            LANDSCAPE SPECIFICATIONS

            1.0 GENERAL NOTES
                                                                                                · CLEAR & REMOVE ALL NON-ORGANIC, DELETERIOUS & LARGE ORGANIC MATTER SUCH AS
                                                                                                  ROCKS GREATER THAN 40mm DIAMETER, TREE ROOTS, TRUNKS, LIMBS, & STUMPS FROM
                                                                                                  ALL AREAS TO BE LANDSCAPED.
                                                                                                · LANDSCAPE CONTRACTOR TO RE-SPREAD AMELIORATED STOCKPILED TOPSOIL TO PLAN
                                                                                                                                                                                                                                                                               PROPOSED DUPLEXES
            ABBREVIATIONS
                                                                                                  PRESCRIBED PROPOSED CONTOURS & TRACK-IN.
                                                                                                · ENSURE SMOOTH, FLOWING, EVEN GRADES AND POSITIVE DRAINAGE WITH NO PONDING TO
                                                                                                                                                                                                                                                                                     111 & 113 GYMPIE TERRACE, NOOSAVILLE, QLD
            · NC - NOOSA COUNCIL             · A.S. - AUSTRALIAN STANDARDS                        FALL PERCENTAGES SHOWN ON PLAN, 3% (MINIMUM 2%). FINISHED GRADES SHALL BLEND
            · EP - ESTABLISHMENT PERIOD
            · N/A - NOT APPLICABLE
                                             · H.D. - HOT DIPPED · LA - LANDSCAPE ARCHITECT
                                             · O.C. - ON CENTRE · MP - MAINTENANCE PERIOD
                                                                                                  INTO EXISTING GRADES PROVIDING A NATURAL APPEARANCE WITH NO ABRUPT EDGES.
                                                                                                · ENSURE 2% MINIMUM SLOPE AWAY FROM ALL STRUCTURES TO PITS OR SWALES.
                                                                                                                                                                                                                                                                  LANDSCAPE OPERATIONAL WORKS PLANS
            · MRTS - MAIN ROADS TECHNICAL STANDARD                                              · TRIM TOPSOILS FOR GARDENS & TURF AREAS.
            · NATA - NATIONAL ASSOCIATION OF TESTING AUTHORITIES                                                                                                                                                                                                                                                                                                MARCH 2017
            · SUPER - SUPERINTENDENT         · TYP. - TYPICAL                                   2.0 LANDSCAPE CONSTRUCTION
                                                                                                                                                                                  · SPREAD AMELIORATED SITE TOPSOIL OR MRTS 16 IMPORTED ORGANIC TOPSOIL TO A                    3.0 MAINTENANCE
            THE FOLLOWING LANDSCAPE OPERATIONAL WORKS PLAN PACKAGE CONSISTS OF THE                                                                                                  DEPTH OF 300mm OVER PREPARED GARDEN AREAS & TRIM.
                                                                                                IRRIGATION                                                                                                                                                                      · WATERING DURING CONSTRUCTION PERIOD IS THE RESPONSIBILITY OF THE
            FOLLOWING SCHEDULE OF DRAWINGS;                                                                                                                                       · CROWN GARDEN BEDS AT CENTRE, 100mm.
                                                                                                · LIAISE WITH RELEVANT NC AUTHORITIES & OBTAIN ANY APPROVAL AS REQUIRED.                                                                                                          LANDSCAPE CONTRACTOR.
                  LD1   SPECIFICATIONS                                                                                                                                            · MULCH GARDENS WITH LA APPROVED 25mm+ HOOP PINE BARK MULCH 100mm DEEP
                                                                                                · COMPLY WITH GOVERNMENT STANDARDS & CO-ORDINATE WITH OTHER TRADES.                                                                                                             · FROM PRACTICAL COMPLETION A 12 WEEK ESTABLISHMENT / MAINTENANCE PERIOD
                  LD2   DETAILS                                                                                                                                                     SETTLED.
                                                                                                · CHECK LOCATIONS OF PENETRATION/CONDUITS & INSTALL WHERE REQUIRED.                                                                                                               WILL COMMENCE & WATERING DURING THIS PERIOD & ANY SUBSEQUENT PERIODS WILL
                  LD3   SCHEDULES & LEGEND                                                                                                                                        · ALL SUPPLIED TOPSOIL & MULCH TO COMPLY WITH CURRENT A.S. & FREE OF WEEDS, SEEDS
                                                                                                · CONTRACTOR TO PROVIDE QUALIFICATIONS & INSURANCES BEFORE CONSTRUCTION.                                                                                                          BE PAID UPON RECEIPT OF APPROPRIATE EVIDENCE.
