavement as required; 40.7. Aconcrete footpath. The developer is advised to contact Council to obtain the footpath alignment. Footpaths are generally straight/ meandering. 40.8. The remaining footpath area shall be formed, topsoiled and turfed, and planted with trees. A Development Permit for Operational Works shall be obtained prior to undertaking these works. Earthworks 41. 42. 43. Earthworks shall be generally contained within existing and proposed road reserves. Where earthworks are required for the provision of services, existing contours shall be restored. Fill imported to the site may only be from a site licensed with The Environmental Protection Agency or from a site for which a Development Permit for Operational W orks has been issued approving the export of fill. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test 8A. A registered practicing Geotechnical Engineer shall supervise all the placement of fill and shall certify that all lots have been compacted to the required standard. Any existing fill on the site that does not comply with Council's requirements shall be removed at the direction of the Manager —- Land Development prior to additional filling works commencing. -33-
Page 78
Water and Sewer 44, 45. 46. 47. 48. 49, 50. 51. 52. 53. The site shall be connected to Council's Water Supply and Sewage reticulation systems to the Water and Sewage Design Guidelines and the requirements of the Manager — Land Development, a no cost to Council. Both of the parcels connections shall be in accordance with approved Master Plans for sewer and Water. Each water connection to the water reticulation system shall extend to the property boundary and be metered. All fees for the supply of water meters shall be paid to the Council. A Development Permit for Operational Works for services shall be obtained prior to commencement of works. A reticulated water supply system shall be provided to connect to Council's existing systems, including a metered water connection to the property boundary of each proposed new lot within the site. Fire hydrants are to be provided throughout the development in accordance with Council and Queensland Fire Service standards. Design for a sewage system to connect all new jots within the site to Council’s existing sewage reticulation system shall be to the standards and requirements set out in Council's Engineering Design Standards. If the design requires the construction of a pump station and rising main, the connection point to Council's existing system will be nominated by the Manager — Land Development. Detailed design drawings and calculations shall be submitted with an application for a Development Permit for Operational Works in respect of water or sewer works. To avoid conflict with other underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. All connections to sewer system shall be carried our either by Council or by a Council approved contractor and at no cost to Council. Any connection to a water main shall be undertaken by Council. Conduits and kerb markers shall be installed for all necessary service crossings of roads to Councils satisfaction. An “As constructed” plan showing the locations of the conduits shall be submitted to Council prior to acceptance of the works “On Maintenance”. Subsoil drains shall be used to ensure pits, manholes or other structures do not dam trenches. Management Plans 54. In accordance with the Preliminary Approval conditions of this decision notice, the developer will submit the following Management Plans for the area of the works required by this permit with any application for Operational Works: o Environmental Management Plan o Landscape Management Plan o Sediment and Erosion Control Plan o Flora and Fauna Management Plan -34-
Page 79
55. 56. 87. 58. 59. o Fire Management Plan o Construction Management Plan o Stormwater Management Plan o Water Quality Management Plan o Acid Sulfate Soils Management Plan A Stormwater Management Plan for the site including revegetation and remediation shall be prepared to the reasonable satisfaction of Council and submitted with any operational works. The Stormwater Management Plan shall be generally in accordance with WBM's Report of 2/10/02 and as subsequently modified in their letter to Council of 14/11/02. All suitable native vegetation shall be retained. Details of retained vegetation shall be submitted with any application for a Development Permit for Operational Works. Existing vegetation on the site shall be retained except where removal is required to enable construction of the approved roadworks, and services or as otherwise approved under any Development Permit for Operational Works. Clearing will only be approved in road reserves. Prior to the ‘Pre Start’ meeting, a site inspection is to be carried out with relevant Council officers, the Principal Contractor's site representative and the Contractor's Supervising Engineer after road centrelines have been established, and before any clearing. This inspection is to define the limits of clearing for this development. