Appendix F - engineering report

Attached to the e-mail MCU15/0111 & REC15/0031 Development Application F - Engineering report Email 7 of 8.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                              PREPARED FOR PALM LAKE RESORTS
                                               DECEMBER 2014
                                                     B14158.W
                                                       DRAFT
                                         WATER & ENVIRONMENT




Civil Engineering Report Cooroy Retirement Community
Log in to download the original file

Appendix F - engineering report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 43 pages

Page 2

COMMERCIAL IN CONFIDENCE
All intellectual property rights, including copyright, in        Calibre Consulting
designs developed and documents created by Calibre               Level 6, 199 Grey Street
Consulting (Qld) Pty Ltd remain the property of this             SOUTH BRISBANE QLD 4101
company. Any use made of such design or document
without the prior written approval of Calibre Consulting
(Qld) Pty Ltd will constitute an infringement of the rights of   Ph: (07) 3895 3444
the company which reserves all legal rights and remedies         © 2014
in respect of any such infringement.

The information, including any intellectual property,
contained in this proposal is confidential and proprietary to
the Company. It may only be used by the person to whom
it is provided for the stated purpose for which it is provided
and must not be imparted to any third person without the
prior written approval of the Company. The Company
reserves all legal rights and remedies in relation to any
infringement of its rights in respect of its confidential
information




DOCUMENT CONTROL
B14158.W

 Issue                 Date                 Issue Details        Author               Checked   Approved


 A                     19/12/2014           TO CLIENT            IP                   AMCP

Page 3

TABLE OF CONTENTS
1   INTRODUCTION ............................................................................................................... 1
2   EARTHWORKS ................................................................................................................. 1
3   STORMWATER DRAINAGE ............................................................................................. 1
4   SEWERAGE RETICULATION ........................................................................................... 1
5   WATER RETICULATION .................................................................................................. 1
6   CONCLUSION ................................................................................................................... 2
7   THE CODES ...................................................................................................................... 2
8   CALIBRE CONSULTING CIVIL DRAWINGS .................................................................. 28



TABLES

Table 7-1: Division 13: Driveways and Carparking Code                                                                              2
Table 7-2: Division 14: Earthworks                                                                                                 7
Table 7-3: Division 15: Sediment and Erosion Control                                                                              10
Table 7-4: Division 16: Existing Services Code                                                                                    11
Table 7-5: Division 18: Transports, Roads and Drainage Code                                                                       12
Table 7-6: Division 19: Water Sensitive Design Code                                                                               23
Table 7-7: Division 20: Water Supply and Sewerage Reticulation Code                                                               24

Page 4

                                                                                                  CALIBRE CONSULTING




1         INTRODUCTION
Calibre Consulting (QLD) Pty Ltd (formerly Brown Consulting) has been commissioned by Palm Lake Resort to prepare a
Civil Engineering to support the permissible change application for a retirement community development located on
Trading Post Road Cooroy. The development comprises of Independent Living Units (ILUs), an Aged Care Facility and
associated community facilities. The main entrance to the development is off Trading Post Road.

From an engineering perspective, this report provides preliminary plans for earthworks, roadworks, turning paths, water
and sewer reticulations and erosion and sediment control which are provided in Section 8.



2         EARTHWORKS
The earthworks will be limited to that required for roadworks, allotment access and the installation of services. The
allotments will be left as close as possible to existing surface levels to preserve the existing vegetation and minimise
disturbance to the site. Bulk earthworks plans are provided in Calibre Consulting Drawing No. B14158-SK01 & SK02.



3         STORMWATER DRAINAGE
Stormwater will discharge into the existing gullies in accordance with the proposed Site Based Stormwater Quality
Management Plan Report No. B14158.W-01A dated December 2014.



4         SEWERAGE RETICULATION
This site is within an area currently serviced by Council. Sewer servicing for the site can provided by two options

    1.   The site will be serviced via a connection in Pearson Road. The 150mm diameter line runs along the northern
         side of Pearson Road and terminates on the eastern corner of the subject site; or

    2.   The site will be service via an onsite pump station and rising main to connection to existing sewer in Trading
         Post Road.

The location of the connection point and connections options are provided in Calibre Consulting Drawing No.
B14158-SK07.



5         WATER RETICULATION
Water reticulation for the site is a 150mm diameter main that terminates approximately 30 metres into Trading Post Road.
The location of the connection points are shown on the attached Calibre Consulting Drawing No. B14158-SK08 & SK09.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTSCIVIL ENGINEERING REPORT | 1

Page 5

                                                                                                  CALIBRE CONSULTING




6         CONCLUSION
This Civil Engineering is to support the permissible change application for a retirement community development located
on Trading Post Road Cooroy. This report provides preliminary plans for earthworks, roadworks, turning paths, water and
sewer reticulations and erosion and sediment control.