                  LP1   LANDSCAPE PLAN                                                                                                                                              (SPECIFICALLY NUTSEDGE), PESTS INCLUDING FIRE ANTS & SOIL BORNE VIRUSES &                   · ALL MAINTENANCE ACTIVITIES AS PER FOLLOWING SCHEDULE;
                                                                                                PROVIDE:                                                                            DISEASES. FURNISH LA WITH CERTIFICATIONS RESPECTIVELY FOR APPROVAL PRIOR TO                        - MAINTAIN WHOLE LANDSCAPE WORKS FOR A 12 WEEK EP FROM PRACTICAL
            ·       THE LANDSCAPE PLANS MUST BE READ IN CONJUNCTION WITH THE OPERATIONAL                                                                                            INSTALLATIONS.
                                                                                                · SUPPLY & INSTALL A NEW:                                                                                                                                                                COMPLETION DATE (I.E. BEGINNING OF 52 'ON-MAINTENANCE').
                    WORKS LANDSCAPING DECISION NOTICE ONCE ISSUED. THIS PLAN HAS BEEN
                                                                                                  ELECTRONIC AUTOMATICALLY CONTROLLED IRRIGATION SYSTEM WITH RAIN SENSOR                                                                                                               - MAINTAIN WHOLE LANDSCAPE WORKS FOR A 40 WEEK MAINTENANCE PERIOD
                    DEVELOPED TO COMPLY WITH THE SUNSHINE COAST COUNCIL PLANNING SCHEME 2014.                                                                                     TREE PLANTING
                                                                                                  INCLUDING ALL REQUIRED VALVES, LINES & APPROPRIATELY SIZED VALVE BOXES, 1 PER                                                                                                          FROM EP FINISH DATE (BALANCE OF 52 WEEK 'ON-MAINTENANCE PERIOD).
                                                                                                  UNIT MINIMUM, AT GROUND LEVEL FLUSH WITH FINISH GRADES, WITHIN GARDENS.         · REFER TO DETAILS (AS APPLICABLE) FOR INFORMATION.
            PRELIMINARIES                                                                                                                                                         · ALL TREES TO BE CERTIFIED THAT THEY COMPLY WITH THIS SPECIFICATION & WITH
                                                                                                · TWELVE MONTH GUARANTEE, MAINTAIN AGAINST FAULTY WORKMANSHIP & MATERIALS FOR                                                                                                   MAINTENANCE REGIME - SCHEDULE
                                                                                                  SYSTEM FROM DATE OF PRACTICAL COMPLETION.                                         AS 2303:2015 TREE STOCK FOR LANDSCAPE USE & 'NATSPEC GUIDE SPECIFYING TREES: A
                (OTHER THAN THOSE INDICATED ON THESE PLANS) & BOUNDARIES. ALL SERVICES &                                                                                            GUIDE TO ASSESSMENT OF TREE QUALITY (2003)'.                                                TASK                   FREQUENCY                             PERFORMANCE INDICATOR
                                                                                                · FOR PRACTICAL COMPLETION ENSURE WHOLE SYSTEM IS OPERATIONAL.
                RELATED INFRASTRUCTURE INCLUDING STREET LIGHTING SHOWN ON THESE PLANS ARE                                                                                           FURNISH LA WITH CERTIFICATION PRIOR TO INSTALLATION.
                                                                                                · PROVIDE CAD 'AS BUILT' DRAWING WHEN APPLYING FOR PRACTICAL COMPLETION CLEARLY                                                                                                                        Weekly: November - February           Maintain turf to present consistent &
                INDICATIVE ONLY.                                                                                                                                                  · ALL TREES TO HAVE A FULL & EVEN CROWN.                                                                             Fortnightly: March - April
                                                                                                  SHOWING MAIN-LINE RUNS & SIZES, VALVE TYPES / STATION NUMBERS / DESIGNED                                                                                                                                                                   vigorous appearance, mow to 30mm
                                                                                                  PRESSURE AT VALVE, HEAD TYPES & LOCATIONS.                                      · INSTALL TREES AT LOCATIONS INDICATED ON THE PLANS, PER NOTES & DETAILS HEREIN.              Mowing                 Monthly: May - August                 high.
