ADG Consulting Pty Ltd
requirement for regular de‐sludging of sedimentation tank/s to suitable area onsite, if available (cost
minimisation).
5.7 Nominated Hold Points
In accordance with Development Approval RAP2020/0020 Condition 22(e), nominated hold points to be
enacted during construction have been proposed to facilitate for certification by the suitably qualified
person experienced with Acid Sulfate Soils, as well as Council Development Engineer to ensure all possible
avenues for continual dewatering below permanent groundwater level, including around pipework
bedding that outlet to waterways, are appropriately sealed. The nominated hold points regarding
dewatering for this project are:
1. Prior to commencement of dewatering/initial pump out
2. At finished excavation level, prior to blinding layer application
3. External to basement service installation trench opening/s prior to backfilling.
The above nominated hold points are subject to confirmation by the consulting engineer, and liaison with
council representatives and the Site Manager.
ADG1290.21 Dewatering Management Plan_Rev1_02.02.22 Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ADG1290.21 Dewatering Management Plan_Rev1_02.02.22.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.