ADG Dewatering Management Plan · OPW21/0315
Plans and drawings: the text below has words only, no drawings.
ADG Consulting Pty Ltd
3 Previous investigations
This DMP is based on site specific information sourced from the following, provided to ADG by Chris Clout
Designs:
− Preliminary Geotechnical Investigation, Proposed Residence 33 Wyuna Drive, Noosaville. 2020.
Douglas Partners Pty Ltd. Ref: 95120.00.R.001.
A brief discussion of relevant soil and groundwater conditions is provided below.
3.1 Douglas Partners Pty Ltd 2020
A preliminary Geotechnical Investigation was undertaken at the site in September 2020 by Douglas
Partners Pty Ltd (Douglas).
3.1.1 Soils
A total of one (1) borehole (BH1) was drilled on the proposed development footprint to 6.0 m below
ground level (bgl).
The subsurface profile encountered is generally described as loose to medium dense brown, orange-
brown grey sand fill to 2.35 m depth. Underlaying the fill layer were natural sands starting with a relative
density of medium dense grey silty sand to 3.3 m depth, then a layer of medium dense, dense to very
dense grey sands to 4.9 m depth. A layer of very dense (indurated) dark brown silty sand was encountered
until the termination depth of 6.0 m.
As part of the Preliminary Geotechnical Investigation (2020), Acid Sulfate Soil (ASS) samples were
collected at 0.25m intervals in BH1 to 4.0 m depth. A total of sixteen (16) samples were collected for ASS
screening and four (4) samples were selected for further analysis by the Chromium Reducible Sulfur suite
(CRS).
ADG notes that the testing was limited to one borehole and with ASS testing to 4.0 m depth and DP
reports that within this depth profile both the existing sand fill and natural silty sand are considered to
be acidic. However only the natural sands are considered to contain PASS. The PASS is not likely attributed
to sulfides, but rather naturally occurring acidity commonly found in non-ASS soils.
3.1.2 Groundwater
During drilling activities for the Preliminary Geotechnical Investigation, groundwater seepage/inflow was
encountered at 2.35 m depth below the ground surface (unknown elevation relative to m AHD) (Douglas
Partners, 2020).
3.2 Groundwater quality
ADG is of the opinion that localised monitoring well data can often be misleading and does not always
accurately represent the properties of the groundwater that will be extracted and treated from the entire
site and local surrounds during dewatering. Therefore, based on numerous groundwater investigations
and dewatering monitoring projects that have been undertaken by ADG throughout the Sunshine/Noosa
Coast Region in recent years, our understanding of the groundwater quality in the region is provided
below:
− Groundwater is generally mildly acidic to neutral, with pH levels ranging from approximately 5.5
to 6.5 and electrical conductivity ranging from brackish to saline between 2,000 µS/cm to
48,000 µS/cm. Groundwater pH has the potential to reduce (become more acidic) following
oxidisation of PASS as dewatering progresses, particularly if re-wetting of the soils occurs.
− Dissolved oxygen levels in static groundwater typically range from approximately 35 – 40 %
saturation.
ADG1290.21 Dewatering Management Plan_Rev0_12.10.21 Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ADG Dewatering Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.