            · BEFORE WORK COMMENCES THE SUBCONTRACTOR IS TO ORGANISE A PRE-START MEETING
                                                                                                                                                                                  · MULCH TREE GARDENS WITH MINIMUM 1200mmØ COLLAR OF 25mm+ HOOP PINE MULCH                                            Weekly: November - February
              WITH THE LA TO ESTABLISH SCOPE OF WORKS MANAGEMENT PROCEDURES & CLARIFY ANY
                                                                                                SYSTEM REQUIREMENTS                                                                 100mm DEEP TO AS4454. DO NOT MULCH WITHIN 50mm OF TRUNK / PLANT STEM.                                              Fortnightly: March - April            Maintain turf neatly against any edge &
              ISSUES.
                                                                                                · CO-ORDINATE ON-SITE WITH OTHER TRADES, PROVISION OF ALL CONDUITS &              · EDGE & STAKE TREES PER DETAIL.                                                              Trimming               Monthly: May - August                 around any service or respective cover
            · INSTALL TREE PROTECTION MEASURES AS PER PLANS & DETAIL WHERE REQUIRED.
                                                                                                  PENETRATIONS REQUIRED FOR ACCESS TO ALL AREAS TO BE IRRIGATED.                  · ALL TREES TO BE LOCATED MINIMUM;
            · PRIOR TO COMMENCING CONSTRUCTION WORKS, VERIFY DIMENSIONS, LEVELS & LOCATION                                                                                                                                                                                                             Every 2 weeks October - March.        No weeds or grass taller than
                                                                                                · CONTROL VALVES TO BE HOUSED IN LOCKABLE HEAVY DUTY, GREEN IN COLOUR, PLASTIC           - 1000mm FROM UNDERGROUND SERVICES. SERVICE LOCATIONS TO BE CONFIRMED
              OF SITE SERVICES, REFER ENGINEER'S DRAWINGS GENERALLY.                                                                                                                                                                                                            Spraying / wick wiping Every 4 weeks April - September       plant within 500mm of plants.
                                                                                                  VALVE BOXES WITH ACCESS FOR HAND MAINTENANCE. LOCATE VALVE BOXES IN GARDENS.             ON-SITE BY CONTRACTOR PRIOR TO PIT EXCAVATIONS
            · DIMENSIONS TAKE PRECEDENCE OVER SCALE.
                                                                                                · INSTALL BACKFLOW PREVENTION DEVICE(S) WHERE REQUIRED IN GARDEN WITHIN                  - 1500mm HORIZONTALLY & VERTICALLY FROM SEWER LINES                                                                                                 100mm minimum required depth &/or
            · CONTRACTOR TO REVIEW ALL SCHEDULES HEREIN TO CONFIRM THEIR CORRELATION TO                                                                                                  - 1500mm FROM PROPERTY CONNECTIONS
                                                                                                  LOCKABLE PROTECTIVE MESH FRAME.                                                                                                                                                                                                            mulch adequate to suppress weed
              THESE PLANS. WHERE DISCREPANCIES OCCUR WITHIN LANDSCAPE DOCUMENTATION                                                                                                      - 8m FROM OVERHEAD STREET LIGHTING                                                     Re-mulching
                                                                                                · INSTALL REDUCED PRESSURE ZONE VALVES (NC APPROVED) IN-LINE, DOWNSTREAM OF                                                                                                                             Once during MP & once per year       growth & maintain soil moisture.
