Council archive · source document
Attachment B - Proposal Plans · 51987.2898.03
Attached to the e-mail Change to DA (TPC 1971) - Alt & Adds to Dwelling - 51987.2898.03.
Plans and drawings: the text below has words only, no drawings.
Very large file (15.2 MB): may take a few minutes to open.
cover sheets COPYRIGHT: Drawings remain the Copyright of the Architect: Shaun ROOF DRAINAGE: All downpipes to be located as noted on the
SD 000.00 perspective image G 26.03.19 Lockyer drawings and sizes as scheduled. Allow to connect to in-ground storm
SD 000.01 contents / lists / notes G 26.03.19 water drains with 90mmØ UPVC at 1:100 minimum grade. Allow for
ALL WORKS shall be carried out in accordance with the Building Code I.O.'s at each change of direction and at 6000mm centres.
existing photographs
SD 010.00 site conditions H 26.03.19 of Australia, Australian Standards, Local Council requirements, QDC
SD 010.01 site conditions H 26.03.19 guidelines and all other relevant by laws and authorities. In particular SITE DISCHARGE: All stormwater and sanitary plumbing to be
refer Australian standards: connected to existing council system in accordance with the
town plannig · site preparation A.S. 3798 requirements of the relevant local authority.
SD 010.02 site - town planning A 26.03.19 · concrete construction A.S. 2870
· timber construction and details A.S. 1684.2 WATER LINES: All hot water lines shall be fully insulated. All domestic
town planning
· steelwork AS 4100, AS 1111 and A.S. 1112 hot water to basins, showers and baths to have maximum temperature
SD 010.03 basement - town planning A 26.03.19
SD 010.04 ground - town planning A 26.03.19
. termite protection BCA and A.S. 3660.1 of 50°C. Allow to supply and install tempering valves where required,
SD 010.05 level 01 - town planning A 26.03.19 . artificial lighting & ventilation BCA parts 3.8.4/3.8.5 and A.S. 1680 as nominated in the BCA and relevant standards.
. fire safety BCA part 3.7
sections . smoke alarms BCA part 3.7.2 and A.S. 3786 STAIR AND BALUSTRADES: All stair and balustrades shall comply
SD 010.06 typical sections - town planning A 26.03.19 . glazing BCA part 3.6 and A.S. 1288 and A.S. 2047 with part 3.9 of the BCA. Steps to be provided where fall from dwelling
exceeds 190mm.
reference images APPROVAL: No building work shall be undertaken prior to Building
SD 020.00 form and material H 26.03.19
Approval by a registered Certifier. ALL PRODUCTS: To be installed to manufacturers requirements and
SD 020.01 form and material H 26.03.19
to be in accordance with manufacturers requirements for suitable
material pallet CONSULTANTS: Drawings shall be read in conjunction with engineers exposure levels.
SD 020.02 proposed materials - town planning A 26.03.19 drawings and computations. All structure to Engineers design.
Hydraulic sizing and design to hydraulic engineers requirements. All PROPRIETARY ITEMS: Identification of a proprietary item does not
perspective image drawings to be co-ordinated with consultant documentation prior to necessarily imply exclusive preference for the item so identified, but
SD 050.00 perspective view H 26.03.19 construction. indicates the necessary properties of the item. If alternatives are
SD 050.01 perspective view H 26.03.19
SD 050.02 perspective view H 26.03.19
proposed, submit proposed alternatives and include samples, available
SD 050.03 perspective view H 26.03.19
DIMENSIONS: Do not scale off drawings - use figured dimensions only. technical information, reasons for proposed substitutions and cost.
SD 050.04 perspective view F 26.03.19 Contractor shall verify all dimensions on site prior to construction. Any
SD 050.05 perspective view F 26.03.19 discrepancies or errors shall be referred to architect and client prior to TILES: Expansion joints, walls: 5mm. Floors: 8mm. Fill both with
SD 050.12 perspective view C 26.03.19 installation / manufacture of any works. Confirm levels & RL's on site silicone rubber. Grout for wall: Epoxy based mildew resistant. Grout for
prior to commencement of work. floors: prepared grout to be acid resistant. all wall tiles to have
site plans
fcsubstrate.
