Council archive · source document
Decision Notice - 010.2008.00000022.001 [As Published] · 132008.22
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 8
Contribution Required For: Amount:
PSP20 – Pathway Trunk Network Contributions $682
TOTAL Contribution Amount = $682
Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
from December 2007 until the date of payment.
All contributions must be paid prior to the commencement of the use.
General
22. Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
23. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
24. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@58032df3\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000022.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 38 KB (small file)
- File type
No other editions are linked here.