              REFER TO LA PRIOR TO PROVISION OF TENDER PRICING &/OR CONSTRUCTION.                                                                                                        - 900mm FROM BACK OF KERB OR IN BETWEEN KERB & FOOTPATH WHERE APPLICABLE
                                                                                                  TAKE-OFF FROM MAIN SERVICE LINE. COORDINATE LOCATIONS WITH SUPER ON-SITE.                                                                                                                            Inspect planting at the start of
                                                                                                · ALL MAINS & ANY PRESSURISED BRANCH TO THE MAINS TO BE CLASS 12 PVC PIPE.                 ALLOWING FOR SERVICE SETBACKS AS PER ABOVE) - OR AS DIMENSIONED ON PLANS                                    spring & assess damaged, dead
            SEDIMENT & EROSION CONTROL                                                                                                                                                   - 3m FROM DRIVEWAY CROSSOVERS, STORMWATER CATCH PITS, POWER POLES, &
                                                                                                · ALL SHRUBS & GROUNDCOVERS TO BE DRIP IRRIGATED (NO POP-UP SPRAYERS). CHECK                                                                                                                           or unhealthy plants. Replant as       To achieve minimum design planting
            · THE LANDSCAPE CONTRACTOR TO IMPLEMENT & MAINTAIN FOR THE CONTRACT DURATION,                                                                                                  FIRE HYDRANTS                                                                                                                                     densities and garden cover
                                                                                                  SYETEM ONCE PER MONTH TO ENSURE ALL EMITTERS ARE FUNCTIONING APPROPRIATELY.                                                                                                   Re-planting            required.
              BEST PRACTICE EROSION & SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE
                                                                                                · IRRIGATION SYSTEM TO HAVE AN AUTOMATIC TIMER / CONTROLLER. LOCATE CONTROLLER           - 600mm FROM CONCRETE PATHS                                                                                                                      Plants exhibit healthy growth & no signs
              MANUAL FOR EROSION & SEDIMENT CONTROL (MAROON MANUAL), GOOD ENVIRONMENTAL                                                                                                                                                                                                                Every 2 or 3 days during EP,
                                                                                                  IN SUITABLE LOCKABLE BOX. INSTALL LAMINATED COPY OF SYSTEM LAYOUT WITHIN BOX.          - 15m FROM PEDESTRIAN ROAD CROSSING - APPROACH SIDE
              PRACTICE & THE CONSULTING CIVIL ENGINEERS SPECIFICATION FOR EROSION & SEDIMENT                                                                                                                                                                                                           weekly during MP, or as required of drought stress
                                                                                                · IRRIGATION SYSTEM TO HAVE A RAIN SENSOR CONNECTED TO CONTROLLER TO ENSURE              - 5m FROM PEDESTRIAN ROAD CROSSING - DEPARTURE SIDE
              CONTROL. PENALTIES & FINES FOR NON-COMPLIANCE WILL APPLY.                                                                                                                                                                                                         Watering               to maintain adequate soil moisture
                                                                                                  SYSTEM DOES NOT OPERATE DURING RAIN PERIODS.                                           - 8m FROM EXTENSION OF PROPERTY BOUNDARIES ON SIDE STREETS
            · INSTALL SILT CONTROL FENCING IN ACCORDANCE WITH SITE ENVIRONMENTAL                                                                                                         - 3.05m FROM ADJOINING, NEW, OR PERPENDICULAR LOT BOUNDARIES                                                  Once during MP or as required
                                                                                                · IRRIGATE PLANTS TO ENSURE ADEQUATE MOISTURE IS MAINTAINED DURING
              MANAGEMENT PLAN & LOCAL AUTHORITY REGULATIONS.                                                                                                                                                                                                                                           where & when plants are not
                                                                                                  ESTABLISHMENT.
            · SEDIMENT & EROSION CONTROL DEVICES TO BE INSTALLED WHERE NECESSARY & AS                                                                                             GENERAL PLANTING                                                                                                     responding to slow release            Plants appear healthy exhibit good rate
                                                                                                · ADJUST SYSTEM POST ESTABLISHMENT SO IT OPERATES DURING DRY & HOT PERIODS SO
              DIRECTED ON SITE BY SUPER.                                                                                                                                          · REFER TO DETAIL(S) HEREIN RESPECTIVELY.
                                                                                                                                                                                                                                                                                Fertilising            fertiliser applied at planting        of growth.
                                                                                                  PLANTS & TURF AREAS ARE ADEQUATELY WATERED TO MAINTAIN HEALTHY & VIBRANT
            · ALL SEDIMENT & EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE                                                                                            · SUPPLY & PLACE PLANTS ACCORDING TO PLANT SCHEDULE, PLANT SETOUT NOTES & PLAN
                                                                                                  CONDITIONS.                                                                                                                                                                                          As required where plants require
              WITH MANUFACTURER'S SPECIFICATIONS.                                                                                                                                   LOCATIONS.                                                                                                         support. Allow to stake 20% of
            · THE CONTRACTOR IS RESPONSIBLE FOR ENSURING SEDIMENT & EROSION CONTROL                                                                                               · WHERE DISCREPANCIES OCCUR ADVISE SUPER PRIOR TO PLANTING.                                                          trees during EP. Allow to stake
                                                                                                LEVELS
              DEVICES ARE INSPECTED & MAINTAINED AS FOLLOWS;                                                                                                                      · ENSURE PLANTS ARE PLACED & PLANTED AT EQUAL CENTRES, STAGGERED, NOT IN ROWS                 Staking                further 20% of trees during MP.       Plants growing in an upright manner.