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- 58.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres between edges of heaps. 58.2. Disposal for firewood. 58.3. Disposal for landscaping purposes. 58.4. Transport to alternative site for breaking down materials provided that all necessary permits have been obtained to allow the alternate site to be used for this purpose. This disposal method for clearing works is to be submitted in conjunction with an application for a Development Permit for Operational Work. The Applicant is advised that other methods may be considered provided full details of the method are submitted. The developer is also advised that burning off is an unacceptable method of disposal. Prior to landscaping being accepted on maintenance, a certificate from a qualified landscape architect or qualified horticultultural shall be submitted certifying that the landscaping works required by this permit have been carried out in accordance with the -35-
Page 80
60. 61. 62. 63. 64, approved plans and conditions and in accordance with best industry practice under their supervision. General Prior to commencement of any operational works arising out of this permit, security in the sum of $70,000 must be lodged with Noosa Council, to secure performance of all conditions of this permit. The security shall be in the form of cash or unconditional trading bank guarantee acceptable to the Manager ~ Land Development. The security will be returned upon satisfactory performance of all the conditions of this permit and any other related development permits for operational works, less any costs incurred by Council in ensuring compliance with these conditions or for any additional inspections incurred for substandard work or work undertaken not in accordance with this permit. To protect the environment against siltation/sediment export or soil erosion as a result of this development, an erosion and sediment control plan shall be submitted in conjunction with any Development Permit for Operational Works. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, may be necessary. All physical site control measures shall be installed and maintained until all Operational works have been completed and accepted on maintenance. The erosion and sediment control plan must be adhered to at all times. Any alteration of a public utility or other facilities necessitated by the development of the land or associated construction works either internal or external to the site shall be at no cost to Council. The proposed names of new roads (public and private) and parks shall be lodged with the application for a Development Permit for Operational Works. Names are to be selected from any of the following categories:- 63.1. Easily pronounced words of Murri languages. 63.2. Names or words of local significance or historical interest. 63.3. Flora, fauna, industry, topographical, geological and similar features and terms relative to the district. 63.4. Sumames of persons of merit or historical significance. (Personal names should be avoided.) Approval will not be given to a name that is the same or similar to the name of another road in the Shire, or of a road in close proximity in a neighbouring Shire. Names that are not easily pronounced, or may cause confusion to emergency services are to be avoided. All street signs on new roads (public and private) and parks shall be erected prior to works being accepted on maintenance. Should Council require further assessment of a technical report submitted in support of this application, the applicant may first seek the report's author to provide such further assessment. Should Council still require an independent assessment of that technical report, the Applicant shall pay all Council's reasonable costs associated with that assessment within 28 days of invoice or prior to endorsement of the Plan of Survey whichever first occurs. -36-
Page 81
65. 66. 67. 68. 69. Prior to Council engaging a consultant, quotations will be obtained in accordance with Council's Purchasing Policy and the Applicant will be advised of the amount of the quotation. Power, Telecommunications and Street Lighting All lots to be connected to underground power and telecommunications. An underground electricity service shall be provided to each lot if not already provided. In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with Council's Manager — Works Support to prepare detailed designs of the electrical proposal. The detailed designs shalt then be submitted to ENERGEX for approval and a copy of their approval submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions’ (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of Survey. Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at the applicant's expense and shall not entail a financial encumbrance on future purchasers of the proposed lots. Street lighting and pathway lighting throughout the subdivision shall be provided in accordance with Council's Engineering Design Standards, section 11.3.3 and to the satisfaction of Council. The requirements for TELECOMMUNICATION services shall be satisfied in relation to any existing services that currently traverse the site and for the provision of new telephone services to the proposed lots. In this regard written confirmation from an approved telecommunication agency shall be submitted to the Council prior to Council endorsing the Plan of Survey. Portable Long Service Leave Prior to the issue of a Development Permit for Operational Works, the applicant shall comply with the requirements of the Building and Construction Industry (Portable Long Service Leave) Act 1991. In this regard, a statutory declaration outlining the cost of building and construction works, as defined in s73.(1) of the Act, shall be submitted in Conjunction with an application for Operational Works. If payment of the levy is required, the approved forms as outlined in s77.(1), must also be sighted by the assessment manager. -37-
Page 82
RESIDENTIAL DESIGN GUIDELINES VISION STATEMENT To develop Stockland Doonella Noosa into a high quality lifestyle environment_and,the design-of homes-anc-associaled landscaping wiltroquire-anovatie anc contemporary The-objective-ef the developmentis-te set the benchmark for sustainable estate development in urbanised areas. VISION-SFATEMENT The: site represents one. oF the last undeveloped parcels: inurban Noose of any To achieve-the-principles-outlined-above;the control of development and the resultant built form is central to > achieving these-goals-putforward-in-the initial development applicatenthis vision Vegetation and water retention, coupled with-@ high. jevel of design quality. provide for. an -mind, building-sites-have-beerteeated. trees, providing-opportunity-for integration of the-built form-with the-natural environment. STOCKLAND DOONELLA ESTATE AUGUST 2006 v5.0 RESIDENTIAL DESIGN GUIDELINES
Page 83
OVERVIEW The Design Codes have been drafted in a manner that show Performance Criteria — elements that must be addressed and satisfied in the design of your home and landscape, and Acceptable Solutions (deemed to comply criteria) — ways in which these could be achieved. Solutions other than those stated may and will exist. Any departure however form the state acceptable solutions must be fully justified to Council. Innovation in design is strongly encouraged to achieve low impact dwelling design, diverse styles, and unique living environments. DESIGN REVIEW BOARD (DRB) In order to achieve the developer's vision for Doonella Noosa, a Design Review Board (DRB) has been created to review house designs prior to any application being made to Noosa--Shire—the Sunshine Coast Regional Council. The board will review designs promptly and will consider applications in a clear and efficient manner. Stockland will appoint and maintain the Design Review Board. he-main—aim-of-the Desien-Review-B . : i , " you-in-preparing-house plans that-achieve-the-performance-eriteria: LEGISLATION \ All care has been taken to ensure that the Council-Residential-_Design Guidelines and Stockland _Coverants-comply with current building legislation. Any development must ensure compliance with all statutory requirements as they relate to the construction of your home including the Integrated Planning Act, Noosa Shire Town Plan, or the Building Act. Development of a detached dwelling on ‘Conservation’ and ‘Premium’ residential lots will be subject to code assessment, which will require an application to Noosa-the Sunshine Coast Regional Council. This application will be assessed against the Geunci Residential_Design Guidelines, as well as elements of the approved EMP for the development and any relevant conditions in the estate approval. The Code assessment path is stipulated under the integrated Planning Act 1997, and allows Council to ensure compliance with any original approvals and impose conditions accordingly STOCKLAND DOONELLA ESTATE AUGUST 2006 v5.0 RESIDENTIAL DESIGN GUIDELINES
Page 84