The following codes and probable solutions primarily relate to matters which would ordinarily be addressed as part of the
detailed design phase for operational works approval. However the matters have been reviewed as part of the preliminary
design considerations during the master planning for the site to ensure that all relevant measures can be satisfied in
accordance with good engineering practices and the design standards otherwise expressed within the codes.



7         THE CODES
Table 7-1: Division 13: Driveways and Carparking Code

Reference The Noosa Plan (Including amendments to 16 September 2013)
Table 14-49 Driveways

 14.113 General
 Specific Outcomes                      Probable Solutions                    Proposed Measures
                                        (if code assessable)
 O1                                     S1.1
 Vehicular access does not              Vehicular access is located and       The main access to the site is via
 adversely impact on safety,            designed in accordance with           Trading Post Road. A secondary access
 capacity and operations of the         AUSTROADS – Guide to Traffic          is proposed off Lamonts Road to
 existing or planned road network,      Engineering Practice requirements     service the aged care facility.
 the proposed driveway, cycle paths     for sight distance and Section 3 of
 or pedestrian pathway systems.         AS2890.1 Parking Facilities;          Calibre Consulting has provided a
                                                                              Traffic Impact Assessment Report No.
                                        AND                                   B14158ER01 (December 2014). Refer
                                                                              for details.


                                        S1.2
                                        Only one footpath crossing is         Internal and external footpath details
                                        provided;                             are shown on the Master Plan for the
                                                                              site.
                                        AND

                                        S1.3
                                        Driveways, other than within any      Preliminary road design have been
                                        setback have a maximum grade in       provided in this Report (No.
                                        accordance with Section 3 of          B14158.W-02A dated December 2014).
                                        AS/NZS 2890.1.                        Driveways will have maximum grades in
                                                                              accordance with Section 3 of AS/NZS
                                                                              2890.1.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                  CIVIL ENGINEERING REPORT | 2

Page 6

                                                                                                   CALIBRE CONSULTING




 14.113 General
 Specific Outcomes                     Probable Solutions                      Proposed Measures
                                       (if code assessable)
 O2 Driveways and Crossovers –         S2.1
 (a) are suitable and safe for their   Design of the driveway across the       Preliminary road design of the proposal
     intended use; and                 footpath is in accordance with          was undertaken to consider the
                                       Council’s Standard Drawings 9002        following:
 (b) match Council infrastructure.
                                       or 9005 as appropriate for he
                                       particular type of development as       The abovementioned preliminary design
                                       annotated on the drawings;              suggests that driveways traversing
                                                                               footpaths will be in accordance with
                                       AND                                     Council’s requirements and;

                                       S2.2 Driveways are designed and         Driveways can and will be constructed
                                       constructed in accordance with          in accordance with Council’s standard
                                       Council Standard Drawings 9014,         drawings; and
                                       9019, 9020, 9021, as appropriate
                                       for the particular type of
                                       development as annotated on the
                                       drawings;
                                       AND


                                       S2.3
                                       The change in grades in the             Changes in grades will comply with
                                       driveways and ramps is in               Section 3 of AS2890.1 Parking
                                       accordance with Section 3 of            Facilities.
                                       AS2890.1 Parking Facilities.

 O3                                    S3.1                                    N/A
 In commercial zoned areas, the        Design of multi-tenanted
 number of driveways across            developments in commercial zoned
 pedestrian footpaths is minimised.    areas include shared driveways and
                                       parking areas;
                                       AND

                                       S3.2
                                       Driveways are located so they abut
                                       existing driveways or adjoining
                                       development where practicable and
                                       reciprocal easements are created to
                                       reduce the sealed driveway width.

 O4                                    S4.1
 Vehicular access does not             Footpath and kerb crossings are         All vehicular access will take into
 adversely impact on the capacity,     located clear of existing stormwater    consideration associated infrastructure
 operations and maintenance of the     inlet structures, water and             and landscape during the detailed
 existing infrastructure;              sewerage infrastructure fittings, any   design process.
                                       other exiting utility infrastructure,
 AND
                                       existing landscaping and
                                       vegetation.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                   CIVIL ENGINEERING REPORT | 3

Page 7

                                                                                                       CALIBRE CONSULTING




 14.113 General
 Specific Outcomes                       Probable Solutions                         Proposed Measures
                                         (if code assessable)
 O5                                      S5.1
 Vehicular access does not               No solution provided.
 adversely impact on the integrity of
 existing landscaping or native
 vegetation.


 O6                                      S6.1 For:
 Driveway run-off is filtered prior to   (a)    Ancillary dwelling unit, Multiple   The application includes a Stormwater
 leaving the premises.                          Housing Types 1 or 2 if less        Quality Management Plan provided by
                                                than 5 carparking spaces,           Calibre Consulting Report No.
                                                Visitor accommodation Type 1        B14158.W-01A dated December 2014.
                                                and Home based business –
                                                the driveway is formed to drain
                                                to landscaped areas; and
                                         (b)    For other uses – grease and
                                                oil arrestors or stormwater
                                                quality improvement devices
                                                are incorporated into the
                                                design to treat run-off prior to
                                                run-off exiting from the
                                                premises.