                                                                                                · SEE PLAN FOR ARCHITECT'S & ENGINEER'S PROPOSED LEVELS.
                   a.) DURING CONSTRUCTION:         - DAILY DURING DRY WEATHER                                                                                                      UNLESS INDICATED ON PLANS.
                                                                                                · VERIFY ALL LEVELS, CONDITIONS, & UTILITY LOCATIONS IN-THE-FIELD INCLUDING ALL                                                                                                 Inspection for storm   Following storm event, heavy
                                                     - PRIOR TO PREDICTED STORM EVENTS                                                                                            · MASS & GROUP PLANTINGS TO BE SPACED EVENLY IN A TRIANGULAR PATTERN TO ACHIEVE
                                                                                                  INVERTS. IF A DISCREPANCY OCCURS NOTIFY SUPER &/OR LA.                                                                                                                                               rainfall or high winds                Any damage noted and rectified
                                                     - TWICE DAILY DURING PROLONGED RAIN                                                                                                                                                                                        damage
                                                                                                · LEVELS TO BE CONFIRMED BY A QUALIFIED/LICENSED SURVEYOR.                          OPTIMUM COVER RELATED TO MATURE PLANT SIZE AND FORM.
                   b.) DURING ESTABLISHMENT PERIOD: - WEEKLY DURING DRY WEATHER                                                                                                   · SHRUBS & SPREADING GROUNDCOVERS TO BE SET BACK A MINIMUM 500mm FROM ROADS,
                                                                                                · GRADE EVENLY BETWEEN PRESCRIBED LEVELS & FINISHED SURFACE LEVELS ENSURING                                                                                                     Pruning - to promote   Monthly during EP, every 3 months Plants have desired natural form &
                                                     - PRIOR TO PREDICTED STORM EVENTS                                                                                              KERBS, GARDEN EDGES & PATHS TO ALLOW FOR MATURE PLANT FORM. CONFIRM WITH LA
                                                                                                  POSITIVE DRAINAGE & NO PONDING AREAS.                                                                                                                                         healthy plant growth   MP & beyond                       display healthy growth
                                                     - TWICE WEEKLY DURING PROLONGED RAIN                                                                                           WHICH REQUIRE MORE DISTANCE.
                                                                                                · CO-ORDINATE ESTABLISHMENT OF LANDSCAPE LEVELS WITH SUPER.
            · ALL STOCKPILES ARE TO BE PROTECTED WITH SUITABLE EROSION CONTROL DEVICES &                                                                                                                                                                                                               EP - Provide a report to LA on        Scheduled activities carried out.
                                                                                                                                                                                  · ALL PLANTS MUST BE PLANTED USING ONE AGRIFORM 10g FERTILISER (N.P.K. 20-4.3-4.1)
              GRADED TO ENSURE CONTROL OF RUNOFF.                                                                                                                                                                                                                                                      establishment progress at each        Successful establishment. Scheduled
                                                                                                DRAINAGE                                                                            TABLET AT A RATE OF 1/140mm, 2/200mm, 3/300, 4/45 litre & ABOVE POT SIZES, 5g TABLET FOR
            · COORDINATE INSTALLATION OF SEDIMENT & EROSION CONTROL DEVICES WITH CIVIL                                                                                                                                                                                                                 progress payment claim.               Maintenance activities carried out.
                                                                                                · ALL FIELD INLETS & SUBSURFACE DRAINS TO BE CONNECTED TO EXISTING DRAINAGE         TUBESTOCK.
              CONTRACTOR TO ENSURE COMPATIBILITY & CONSISTENCY IN CONTROL MEASURES.                                                                                                                                                                                                                    MP - Provide completed activities     Successful maintenance.
