7    Noise & odour management
7.1 Responsibility
     The Project Manager is responsible for ensuring the appropriate management of noise and odour during
     dewatering operations.
7.2 Operational policy
     To minimise noise and odour emissions generated from the site during dewatering.
7.3 Performance criteria
     The appropriate criteria to measure the performance of dewatering management at the site are provided
     below.
     1.    No noise or odour related complaints received from neighbouring residents or the community.
     2.    No degradation of air quality due to fumes or odours emanating from the dewatering process.
7.4 Implementation strategy
     Noise and odour emissions will be managed as described in the following sections.
7.4.1 Noise
     All dewatering equipment must be operated appropriately and maintained in good working order. All
     dewatering systems and plant must be fitted with the appropriate noise reduction equipment to comply
     with the performance criteria. Non-complying dewatering plant will be replaced or repaired as necessary.
7.4.2 Odour
     All dewatering plant must be fitted with the appropriate emission reduction devices. Where practicable,
     all dewatering plant will be sealed to prevent the release of odours to the atmosphere. Fine mist odour
     control sprays will be applied to reduce offensive odours if complaints are received from neighbouring
     residents.
7.5 Monitoring
     An inspection of the site and dewatering equipment shall be undertaken daily by the Site Manager to
     identify the following:


          −    Excessive noise being generated by the dewatering systems and plant; and
          −    Strong or offensive odours being generated by the dewatering equipment and/or extracted
               groundwater.
7.6 Reporting
     Reporting will be undertaken as described in Section 6.7 of this report.
7.7 Contingencies
     If noise levels consistently exceed the performance criteria, temporary acoustic barriers will be
     constructed around the offending dewatering systems and plant. Odour control sprays will be applied as
     necessary to mask odour emissions if complaints are received from neighbouring residents. This may
     include the direct injection of deodorisers to the groundwater treatment system.




ADG1290.21 Dewatering Management Plan_Rev0_12.10.21                                                   Page 16

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

ADG Dewatering Management Plan.pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.