Table 14-50 –Carparking and Manoeuvring

 14.114 Carpark Design and Layout


 Specific Outcomes                       Probable Solutions                          Proposed Measures
                                         (if code assessable)
 O7                                      S7.1                                        The number of carparking bays within
                                                                                     the site is generally in accordance
 Sufficient carparking is provided to    The number of parking and loading           with the number specified in Table 14-
 accommodate the number and type         bays is not less than the minimum           51 vehicle parking requirements.
 of vehicles likely to be generated      number specified in Table 14-51
 by the development having regard        Vehicle Parking Requirements;               All units will have a garage with
 to the specifics of the use                                                         allowance for tandem visitor parking
 including:                              OR                                          in all but a few cases. The
                                                                                     apartments allow for one space per
 (a)   the type and intensity of land
                                                                                     unit plus one space per 4 units for
       use;
                                                                                     visitor parking.
 (b)   any existing parking available
                                                                                     Parking at the aged care facility will
       on the site;
                                                                                     allow for the anticipated staff numbers
 (c)   hours of operation;                                                           and visitors to the facility.
 (d)   likely numbers of users;                                                      Calibre Consulting has provided a
                                                                                     Traffic Impact Assessment Report No.
                                                                                     B14158ER01 (December 2014).
                                                                                     Refer for details.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                       CIVIL ENGINEERING REPORT | 4

Page 8

                                                                                                       CALIBRE CONSULTING




 14.114 Carpark Design and Layout


 Specific Outcomes                       Probable Solutions                         Proposed Measures
                                         (if code assessable)
 (e)   the peak parking demand
       periods of uses on the site;      S9.2 If insufficient carparking spaces
       and                               are provided, on-site monetary
                                         contribution is made to Council in
 (f)   the availability of alternative   accordance with Section 6 of PSP13
       carparking.                       Contributions in lieu of provision of
                                         off-street carparking.




 O8                                      S8.1
 The layout of the development           Parking bays, manoeuvring areas,           Parking is distributed clearly
 provides adequate, clearing             queuing areas, loading setdown and         throughout the site in accordance with
 defined and easily accessible:          pickup areas and driveways are             the relevant codes.
                                         designed to the standards set out in
 (a)      on-site vehicle parking and
                                         Sections 2 and 3 of Australian
          manoeuvring areas; and
                                         Standard AS2890.1 Parking Facilities
 (b)      loading and manoeuvring        (Part 1: Off-street Carparking) and
          areas for delivery and         AS2890.2 – Off Street Parking (Part
          service vehicles.              2: Commercial Vehicles);
                                         AND

                                         S8.2
                                         The number of loading bays is not          Parking and turning areas will be
                                         less than the minimum number               provided within the service yard for
                                         specified in Table 14-47.                  service vehicles required by the
                                                                                    development.

 O9                                      S9.1
 Parking areas are located where         Carparking areas are accessed from         Pedestrian access through the site is
 they will not unduly conflict with      rear laneways where practicable.           separated from intersections and
 pedestrians and will not dominate                                                  other points of conflict to ensure safe
 the streetscape.                                                                   passage.

 O10                                     S10.1
 Provision is made for a reasonable      Carparking spaces are provided for         Parking for people with disabilities has
 number of on site carparking            people with disabilities at the rate       been catered for in accordance with
 spaces identified and reserved for      specified in Section 2.4.5 of AS2890.1     the relevant code.
 people with disabilities.               – Parking Facilities (Part 1: Off Street
                                         Carparking).

 O11                                     S11.1
 Access and egress points to not         Vehicle manoeuvring areas are              A traffic assessment has been
 impact on the safety and                provided in accordance with Section 3      undertaken to ensure access and
 operations of the road system.          of AS2890.1 Parking Facilities (Part 1:    egress points are safe.
                                         Off Street Carparking) so vehicles



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                      CIVIL ENGINEERING REPORT | 5

Page 9

                                                                                                    CALIBRE CONSULTING




 14.114 Carpark Design and Layout


 Specific Outcomes                      Probable Solutions                        Proposed Measures
                                        (if code assessable)
                                        enter and leave the site in a forward     Calibre Consulting has provided a
                                        gear.                                     Traffic Impact Assessment Report No.
                                                                                  B14158ER01 (December 2014).