                                                                                                  SYSTEM. REFER ENGINEER'S & ARCHITECT'S PLANS FOR DRAINS & HYDRAULIC SERVICES.   · CULTIVATE SUBGRADE TO 150mm.                                                                Monitoring
            · ALL EXPOSED SURFACES, ONCE COMPLETED SHALL BE IMMEDIATELY STABILISED TO                                                                                                                                                                                                                  list to LA after every 3 months.
                                                                                                · SUBSURFACE DRAIN TO BE 100mm MINIMUM AG-FLOW PIPE CENTRED IN 300mm x 300mm      · SOAK PLANTS THOROUGHLY BEFORE REMOVING FROM CONTAINER.
              PREVENT EROSION.                                                                                                                                                    · REMOVE PLANTS FROM CONTAINERS / BAGS / TUBES CAREFULLY & INSPECT ROOTBALL,
                                                                                                  GRAVEL TRENCH SURROUNDED BY LA APPROVED PERMEABLE BIDIM.
                                                                                                · LANDSCAPE FIELD INLETS TO BE 300mm X 300mm x 450mm CONCRETE SUMPS WITH H.D.       REMOVE OLD MATTED & COILED ROOTS TO EXPOSE YOUNG ROOTS. ALL STOCK TO BE FREE
            SITE WORKS                                                                                                                                                              OF STRUCTURAL DEFECTS ABOVE & BELOW SOIL LINE (I.E. NO GIRDLED ROOTS).
                                                                                                                                                                                                                                                                                SOURCES:
                                                                                                  GALVANISED SURFACE GRATE / LID. DETERMINE REQUIREMENTS ON-SITE IN ADDITION TO
            · REMOVE ALL UNWANTED MATERIAL, DELETERIOUS & OPERATIONAL DEBRIS FROM SITE.                                                                                           · DO NOT MIX SOIL FROM HOLE WITH MULCH.
                                                                                                                                                                                                                                                                                · SURVEY - VIA ARCHITECT & ENGINEER             · ENGINEER - PROJEX PARTNERS
                                                                                                  THOSE ON PLANS.
            · PLAN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS.                                                                                                             · ROUGHLY SQUARE HOLE SIDES.
                                                                                                                                                                                                                                                                                · ARCHITECTURE - ICON BUILDING DESIGN
                                                                                                · ENSURE ALL DAMAGED STORMWATER PIPES ARE REPLACED & RELOCATED AS NECESSARY.
            · VERIFY ALL DIMENSIONS IN-THE-FIELD.                                                                                                                                 · FILL HOLE WITH WATER, ALLOW TO DRAIN BEFORE PLANTING.
                                                                                                · STORMWATER DRAINAGE TO BE 100mm MINIMUM uVPC DRAINAGE PIPE.
            · WHERE BAD GROUND OCCURS OR LEVELS PROVIDED ARE NOT FUNCTIONAL REFER TO LA.
                                                                                                · ENSURE SITE DRAINAGE CAN OCCUR TO WHOLE OF SITE & WHERE PATHS, EDGES, &         · INSTALL FERTILISER TABLET(S), INSTALL PLANT, BACKFILL PLANT WITH AMELIORATED SITE           TESTING:
            · ENSURE SITE DRAINAGE CAN OCCUR TO WHOLE OF SITE & WHERE PATHS, EDGES, &                                                                                               TOPSOIL. IF NONE IS AVAILABLE, BACKFILL WITH MRTS 16B TOPSOIL.                              · FURNISH LA WITH SOILS TESTING RESULTS & AMELIORATION RECOMMENDATIONS FOR
                                                                                                  GARDENS ETC. MAY IMPEDE DRAINAGE; REFER TO LA BEFORE CONTINUING WORKS.
              GARDENS ETC. MAY IMPEDE DRAINAGE, REFER TO SUPER BEFORE CONTINUING WORKS.                                                                                           · WATER PLANT IN WELL & MAINTAIN SOIL MOISTURE LEVELS THROUGH E.P.                              APPROVAL.
                                                                                                · ENSURE DRAINAGE WORKS CORRELATE WITH, & DO NOT DISTURB, ADJACENT LAND.
            · ENSURE DRAINAGE WORKS CORRELATE WITH ADJACENT LAND.                                                                                                                 · DO NOT COMPACT PLANT PIT.
                                                                                                · SEE LEGEND FOR PLAN SYMBOLS & PLANS FOR LOCATIONS.
            · CIVIL DESIGN HAS PROVIDED A POSITIVELY DRAINED SITE HOWEVER, WHERE DRAINAGE
              ISSUES ARE IDENTIFIED REFER SUPER.