PROVISIONS Rain Water Harvesting PI Dwellings must integrate with the water management practices developed for the site, contribute positively to the quality, and reduce the quantity of stormwater run off from individua! allotments Al. All houses shall be fitted with a rainwater collection and reuse system. This system will be appropriately designed such that runoff from all major roof areas is collected and delivered to a rainwater tank of at least the following capacity for a given precinct. « Contemporary Residential 10kL + Conservation and Premium Residential 15kL + Forest Cluster Precinct Group Housing 15kL AND A1.2 Water collected in the tanks will be suitable for all non-potable (non drinking water) uses in the house and garden. These tanks must be fitted with a pressure pump with collected rainwater plumbed into the house to supply appropriate uses, including: « Garden watering; + Toilet flushing; + Hot water supply (optional), and + Washing machine use (optional) AND A1.3 Rainwater tanks should not be visible from the street unless integrated into the architectural form of the dwelling. Moulded plastic tanks shall Ret-be-visible-from-the-street—Such-tanks-shaltbe located to the rear of dwellings, located underground, or suitably screened. AND A1.4 The rainwater tank must be fitted with an appropriate float switch or equivalent system, such that it can be supplemented as required from potable supply. This float switch is to ensure that there is always at least 10% capacity maintained in the rainwater tank. There should be a suitable ‘air gap’ provided between the top water supply level in the tank and the supplement supply to prevent backflow. STOCKLAND DOONELLA ESTATE AUGUST 2006 v5.0 RESIDENTIAL DESIGN GUIDELINES
Page 85
AND Al.5 All roof runoff is to be passed through an appropriate first flush diversion system that will divert the first water collected into focal garden beds; and On all lots proven by geotechnical investigation to be capable of accommodating on-site infiltration (generally those not in the vicinity of Beckmans Road), overflows from the rainwater tanks shall be directed to absorption trenches located, such that they will not affect house footings, foundations, or other such development; and Where no such pit is required, then overflows should be either piped or directed to local lawn or garden bed areas from where they should be allowed to pass from the site onto the adjacent footpath/swale/kerb and gutter. Water Management P2 ~ | Formatted: Bullets and Numbering A341 : ‘ it Shi p ing Poli for Landseaping. A3.2 Plants-that-have-a-propensitte-become-bushtand-weeds-are notice be-used-underany cireumstances STOCKLAND DOONELLA ESTATE AUGUST 2006 v5.0 RESIDENTIAL DESIGN GUIDELINES
Page 86
Feneing P4 r . , fauna: A44 allow-the free mevementofnath Fire Management P5P2 Bush fire risk is to be minimised through application of the Fire Management principles on key allotments as documented in the Fire Management Plan and approved EMP. The establishment of Fire Protection Zones on residential lots adjacent to Public or Private open space areas is required. A5A2.1 Fire Protection Zones are to comply with Figure 3C Fire Management Areas and Fire Protection Zones (Plan No. 6812-84) and Table 11 (extract from Fire Management Plan, Part 3.2 Residential Precinct Development Guidelines) [See Appendix 1]. Within all Fire Protection Zones: ~ individual large trees (200 mm DBH or greater) may be retained but their crowns should not touch the dwelling or vegetation in the adjacent bushland; ~ all existing understorey shrubs and all vegetation greater than 300 mm in height shall be removed; ~ mowable ground cover plants not exceeding 300 mm in height such as the grasses, sedges and small herbaceous plants are permitted; ~ understorey shrubs and trees shall not be planted, ~ flammable structures and landscaping materials, such as timber fences, timber pergolas, timber decks and timber sleeper walls, are prohibited; ~ non-flammable structures such as paved areas and swimming pools are permitted. A5A2.2 Each residential allotment that includes Private Open Space, or abuts Public or Private Open Space shall provide a 20 - 25 mm water connection and garden tap, located within 2 metres of the Open Space area. Each tap shall have a permanently attached 20 m long garden hose and hose reel. The connection and location of the hose reel must be shown on any house plans. STOCKLAND DOONELLA ESTATE AUGUST 2006 v5.0 RESIDENTIAL DESIGN GUIDELINES
Page 87
ASA2.3 Any application within the estate regardless of who is the assessment manager shall provide a statement of compliance with respect to the requirements of the Fire Management components of the Approved EMP for the site. ASA2.4 All buildings (which does not include swimming pools or other structures that do not present a fire hazard) located on allotments adjoining either private open space or public open space shall be located in accordance with the setback requirements contained in the Fire Management Plan except where allotments are bounded by open space on two (2) sides and subject to Council approval this setback may be reduced. Setbacks P6P3 Dwellings are to be setback from allotment boundaries to ensure acceptable access to dwellings from roadways, avoiding the overshadowing of adjoining allotments and creating a high quality streetscape environment. AGA3.2 All setbacks shall comply with the Standard-Building-RegulationQueensiand Development Code. Slepe PZ Bwellings-are-to-minimise disturbance-of the-tepography-on theirallotments Az Fhe-extentof-cut-orfill on-an allotment is-restricted-to-a-maxiraum of 4.0m. As-sueh, the STOCKLAND DOONELLA ESTATE AUGUST 2006 v5.0 RESIDENTIAL DESIGN GUIDELINES
