Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Att 1 - Code Assessment

of 25

Page text shows just the words. Original shows the document exactly as it was published.

dwellings on Lot 3 RP884396, Noosa
                                         (a)   makes provision for affordable
Heads, dwellings are provided to         and social housing;
meet the needs of different
households.                              (a)   provides social
                                               housing that is
                                               distributed across the
                                               development site;
                                         (b)   provides 2 in every 10
                                               dwellings as affordable
                                               housing;
                                         (c)   provides 1 in every 10
                                               dwellings as social housing.


                                         Editor’s Note -
                                         Affordable housing is housing
                                         that is appropriate to the needs of
                                         households with low to moderate
                                         incomes, if the members of the
                                         households will spend no more
                                         than 30% of gross income on
                                         housing costs.

                                         Social housing is housing made up of
                                         public and community housing, that
                                         is owned and run by the government
                                         or a not for profitagency (as the
                                         provider) for people on low incomes
                                         or with special needs.

Earthworks and Drainage
 Performance Outcomes                    Acceptable Outcomes                    Comment
 Earthworks and Drainage
PO22                                     AO22                                   To comply
Filling and excavation for               Filling and excavation for
operational works do not                 operational works is designed and
directly, indirectly or cumulatively     constructed to ensure overland flow
cause adverse impacts external           and/or flooding is not worsened,
to thedevelopment site by:               impeded, or otherwise diverted to
(a)    causing ponding of water on       adversely affect otherproperties or
       the site or nearby land;          downstream environments.
(b)    increasing flooding, which
       adversely affects the safety or
       useof any land upstream or
       downstream; or
(c)    adversely affecting the
       flow of water in any
       overland flowpath.
Log in to download the original file

Att 1 - Code Assessment.pdf · 598 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.