Skip to the record
Every meeting, every word.

Council archive · source document

ADG Dewatering Management Plan · OPW21/0315

of 33

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Cone of depression

DER requires a preliminary assessment of the radial extent of the cone of depression and
pumping rates and times for all dewatering operations in ASS areas.

Empirical methods to calculate the radial extent of the groundwater cone of depression and
pumping rates and times for dewatering operations are outlined in Appendix E of 8

Treatment and management of soils and water in acid sulfate soil landscapes 1.59 MB

(Published July 2011, Revised June 2015)

Calculator

Input

Length of excavation | 26
(metres):

Width of excavation | 22
(metres): -
Required groundwater 42
drawdown (metres):
Saturated thickness of
the unconfined
aquifer’ (metres):
Hydraulic conductivity |

of the aquifer (K) 0.000949
(metres per second):

1 46

| Calculate |

Results

Effective radius of
pumping well , Re
(metres):

Radius of influence of
dewatering, R.
(metres):

(i.e. radius of the cone
of depression)

Total pumping rate
(litres per second):
Time taken to establish
the cone of depression
(hours):

m/sec

13m

53m

12l/sec

25hrs

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

ADG Dewatering Management Plan.pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.