 O12 Parking areas are designed to      S12.1
 -
                                        At locations where pedestrian and         Items discussed will be incorporated
 a) provide a progressive reduction     vehicle conflicts are likely to occur –   during the detailed design stage.
 in speed between the external road
 and internal parking spaces;           a) sight distances of at least 2.5
                                        seconds of travel time at the
 b) ensure lower speeds near areas      designated speed are provided;
 of high pedestrian activity through
 the use of appropriate road            b) splayed corners on structures are
 geometry or devices designed to        incorporated;
 limit speed; and                       c) landscaping is designed to allow
 c) maintain sight distances which      clear views;
 are appropriate for the likely         d) sign placement ensures that views
 operating speeds in all areas of       are not impeded;
 potential pedestrian/vehicle and
 vehicle/vehicle conflict;

 O13 A clearly defined pedestrian       S13.1                                     A traffic assessment has been
 network is provided that –                                                       undertaken to ensure access and
                                        In large open car parks with greater      egress points are safe.
 a) is located in areas where people    than 200 car parking spaces, a
 will choose to walk;                   pedestrian path between parking           Calibre Consulting has provided a
                                        spaces is provided on every second        Traffic Impact Assessment Report No.
 b) ensures that pedestrian                                                       B14158ER01 (December 2014).
                                        aisle;
 movement through car parking
 areas or structures are along aisles                                             Refer to Drawing set provided in this
 rather than across them;                                                         Report (No. B14158.W-02A dated
                                                                                  December 2014).

 O14                                    S14.1                                     Calibre Consulting has provided a
                                                                                  Traffic Impact Assessment Report No.
 Provision is made for pedestrian       No probable solution identified;          B14158ER01 (December 2014).
 and vehicular queues at conflict
 points;                                                                          Refer to Drawing set provided in this
                                                                                  Report (No. B14158.W-02A dated
                                                                                  December 2014).

 O15                                    S15.1
 Parking areas are lit to provide       Lighting is provided in accordance        Items discussed will be incorporated
 security for night-time users.         with Australian Standard 1158.1:1997      during the detailed design stage.
                                        - Road Lighting - Vehicular Traffic
                                        (Category V) Lighting - Performance
                                        Installation and Design Requirements.

 O16                                    S16.1                                     N/A
 In mixed use areas of Business         Resident carparking is limited to one
 centres residents do not compete       space per dwelling unit or
 with customers for carparking          accommodation unit.
 spaces.
                                        AND
                                        S16.2



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                    CIVIL ENGINEERING REPORT | 6

Page 10

                                                                                                   CALIBRE CONSULTING




 14.114 Carpark Design and Layout


 Specific Outcomes                     Probable Solutions                        Proposed Measures
                                       (if code assessable)
                                       Resident carparking is not located in
                                       the road reserve or between the
                                       residential or business building and
                                       the principal street frontage.




 O17                                   No solution provided                      Refer to Drawing set provided in this
                                                                                 Report (No. B14158.W-02A dated
 Car parking areas are landscaped
                                                                                 December 2014).
 to—
 a) provide shade;
 b) maximise infiltration of
 stormwater run-off;
 c) define parking areas;
 d) reduce direct visibility of car
 parking areas from external
 viewpoints;
 e) soften views of hardstand areas

 O18                                   No solution provided                      Calibre Consulting has provided a
                                                                                 Traffic Impact Assessment Report No.
 Development with the potential to                                               B14158ER01 (December 2014).
 generate significant traffic and
 parking impacts gives appropriate
 consideration to transport and land
 use issues23.




Table 7-2: Division 14: Earthworks

Table 14-52 Earthworks

 14.120 Effects of Works
                                       Acceptable Solutions (if self-
 Specific Outcomes                     assessable)                               Proposed Measures
                                       Probable Solutions
                                       (if code assessable)
 Drainage:
 O1                                    S1.1
 Finished surface levels ensure land   The finished surface gradient of any      Preliminary design indicates that
 is free draining.                     filled or excavated area is within the    finished surface levels will be in
                                       range 0.5% to 1.5% and drains to          accordance with required grade range.
                                       Council’s stormwater infrastructure
                                       where available or where stormwater
                                       infrastructure is not available, toward
                                       the street.
 Hydraulics:




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                   CIVIL ENGINEERING REPORT | 7