Page 88
eeated-timber: or eRaturat-stene cooling: -insulationto-all-reefareaste-an-R2.6-standard; -all-dwellings-are-to-incorporate a-com sun-heeds_te-shade-windows: bination-of eave-overhang-(600mm-minimum)-and STOCKLAND DOONELLA ESTATE RESIDENTIAL DESIGN GUIDELINES AUGUST 2006 v5.0 +~- > | Formatted: Bullets and Numbering *«-- 7-7 Formatted: Bullets and Numbering
Page 89
RESIDENTIAL DESIGN GUIDELINES VISION STATEMENT To develop Stockland Doonella Noosa into a high quality lifestyle environment and set the benchmark for sustainable estate development in urbanised areas. The control of development and the resultant built form is central to achieving this vision. OVERVIEW The Design Codes have been drafted in a manner that show Performance Criteria — elements that must be addressed and satisfied in the design of your home and landscape, and Acceptable Solutions (deemed to comply criteria) — ways in which these could be achieved. Solutions other than those stated may and will exist. Any departure however form the state acceptable solutions must be fully justified to Council. Innovation in design is strongly encouraged to achieve low impact dwelling design, diverse styles, and unique living environments. DESIGN REVIEW BOARD (DRB) In order to achieve the developer's vision for Doonella Noosa, a Design Review Board (DRB) has been created to review house designs prior to any application being made to the Sunshine Coast Regional Council. The board will review designs promptly and will consider applications in a clear and efficient manner. Stockland will appoint and maintain the Design Review Board. LEGISLATION All care has been taken to ensure that the Design Guidelines comply with current building legislation. Any development must ensure compliance with all statutory requirements as they relate to the construction of your home including the Integrated Planning Act, Noosa Shire Town Plan, or the Building Act. Development of a detached dwelling on ‘Conservation’ and ’Premium’ residential lots will be subject to code assessment, which will require an application to the Sunshine Coast Regional Council. This application will be assessed against the Design Guidelines, as well as elements of the approved EMP for the development and any relevant conditions in the estate approval. The Code assessment path is stipulated under the /nfegrated Planning Act 1997, and allows Council to ensure compliance with any original approvals and impose conditions accordingly STOCKLAND DOONELLA ESTATE AUGUST 2006 v5.0 RESIDENTIAL DESIGN GUIDELINES
Page 90
PROVISIONS Rain Water Harvesting PI Dwellings must integrate with the water management practices developed for the site, contribute positively to the quality, and reduce the quantity of stormwater run off from individual allotments A1.1 All houses shall be fitted with a rainwater collection and reuse system. This system will be appropriately designed such that runoff from all major roof areas is collected and delivered to a rainwater tank of at least the following capacity for a given precinct. « Contemporary Residential 10kL « Conservation and Premium Residential 15kL + Forest Cluster Precinct Group Housing 15kL AND A1.2 Water collected in the tanks will be suitable for ail non-potable (non drinking water) uses in the house and garden. These tanks must be fitted with a pressure pump with collected rainwater plumbed into the house to supply appropriate uses, including: + Garden watering; + Toilet flushing; + Hot water supply (optional; and « Washing machine use (optional) AND A1.3 Rainwater tanks should not be visible from the street unless integrated into the architectural form of the dwelling. Moulded plastic tanks shall be located to the rear of dwellings, located underground, or suitably screened. AND A1.4 The rainwater tank must be fitted with an appropriate float switch or equivalent system, such that it can be supplemented as required from potable supply. This float switch is to ensure that there is always at least 10% capacity maintained in the rainwater tank. There should be a suitable ’air gap’ provided between the top water supply level in the tank and the supplement supply to prevent backflow. AND STOCKLAND DOONELLA ESTATE AUGUST 2006 v5.0 RESIDENTIAL DESIGN GUIDELINES
Page 91