                                                                                                · WHERE DRAINAGE IS REQUIRED THE FOLLOWING APPLIES:                                                                                                                             CERTIFICATIONS:
                                                                                                        - ALLOW FOR SEEPAGE INTERCEPTION SUB-SURFACE DRAINAGE WHERE PATHS &       NEW TURFED AREAS                                                                              · FURNISH LA WITH FOLLOWING CERTIFICATIONS PRIOR TO ON-MAINTENANCE
            · REFER TO 2.0 LANDSCAPE CONSTRUCTION - DRAINAGE FOR MORE INFORMATION.                                                                                                · EXCAVATE CIVIL FINISH LEVELS 150mm FOR TURF AREAS (UNLESS COMPLETED BY BUILDER).
                                                                                                          LANDSCAPE WORKS IMPEDE DRAINAGE. (TO BE COORDINATED ON SITE)                                                                                                            INSPECTION;
                                                                                                        - ALLOW FOR 300mm x 300mm GRAVEL TRENCH WITH SOCKED AG-LINE UNDER PATH,   · CULTIVATE SUBGRADE SOIL TO A DEPTH OF 150mm.                                                       - AS 2303:2015 - MRTS 16 TOPSOIL - AS4454 FOR MULCH
            SLEEVING & CONDUITS                                                                                                                                                   · CIVIL CONTRACTOR TO HARVEST, STOCKPILE & RE-SPREAD SITE TOPSOIL.
                                                                                                          DISCHARGE TO NATURAL DRAINAGE LINES.
            · SUPPLY & INSTALL 2 - 150mmØ SOLID HVPC PIPING UNDER ALL BUILDING EXTERIOR                                                                                           · LANDSCAPE CONTRACTOR TO TEST TOPSOIL TO AUSTRALIAN STANDARDS FOR SOIL
                                                                                                        - ALLOW FOR 300mm x 300mm LATERAL COLLECTION TRENCHES EXTENDING NOM. 1m                                                                                                 SAMPLE APPROVALS:
              HARDSTAND AREAS THAT BISECT LANDSCAPE AREAS FOR IRRIGATION & LANDSCAPE                                                                                                MODIFICATION RECOMMENDATIONS.
                                                                                                          EITHER SIDE OF LOW POINT.                                                                                                                                             · FURNISH LA WITH FOLLOWING SAMPLES FOR LA APPROVAL PRIOR TO CONSTRUCTION;
              DRAINAGE PURPOSES. EXTEND ENDS 300mm BEYOND PATHS, EACH SIDE & CAP.                                                                                                 · ALLOWANCES SHALL BE MADE BY LANDSCAPE CONTRACTOR TO ADJUST TOPSOIL FOR pH
                                                                                                                                                                                                                                                                                      - HOOP PINE MULCH - ROCK / COBBLE MULCH
                                                                                                 GRAVEL MULCH                                                                       BALANCING & NUTRIENT IMPROVEMENTS.
            TOPSOIL HARVESTING, STOCKPILING, RE-USE & SPREADING                                                                                                                   · TRIM AMELIORATED TOPSOIL, FILL DEPRESSIONS & PROVIDE EVEN FALLS AS INDICATED
                                                                                                · INSTALL DECORATIVE GRAVEL MULCHING PER FINISHES SCHEDULE.
            · BUILDER SHALL STRIP TOP 300mm OF TOPSOIL FROM SITE GARDEN AREAS & 150mm FROM                                                                                          ON DRAWINGS.
              TURFED AREAS & STOCKPILE TOPSOIL. LANDSCAPE CONTRACTOR TO COORDINATE WITH                                                                                           · FINISHED TURF GRADES/CONTOURS SHALL BE SMOOTH & UNDULATING, FREE FROM
                                                                                                EDGING
              BUILDER TO ENSURE TOPSOIL IS RE-INSTALLED PER THE FOLLOWING SPECIFICATIONS IN                                                                                         DELETERIOUS MATERIALS, DEBRIS, LARGE CLODS OF SOIL, STONES, & ORGANIC MATTER,
                                                                                                · SUPPLY, INSTALL, & MAINTAIN EDGES PER PLAN & DETAILS.