Page 11

                                                                                                     CALIBRE CONSULTING




 14.120 Effects of Works
                                       Acceptable Solutions (if self-
 Specific Outcomes                     assessable)                                 Proposed Measures
                                       Probable Solutions
                                       (if code assessable)
 O2 Any change to the level of land    No solution provided.                       Flood impact has been considered and
 does not have an adverse flooding                                                 will not have any negative impacts on
 impact on the flooding and drainage                                               the site. Refer to Brown Consulting’s
 characteristics off-site.                                                         report dated October 2007. Updated
                                                                                   analysis is required during detailed
                                                                                   design stage.
 Geotechnical Considerations
                                       For Assessable Development:
 O3                                    S3.1
 Earthworks do not result in           Filling works are undertaken in             All earthworks will be undertaken in
 geotechnical instability on the       accordance with Section 28 – Filling of     accordance       with    the    relevant
 premises or nearby premises.          Site of Council’s PSP5 – Engineering        standards to ensure geological stability
                                       Design Standards – Roads and                to the subject site and adjoining sites.
                                       Drainage and Earthworks.
                                       AND
                                       S3.2
                                       Where the filling is for residential
                                       commercial or industrial purposes the
                                       works comply with Sections 3 to 6 of
                                       AS3798 – Guidelines for earthworks
                                       on   commercial and residential
                                       development.
 Local Amenity
 O4                                    S4.1
 Earthworks     do   not    cause      The following control measures are          The earthworks will be conducted with
 disturbance to the amenity of the     implemented:                                due consideration to suppression of
 neighbouring land.                    (a) Regular water spraying of               dust.
                                             exposed areas to suppress dust;
                                       (b) Provision of dust stabilised or
                                             sealed internal roads;
                                       (c) Protective covering of exposed
                                             areas that are left for more than 2
                                             weeks; and
                                       If there is no valid development permit
                                       for the site, disturbed areas are
                                       revegetated using species identified in
                                       PSP3 – Landscaping Plants and
                                       Guidelines.
                                       AND
                                       S4.2
                                       Earthworks are undertaken only during       All works will be conducted within the
                                       the hours of 7am to 6pm, Monday to          designated timeframes.
                                       Friday and 7am to 6pm on Saturday.
                                       No work is undertaken on Sunday or
                                       public holidays.
 Vegetative Waste
 O5                                    S5.1
 Vegetation   cleared     from    a    Cleared vegetation is transported off-      Vegetation will be used or disposed of
 development site is disposed of in    site for disposal in an approved green      in an environmentally responsible
                                       waste disposal facility;                    manner.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                     CIVIL ENGINEERING REPORT | 8

Page 12

                                                                                                            CALIBRE CONSULTING




 14.120 Effects of Works
                                           Acceptable Solutions (if self-
 Specific Outcomes                         assessable)                                   Proposed Measures
                                           Probable Solutions
                                           (if code assessable)
 an environmentally        responsible     OR
 manner.
                                           S5.2
                                           Cleared vegetation is mulched onsite
                                           and reused for landscaping of the
                                           finished development;
                                           OR
                                           S5.3
                                           Cleared vegetation is disposed of for
                                           the purpose of firewood.
                                           (Note: Disposal of vegetative waste by
                                           burning off is not an acceptable
                                           method of disposal).
 Managing Contamination Risk
 O6                                        S6.1
 Materials used as fill are suitable for   The fill material is sold clean earth, free   It is proposed to aim for balanced
 development of the land and filling       of putrescible or refuse material,            earthworks within the site. However, if
 or excavation works do not result in      vegetation, acid sulfate soils, building      fill material is required, it will be
 the contamination of land.                or construction material or other             investigated by geotechnical engineer
                                           material of contaminants.                     to ensure that it is satisfactory prior to
                                           OR                                            placement.
                                           S6.2
                                           The site is not on the contaminated
                                           land register.
 Haulage Activity & Amenity
 O7                                        7.1
 Haulage of material to and from a         No solution provided.                         Refer to O6 above - Haulage will be
 site ensures:                                                                           undertaken with due consideration to
 (a) minimal       disturbance   to                                                      residents and Council’s infrastructure.
       neighbouring properties and
       properties along the haulage
       route; and
 (b) Council’s road infrastructure
       including pavements is not
       adversely affected.
 Extent of Earthworks
 O8                                        S8.1
 Earthworks are contained within the       All earthworks, including cut and fill        Cut and fill batters will be contained
 site.                                     batters, retaining walls etc are              within the site boundaries.
                                           contained within the subject site.


 O9                                        S9.1
 On sloping sites, excavation, or          Cut or fill is less than 2m in depth          Cut or fill will be less than 2m in depth
 filling are designed to maximise the      relative to the natural ground surface.       relative to the natural ground surface.
 use of natural slope and minimise
 the need for cut and fill.
 Environmental Protection
 O10                                       No solution provided.                         Earthworks will be minimised to limit
 Earthworks minimise any adverse                                                         the impact on groundwater and
 impact    upon      groundwater,                                                        watercourses.



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                            CIVIL ENGINEERING REPORT | 9

Page 13

                                                                                                        CALIBRE CONSULTING




 14.120 Effects of Works
                                        Acceptable Solutions (if self-
 Specific Outcomes                      assessable)                                  Proposed Measures
                                        Probable Solutions
                                        (if code assessable)
 watercourse,    drainage      lines,
 wetlands, and native vegetation.
 Dams
 O11 Dam location and construction      No solution provided.                        Existing dams on site will be improved
 does not impact upon neighbouring                                                   through re-shaping and landscaping
 properties in terms of:                                                             works as part of the stormwater
 (a) hydrology;                                                                      treatment train solution refer to Calibre
 (b) alteration of existing overland                                                 Consulting Report No. B14158.W-01A
     flowpaths and patterns;                                                         dated December 2014)
 (c) landslide or failure of dam
     wall; and
 (d) effluent disposal areas.



