Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-11-12 S&O Agenda - Item 8 - Attachment 1 - Draft Cooroy Sports Complex Master Plan

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
8.        Development Staging Plan
Once finalised the master plan will guide the future development of the Cooroy Sports Complex. This section
outlines the proposed staging of development.

 Priority/ Year           Zone                        Works Description
 Short                    All Fields & Ovals          Upgrade playing fields
 Year 1-2                                             • Resow field surface to high-wear turf species
                                                      • Install irrigation, upgrade field drainage to fields and ovals as
                                                      required
                                                      • On Rugby League fields replace fittings (as required) with 150
                                                      lux LED lights
                                                      • On Shared cricket/ football upgrade 5 x 3.05m turf pitches on
                                                      main oval
                                                      • Lighting to 350 lux on main oval and 150 lux on second oval
                                                      • Install sight screens
 Year 2-4                 Gymnastics Centre           Expand centre from current (approx.) 635m2 to 1000m2, with
                                                      minimum ceiling height/ clearance of 8m.
                                                      • Provision for storage of 100m2 with ceiling and door height of 3m
                                                      • Ensure lighting is LED
                                                      • Spectator seating for (max) 200
                                                      • Add solar panels and install water tanks for rainwater collection,
                                                      storage and reuse

                                                      Adjust length of 1 cricket pitch as part of gymnastics expansion
                                                      • Additional/ practice net (3.6m x 27m) on western side (4
                                                      practice nets in total)
                                                      • Provide 3x5m lockable storage shed
 Year 1                   Pony Club                   Pony Club Equipment Store and Stable (16x16m)
 Medium                   Complex wide –              Redevelop
 Year 3 - 4               amenities and               • Rugby League clubhouse
                          change upgrades (x2)        • Cricket/ soccer clubhouse and adjacent amenities

                                                      To all new/ upgraded buildings:
                                                      • Review and upgrade services as required
                                                      • Add solar panels and rainwater collection tanks for reuse
                                                      • Ensure PWD compliance
 Year 4                   Whole complex               • Extend existing pathways for pedestrian access to rugby league
                                                      fields and clubhouse
                                                      • Create safe crossing point between main complex and Pony Club
                                                      area
                                                      • Improve pedestrian safety and access, including potential to
                                                      reduce speed limit

                                                      Signage:
                                                      • Update entrance signage
                                                      • Update site map signage
                                                      • Incorporate internal directional signage within internal road
                                                      network
 Year 4                   Car Club                    • Add solar panels to building roof
                                                      • Drainage improvements around car club building, Cooroy Rag
                                                      and upgraded toilet block
                                                      • Install reinforced grass treatment in high wear/ vehicle entrance
                                                      areas




Noosa Council  Cooroy Sports Complex Master Plan 2020-2030  Draft                                                 Page 37
Log in to download the original file

2019-11-12 S&O Agenda - Item 8 - Attachment 1 - Draft Cooroy Sports Complex Master Plan(PDF, 9MB).pdf · 9.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.