              RESPECTIVE LANDSCAPING AREAS.                                                                                                                                         POSITIVE FLOWING MINIMUM 2% SLOPES & NO PONDING AREAS. CO-ORDINATE ON-SITE WITH                                                               -
            · TOPSOIL STOCKPILING SHALL OCCUR IN AN AREA ADJACENT TO THE STRIPPED AREA(S) OR
              AREA BY BUILDER WHICH WILL NOT HINDER WORKS INSPECTION VISIBILITY.
                                                                                                PLANTING                                                                            LA & ENSURE LEVELS ARE APPROVED PRIOR TO LAYING TURF. WHERE TURF MEETS HARD
                                                                                                                                                                                    EDGES, ADJUST FINISH TOPSOIL LEVELS TO ALLOW STORMWATER TO FLOW UNIMPEDED                                     NOOSA COUNCIL
            · STOCKPILE TOPSOIL TO ENSURE NO PONDING OF WATER & POSITIVE DRAINAGE.                                                                                                  OVER LAID TURF TO LOW AREA RESPECTIVELY.
                                                                                                NEW GARDENS
            · INSTALL EROSION CONTROL MEASURES PER ENGINEER & ABOVE FOR STOCKPILED TOPSOIL.
            · LANDSCAPE CONTRACTOR TO CONDUCT SOILS ANALYSES TESTS TO STOCKPILED TOPSOILS
                                                                                                · EXCAVATE FINISH LEVELS 300mm FOR GARDEN AREAS.                                  · SUPPLY & LAY 'A' GRADE TURF PER PLANS & THE PLANTING SCHEDULE.
                                                                                                                                                                                  · WHERE TURF IS INSTALLED ON SLOPES >20% PIN TURF TO INDUSTRY STANDARDS. REMOVE
                                                                                                                                                                                                                                                                                                  APPROVED PLAN
                                                                                                · CULTIVATE SUBGRADE SOIL TO A DEPTH OF 150mm.
              & AMELIORATE PER RECOMMENDATIONS PRIOR TO RE-SPREADING. FURNISH LA WITH
              RESULTS. LANDSCAPE CONTRACTOR TO ALLOW FOR FOR pH BALANCING & NUTRIENT
                                                                                                                                                                                    PINS ONCE TURF IS WELL ESTABLISHED.
                                                                                                                                                                                  · WATER TURF IN WELL, APPLY WATER TO MAINTAIN SOIL MOISTURE UNTIL ESTABLISHED.
                                                                                                                                                                                                                                                                                              MCUU16/0138 & OPW16/0257
              AMELIORATIONS. ALL SOIL TESTING TO BE CONDUCTED BY A LAB ACCREDITED BY NATA.
            · SHOULD AMENDED SITE TOPSOILS BE INSUFFICIENT IN QUANTITY, LANDSCAPE
              CONTRACTOR TO IMPORT MRTS 16 TOPSOIL & SPREAD TO PROPOSED PLAN FINISH LEVELS.
                                                                                                                                                                                                                                                                                                    9 MAY 2017
              PRIOR TO SPREADING, IMPORTED TOPSOILS SHALL HAVE SOILS ANALYSES TEST AS PER
              ABOVE. IMPORTED SOILS SHALL THEN BE AMENDED PER TEST RESULTS PRIOR TO
              SPREADING.

                                                                                                                                                                                                                                                                                                 S1709935
                                                                                                                                                                                                                                                                                                 1703-A                                 anembo consultants
THE PROPERTY CLINIC                                                TWO DUPLEXES                                                                                                                                                                                                                                                         Landscape Architects
                                                                                                                                                                                                                                                                                                                                        Environmental
                                                                                                                                                                                                                                                                                                                                                                             Project Management


This document is the copyright of anembo consultants & shall
                                                                   LOT 6 RP79817, LOT 18 RP66590,                                                                                                                                                                                                                                       anembo consultants pty.ltd.       A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                        Sunshine Coast:   PO Box 24   Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used       111 & 113 GYMPIE TERRACE,                                                                                                                                                                                                                                            Ph: 07 5437 0000                      Fax: 07 5437 0088
except for the development and the site specified. Scale
can not be guaranteed when printing from PDF files.                NOOSAVILLE, QLD 4566                                                                                                                                                                                                                                                 e-mail: [email protected]               www.anembo.com
Log in to download the original file

SUPERSEDED Approved Plans MCU16_0138 & OPW16_0257.pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.