Table 7-3: Division 15: Sediment and Erosion Control

Table 14-53 Erosion and Sediment Control

 14.143 Effects of Works
                                        Acceptable Solutions (if self-
 Specific Outcomes                      assessable)                                  Proposed Measures
                                        Probable Solutions
                                        (if code assessable)
 Erosion and Sediment Control
 O1                                     S1.1
 Development minimises erosion          Site disturbance is limited to building      Sediment and erosion control plans
 and transport of sediments off-site.   areas, their surround and other use          will be generated as part of the
                                        areas;                                       operational works (civil) design
                                        AND                                          drawings to address all aspects of
                                                                                     erosion control.
                                        S1.2                                         Preliminary consideration of these
                                        Sediment barriers are provided               measures are demonstrated in this
                                        throughout    and    downslope         of    Report (No. B14158.W-02A dated
                                        disturbed areas to prevent sediment          December 2014). Refer to Drawing
                                        washing into gutters, drains and             No. B14158-SK03 & SK04.
                                        watercourse either on or off the site.
                                        AND
                                        S1.3 All stockpiles including sand, soil
                                        or building materials are within the
                                        premises and          contained within
                                        individual sediment barriers;
                                        AND
                                        S1.4 Sediment basins are provided
                                        where the site contains fine or
                                        dispersive soils;
                                        OR
                                        S1.5        A stormwater catchpit
                                        incorporating a stormwater catchpit
                                        protection device is installed so that all
                                        runoff from disturbed areas flows to the
                                        catchpit;



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                      CIVIL ENGINEERING REPORT | 10

Page 14

                                                                                                       CALIBRE CONSULTING




 14.143 Effects of Works
                                         Acceptable Solutions (if self-
 Specific Outcomes                       assessable)                                 Proposed Measures
                                         Probable Solutions
                                         (if code assessable)
                                         AND
                                         S1.6 For buildings:
                                         (a) Temporary       or   permanent
                                             downpipes are connected to the
                                             stormwater system before laying
                                             the roof; OR
                                         (b) Localised erosion is avoided by
                                             directing flow from downpipes
                                             over non-erosive areas.
 Stormwater Runoff
 O2                                      S2.1 Diversion drains or bunds are          Part of the sediment and erosion
 Stormwater is diverted         around   designed and constructed to drain           control mentioned above may require
 disturbed areas.                        upstream runoff around the disturbed        the diversion of stormwater around
                                         site;                                       disturbed areas.
                                         AND
                                         S2.2 Discharge from the diversion
                                         drains do not cause runoff impacts to
                                         other properties;
                                         OR

                                         S2.3     Alternative   methods,  as
                                         described in the Institution of
                                         Engineer’s Australia (Queensland
                                         Division) Soil Erosion and Sediment
                                         Control – Guidelines for Queensland
                                         Construction Sites, are used.

Table 7-4: Division 16: Existing Services Code

Table 14-51 Existing Services

 Specific Outcomes                       Probable Solutions                          Proposed Measures
                                         (if code assessable)
 Setbacks and Easements
 O1                                      S1.1
 Development near a sewer, water         The footing of any structure or building    Due consideration for all infrastructure
 main, stormwater drain, overland        is located clear of the zone of influence   and existing flow paths will occur
 flow path or associated structure       but no closer than 15.m (measured           throughout the detailed design
 does not:                               horizontally)     from     infrastructure   process.
 (a) adversely affect the function of    including sewers, water mains and
      the service;                       stormwater structures;                      Preliminary consideration of these
 (b) place an additional load on the     AND                                         items have been provided in the
      service; and                                                                   Drawings provided in this Report (No.
 (c) unduly       increase     future                                                B14158.W-02A dated December
      maintenance costs.                                                             2014).
                                         S1.2    No building of structure
                                         overhangs the zone of influence;
                                         AND
                                         S1.3 Finished surface levels maintain
                                         a minimum of 600mm of cover, but not




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                     CIVIL ENGINEERING REPORT | 11

Page 15

                                                                                                 CALIBRE CONSULTING




 Specific Outcomes                     Probable Solutions                       Proposed Measures
                                       (if code assessable)
                                       greater than 3m of cover to the
                                       underground infrastructure;
                                       AND
                                       S1.4 If the existing surface level is
                                       altered,   surface   level  services
                                       including manholes and inspection
                                       points are altered to match the new
                                       surface level;
                                       AND
                                       S1.5 Alterations are constructed in
                                       accordance with Sections 3, 4 and 5 of
                                       PSP6 – Engineering Design Standards
                                       –Water and Sewerage and Section 4
                                       of PSPs5 – Engineering Design
                                       Standards – Roads, Drainage and
                                       Earthworks;
                                       OR
                                       S1.6 Existing services are relocated
                                       and the design and construction of the
                                       relocated services is in accordance
                                       with Sections 3, 4 and 5 of PSP 6 –
                                       Engineering Design Standards –
                                       Water and Sewerage and Section 4 of
                                       PSP 5 – Engineering Design
                                       Standards – Roads, Drainage and
                                       Earthworks.
 O2                                    S2.1
  Maintenance access is provided to    A registered easement in favour of       Due consideration will be given to the
 all sewers, water mains, stormwater   Council    is     created  over    all   requirements of access for future
 drains, overland flow paths and       underground infrastructure located in    maintenance throughout the detailed
 associated structures.                private property;                        design process.
                                       AND
                                                                                Preliminary consideration of these
                                                                                items have been provided in the
                                                                                Drawings provided in this Report (No.
                                                                                B14158.W-02A dated December
                                                                                2014).
                                       S2.2
                                       The width of the easement is in the
                                       greater of 3m or the width of the zone
                                       of influence;
                                       AND
                                       S2.3                                     N/A
                                       The easement is centred over the
                                       centreline of the infrastructure.

