446-136. Prior to commencement of work relating to a Development Permit for

Operational Works, the Applicant shail sign a written undertaking to be responsible for
the full cost of repairs to road pavement, footpath, kerb and gutter, or other Council
property damaged as a result of construction of the proposed development.

If any person acting under this permit damages any Council property or facilities
(such as underground drainage, water supply and sewerage) , through any cause
whatsoever in the course of, directly or indirectly carrying out development, that
person shall forthwith notify the Manager - Land Development and shall forthwith
rectify that damage at its cost and to the satisfaction of the Manager - Land
Development. Altematively, the Applicant may request the Council to carry out the
rectification works.

Any damage to a water main shall be rectified by Council. Any damage to a sewer
main shall be undertaken by either Council or a Council approved contractor.

In all cases, Council reserves the right to carry out rectification works in an
emergency and where no reasonable attempt has been made to complete the
rectification works as part of the development.

All costs incurred by Council in any rectification works shall be repaid to Council prior
to the endorsement of the Plan of Survey.

 

2

ADVISORY NOTES “|

The following Advisory Notes are for information purposes only and do not form conditions
of approval:

1,

Approval of this development application will trigger an Infrastructure Charge in
accordance with the Coastal Major Road Network Infrastructure Charges Plan. The
estimated amounts per Stage are as follows:

Stage A - $195,132;
Stage B - $173,912;
Stage C - $158,276; and
Stage D - $12,765.

With regard to Stage D, the future development of the Forest Cluster Precinct will
attract further contributions that will be assessed at the time of the future applications.

These amounts will subject to variations in the Price Index, All Groups Brisbane from
December 2004 until the date of payment. An Infrastructure Charge Notice will be
issued in accordance with Chapter 5 of the Integrated Planning Act 1997. This notice
will require payment of the charge for each Stage prior to the endorsement of the
Plan of Survey for that Stage.

Payment via credit card transaction will not be an acceptable method of payment for
development contributions conditioned in this permit or for infrastructure charge
notices issued separately.

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.