2019-11-12 S&O Agenda - Item 8 - Attachment 1 - Draft Cooroy Sports Complex Master Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4. Consultation
Engagement Program Overview
A targeted community and stakeholder engagement program was implemented to inform the development of
this master plan for Cooroy Sports Complex. Stakeholder groups engaged as a part of the master plan
development are shown in the figure below:
Peak Sporting Clubs and Cooroy schools
Other key
Council staff Org's and groups using (adj to
stakeholders
Assoc'ns the Complex complex)
Key Findings
The following key findings emerged from the engagement program:
• Overall, participation in the sports located at the Complex is a mix of static and increasing
membership;
• The facilities generally require upgrades in response to their age and condition and in order to
provide for changes in sport participation and facility provision trends;
• Council has strong policy on environmental sustainability which the clubs support, but the facilities
do not all comply; and
• Most clubs have invested in the formation of development/ expansion/ improvement plans for their
sport and facilities.
Detailed findings
Facility Overview
Council advice on broader planning; potential and/ or unmet community demands, broader regional impacts
and specific issues for inclusion in the development of the master plan, is summarised below:
• Broader trail network planning and access to the Complex via this network is important to retain and
possibly emphasise; there are toilets/ showers missing along the trail and there could be
consideration of trail users using amenities at the Complex.
• The Council’s ZEN (Zero Emissions Noosa) strategy/ actions should apply at the Complex, specifically
actions to reduce emissions. Use of energy, water, sustainable building design and drainage
improvements will enhance the sustainability of the Complex and assist in supporting the financial
viability of user groups, as many of these measures can result in reduced operating costs;
• Council is working with Queensland Building and Construction Compliance (QBCC) to address a
number of approval issues with buildings/ structures on site; with some requiring inspection and
(possibly) retrospective approvals;
• Council is transitioning all community leases and lessees/ user groups to a consistent arrangement.
The groups at the Complex are operating on 10-year leases/ permits; with the Noosa District Rugby
League holding a lease directly with the State government. The underlying tenure of the properties
that comprise the Complex needs to be rationalised to streamline the leasing arrangements.
• The Complex is impacted by flooding;
• Car parking requires attention, e.g. formalising to manage and reduce encroachment, improve car
parking yield and site safety.
Noosa Council Cooroy Sports Complex Master Plan 2020-2030 Draft Page 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.