Table 7-5: Division 18: Transports, Roads and Drainage Code

Table 14-55 Strategic Transport Network

 14.145 Strategic Transport Network
 Specific Outcomes                     Probable Solutions                       Proposed Measures
                                       (if code assessable)
 O1                                    S1.1



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                CIVIL ENGINEERING REPORT | 12

Page 16

                                                                                                    CALIBRE CONSULTING




 14.145 Strategic Transport Network
 Specific Outcomes                     Probable Solutions                          Proposed Measures
                                       (if code assessable)
 Traffic     generation    from  the   Where the development leads to the          Calibre Consulting has provided a
 development is considered in a        need       to     increase     transport    Traffic Impact Assessment Report No.
 localised and a Shire wide context    infrastructure in the Shire, the            B14158ER01 (December 2014).
 to ensure that:                       development contributes to the
 (a) the transport network has the     transport network in accordance with
       capacity    to    safely and    the requirements of Infrastructure
       efficiently      accommodate    Charges Plans (ICP); and where
       projected movements; and/or     developments requires infrastructure
 (b) the development includes          not included in the ICP, the
       measure to upgrade the          development          upgrades         the
       transport network to meet the   infrastructure at no cost to Council.
       imposed demands.


 O2 The street network has high         S2.1 Road planning and                     Calibre Consulting has provided a
                                        development design facilitates as          Traffic Impact Assessment Report No.
 street connectivity, both within
                                        many pedestrian and cycle                  B14158ER01        (December  2014),
 the development and to the             movements as possible and
 surrounding local area.                                                           please refer for details.
                                        provides for future connectivity and
                                        integration with adjoining sites;
                                        AND
                                        S2.2 Arterial and sub-arterial roads
                                        are designed so they can operate
                                        with high volumes of traffic during
                                        peak times;
                                        AND
                                        S2.3 Collector and local streets are
                                        provided to support short trips for
                                        local traffic moving in and between
                                        neighbourhoods. Local traffic is
                                        channelled towards collector
                                        streets to ensure that traffic
                                        volumes on local street are kept
                                        low;
                                        AND
                                        S2.4 Collector and local streets are
                                        designed to discourage through
                                        traffic;
                                        AND
                                        S2.5 A collector street is provided
                                        parallel to arterials particularly
                                        where they pass through town
                                        centres;
                                        AND
                                        S2.6 Appropriate width of road and
                                        verge is provided to allow streets to
                                        perform their designated functions
                                        in the street network; AND
                                        S2.7 A network of local streets
                                        focused towards an activity centre
                                        or school is provided for safe and
                                        efficient pedestrian and bike
                                        access to the school, safe
                                        conditions for school buses,
                                        setdown facilities, with on-site
                                        parking where practical;
                                        AND
                                        S2.8 Passive surveillance is
                                        maximised by designing streets to



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                  CIVIL ENGINEERING REPORT | 13

Page 17

                                                                                                    CALIBRE CONSULTING




 14.145 Strategic Transport Network
 Specific Outcomes                     Probable Solutions                          Proposed Measures
                                       (if code assessable)
                                         enable development to front all
                                         streets and roads, including
                                         arterials;
                                         AND
                                         S2.9 Streets near Public
                                         Passenger Transport facilities are
                                         orientated to optimise the walkable
                                         catchments within 800 metres
                                         walking distance;
                                         AND
                                         S2.10 The street network has no
                                         more than 15 percent of lots
                                         fronting cul-de-sacs. The maximum
                                         cul-de-sac length is 120 m; AND
                                         S2.11 Street stubs to adjacent
                                         future development areas are
                                         provided at spacings of 200 m or
                                         closer to enable future street
                                         connections to be made;
                                         AND
                                         S2.12 Street block lengths are not
                                         more than 240 m long, and
                                         predominantly around 150-180 m
                                         long. Street block lengths are
                                         generally shorter closer to town
                                         and neighbourhood centres;
                                         AND
                                         S2.13 Direct, safe and attractive
                                         pedestrian and cycle routes are
                                         provided within and through the
                                         development and connect to bus
                                         stops.
 O3 Development is designed:           S3.1 Higher density development is          The development has a network of
 (a) to    encourage     travel   by   concentrated along public transport         pedestrian paths within the site that
     community transport, walking      Routes; AND                                 link to external pathways.
     and cycling rather than by car;   S3.2 There is provision for bus routes
     and                               through development sites;
                                       AND
 (b) to maximise accessibility via
                                       S3.3 Bus routes are located to
     existing     and        planned
                                       maximise patronage catchment and to
     community transport facilities.
                                       consider personal safety, lighting and
                                       traffic management;
                                       AND
                                       S3.4 At least 90 percent of all residents
                                       are located within 400 metres of an
                                       existing or planned bus route;
                                       AND
                                       S3.5 Pedestrian and cycle movement
                                       is provided within local streets to and
                                       through development;
                                       AND
                                       S3.6 Attractive and safe pedestrian
                                       and cycle connections are provided
                                       with shade trees, graded walking and
                                       cycle paths and lighting;
                                       AND
                                       S3.7      Buildings    and    pedestrian
                                       entrances are oriented to the street;