A1.5 All roof runoff is to be passed through an appropriate first flush diversion system that will divert the first water collected into local garden beds; and On all lots proven by geotechnical investigation to be capable of accommodating on-site infiltration (generally those not in the vicinity of Beckmans Road), overflows from the rainwater tanks shall be directed to absorption trenches located, such that they will not affect house footings, foundations, or other such development; and Where no such pit is required, then overflows should be either piped or directed to local lawn or garden bed areas from where they should be allowed to pass from the site onto the adjacent footpath/swale/kerb and gutter. Fire Management P2 Bush fire risk is to be minimised through application of the Fire Management principles on key allotments as documented in the Fire Management Plan and approved EMP. The establishment of Fire Protection Zones on residential lots adjacent to Public or Private open space areas is required. A2.1 Fire Protection Zones are to comply with Figure 3C Fire Management Areas and Fire Protection Zones (Plan No. 6812-84) and Table 11 (extract from Fire Management Plan, Part 3.2 Residential Precinct Development Guidelines) [See Appendix 1]. Within all Fire Protection Zones: ~ individual large trees (200 mm DBH or greater) may be retained but their crowns should not touch the dwelling or vegetation in the adjacent bushland; ~ all existing understorey shrubs and all vegetation greater than 300 mm in height shall be removed; ~ mowable ground cover plants not exceeding 300 mm in height such as the grasses, sedges and smail herbaceous plants are permitted; ~ understorey shrubs and trees shall not be planted; ~ flammable structures and landscaping materials, such as timber fences, timber pergolas, timber decks and timber sleeper walls, are prohibited; ~ non-flammable structures such as paved areas and swimming pools are permitted. A2.2 Each residential allotment that includes Private Open Space, or abuts Public or Private Open Space shall provide a 20 - 25 mm water connection and garden tap, located within 2 metres of the Open Space area. Each tap shall have a permanently attached 20 m long garden hose and hose reel. The connection and location of the hose reel must be shown on any house plans. A2.3 Any application within the estate regardless of who is the assessment manager shall STOCKLAND DOONELLA ESTATE AUGUST 2006 v5.0 RESIDENTIAL DESIGN GUIDELINES
Page 92
provide a statement of compliance with respect to the requirements of the Fire Management components of the Approved EMP for the site. A2.4 All buildings (which does not include swimming pools or other structures that do not present a fire hazard) located on allotments adjoining either private open space or public open space shall be located in accordance with the setback requirements contained in the Fire Management Plan except where allotments are bounded by open space on two (2) sides and subject to Council approval this setback may be reduced. Setbacks P3 Dwellings are to be setback from allotment boundaries to ensure acceptable access to dwellings from roadways, avoiding the overshadowing of adjoining allotments and creating a high quality streetscape environment. A3.1 All setbacks shall comply with the Queensland Development Code. STOCKLAND DOONELLA ESTATE AUGUST 2006 v5.0 RESIDENTIAL DESIGN GUIDELINES
Page 93
Stockland Development Pty Limited Page 1of 1
ABN 71 000 064 835 Telephone: (02) $035 2070
Level 25 Facsimile: (02) 8988 2070
133 Castlereagh Street DX 121 Sydney
SYDNEY NSW 2000 Stockland Email: [email protected]
Please address all correspondence to: Box 998 GPO Sydney 2001
Remittance Advice
STOCKDEVIP/170908 3/1 15 7 " .
SUNSHINE COAST REGIONAL COUNCIL bey, Date: 17/09/2008
Locked Bag 72 Ny Sr & Vendor No: 00137095
SUNSHINE COAST MC QLD 4560 5%, Payment No: 073552
Ue
“466,
cc Date invoice No. Description Invoice Amount Deductions Amount Paid
26/08/08 | DOONEAUGGS Kellie 7,884.00 7,884.00
A
RECEIVED
06 OCT 2008
Sx - Tewantin
Froat Coyater
Total: $7,884.00
Page 94
Su nshine Coast AND USE SECTION FEES
Regional Council
RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation - §20
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation : 111
APPLICATION FEES
Material Change of Use - Code/Impact
Consistent 521
Inconsistent : 521
Assessment under Superseded Planning Scheme . 521
Modification to a Development Permit Z ST 521
Extension of a Currency Period §21
Operational Works - Landscaping §21
Bldg Work assessable against the Planning Scheme. 521
PRE LODGEMENT REVIEW
Half Hour , . 522
One Hour . §22:
ADVERTISING .
Purchase Advertised Applications 523
JETTIES . . .
Jetty Application Fee - 524
Jetty Bond ‘ , ee 51
. . : (Category 4)
BONDS
' Performance Bond , 51
, : : (Category 9) .
SIGNS :
Registration Fee : . 222
SEARCH FEE . .
Search of Land Use Section file. / 112
‘Liquor Licensing Request OO , . : 113
TOTAL ¢ —7PRy-
NAME: Spocids ard De parr Prpriinn A{u
ADDRESS: PO Beane Zeer
WIRTUVA S75
-FILENO: — 23e;6 nq pate: 7 frofo¥
RECEIPT NO: “US/P¥L Signature of TP Officer: °% Kee
’ AUTHORITY NO:
3 [200% zz az)