SD 100.00 locality plans F 26.03.19
SETOUT: Contractor to confirm exact siting and orientation prior to
SD 100.01 site plan F 26.03.19
construction setout. All building setout and confirmation of setbacks
general construction notes
architectural drawing list
INTERNAL PAINTING: Unless noted otherwise paint system to be
existing plans and height to be carried out by a Licensed Surveyor. No footing, or wall Dulux approved 3 coat system - low sheen finish. Colours to be
SD 180.00 basement floor G 26.03.19 to encroach the title boundary. supplied by Architect during contract and applied as per Dulux's
SD 180.01 ground floor G 26.03.19 recommendations and guidelines.
SD 180.02 first floor C 26.03.19 TERMITE PROTECTION: Termite protection by means of termimesh
s.s. mesh hysical barrier in accordance with A.S. 3660.1/2000 and JOINERY ITEMS SHALL INCLUDE: Manufactured casework items,
floor plans installed in strict accordance with current manufacturers specifications. including: kitchen cabinets and cupboards; bathroom cabinets; robes.
SD 200.00 basement floor H 26.03.19
SD 200.01 ground floor H 26.03.19
SD 200.02 first floor C 26.03.19 STRUCTURAL STEEL: Unless noted otherwise all exposed SANITARY COMPARTMENTS: Provide removable hinges to doors of
structuralsteel, anchor bolts and other attachments shall be hot dip sanitary compartments to comply with BCA 3.8.3.3 and be readily
elevations galvanised. A cold gal painted finish shall be applied to any field removable from outside unless there is a clear space of at least
SD 300.00 east elevation - south F 26.03.19 welding to existing or new steelwork. All steel work cast in concrete 1200mm b/w closet pan within the sanitary compartment and the
SD 300.01 east elevation - north F 26.03.19 footings or slab shall have a bitumen finish applied to full extent of cast nearest part of the doorway.
SD 300.02 elevations F 26.03.19 in concrete steel. Check all dimensions on site prior to fabrication of
steelwork. APPLIANCES & EQUIPMENT: Builder to co-ordinate all appliance and
equipment locations on site and with joiner. installation and final
RETAINING WALLS: All retaining walls to structural engineers details. connection by the contractor.
Provide rubble backfill and agg drainage to all retaining walls. Builder to
provide tanking where required. WEATHERSTRIPS: All external doors to contain weather stripping
(type to be confirmed by Architect prior to manufacture)
SLAB & FOOTINGS: All slabs and footings to structural engineers
details. A polyethylene moisture barrier shall be lapped 200mm and DOCUMENTATION: The contractor shall carry out works in
fully taped under any habitable concrete slab and shall extend 100mm accordance with the signed drawings and schedules and anything
onto the perimeter footing. reasonable inferred, and with the Conditions of Contract, and in
accordance with the directions and to the satisfaction of the Architect,
ARTICULATION JOINTS: Provide articulation joints to comply with whose interpretation of the contract documents shall be final. The
"Cement and Concrete Association Construction Note TN9". drawings and specifications/schedules shall be considered
complementary, and any
EROSION CONTROLS: All building works to comply with local work and/or materials absent from one but present or implied in the
authorities Erosion and sediment control standards. other shall be furnished as if they were present in both.
WATERPROOFING: All wet areas and walls to be waterproofed in FINAL CERTIFICATE: At completion of work, Builder to obtain and
accordance with the BCA 3.8 & AS 3740. Builder to provide certificate supply a Certificate of Classification from a Building Certifier.
of installation and compliance.
POOL: Contractor to confirm heights/depths/steps and
CONCEALMENT OF SERVICES: All services shall be concealed in plumbing/electrical requirements and locations prior to construction
walls or ducts. Where services are exposed they must be confirmed by
the Designer on site prior to installation unless noted otherwise.
LICENSED TRADESPERSONS: All services to be installed by licensed
tradespersons in accordance with local authority and with current
manufacturers specifications.
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV
PROJECT NO 0270
MN
MN
D
E
01.02.19
12.02.19
revised concept issue
revised concept issue
21-23 Webb Road, David and Elena cover sheets SD 000.01 G SCALE 1:1
contents / lists / notes
MN F 14.02.19 revised concept issue Sunshine Beach Russell
DL G 26.03.19 for approvals schematic design
1:1 @ A3
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment B - Proposal Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.