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                   CIVIL ENGINEERING REPORT | 14

Page 18

                                                                                               CALIBRE CONSULTING




 14.145 Strategic Transport Network
 Specific Outcomes                    Probable Solutions                         Proposed Measures
                                      (if code assessable)
                                      AND
                                      S3.8 Pathways have ramps at all kerb
                                      corners for wheelchair and pram
                                      access;
                                      AND
                                      S3.9      Every     development      has
                                      convenient and prominent pedestrian
                                      entrances that cater for all pedestrians
                                      including older people, children and
                                      the mobility and vision impaired;
                                      AND
                                      S3.10 Expanses of ground level blank
                                      walls along street frontages, and large
                                      driveways and entrances to carparks
                                      are avoided;
                                      AND
                                      S3.11 Bus routes are not be located
                                      away from activity centres; and
                                      AND
                                      S3.12 Facilities for boarding and
                                      exiting community transport facilities
                                      are incorporated into developments;
                                      AND
                                      S3.13 Pedestrian and cycle routes
                                      within or adjacent to the development
                                      are overlooked by adjoining buildings,
                                      make use of views and attractive
                                      sights, have lighting and are
                                      signposted;
                                      AND
                                      S3.14 Suitable car restraint measures
                                      are adopted within the development
                                      such as lower speed limits or traffic
                                      calming.
                                      measures        to   support     greater
                                      pedestrian and cycle movement;
                                      AND
                                      S3.15 Traffic management devices on
                                      potential bus routes are provided in
                                      accordance with the Self-assessable
                                      code for undertaking road works on
                                      local government roads, under the
                                      Transport Planning and Coordination
                                      Regulation 2005;
                                      AND
                                      S3.16 Streets identified as potential
                                      bus routes are—
                                      a) collector streets and sub-
                                      arterial/arterial roads which provide
                                      highly accessible and relatively direct
                                      routes wherever practical;
                                      b) those that provide for the shortest
                                      and most direct route for an efficient
                                      public transport service; and
                                      c) those that can efficiently service
                                      adjoining development areas.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                               CIVIL ENGINEERING REPORT | 15

Page 19

                                                                                                       CALIBRE CONSULTING




 14.145 Strategic Transport Network
 Specific Outcomes                         Probable Solutions                         Proposed Measures
                                           (if code assessable)
 O4 Development access does not            No solution provided.                      Calibre Consulting has provided a
 compromise the functions of                                                          Traffic Impact Assessment Report No.
 particular roads as indicated in                                                     B14158ER01        (December  2014),
 Noosa Shire hierarchy, and does                                                      please refer for details.
 not adversely impact on the safety,
 capacity and operations of the road
 system.
                                           S5.1 Consideration is given to existing    Calibre Consulting has provided a
 O5 Pedestrian and cycle path              and future pathway linkages and            Traffic Impact Assessment Report No.
 infrastructure is provided –              pathways link to the Local and             B14158ER01        (December  2014),
 a) to form an integrated component        Regional Cycle Network and to the          please refer for details.
 of the movement network and the           Priority Infrastructure Plan in Part 15.
 open space system;                        S5.2 Direct and accessible linkages
 b) to encourage walking and               are provided into the site.
 cycling;                                  S5.3 Pathway and landscape works
 c) to add variety and visual interest;    are provided to a high standard to
 d) to conserve street trees,              Council specifications and assessed
 vegetation and other significant          for compliance with local government
 features;                                 cycling facility design standards.
 e) to allow equitable access to           S5.4 Pathways are provided to cater
 public areas and community                for shared use and cater for both
 facilities;                               commuting and recreational usage
 f) with adequate lighting where           and exceed minimum standards.
 subject to high night time usage;
 g) in locations where there is casual
 surveillance;
 h) or widened at potential conflict
 points;
 i) to incorporate—
 i) street tree planting to enhance the
 streetscape;
 ii) directional signage that is visible
 under all conditions.


 O6 Pedestrian and cycle path              S6.1 Pedestrian and cycle path             Calibre Consulting has provided a
 infrastructure is designed and            infrastructure is designed and             Traffic Impact Assessment Report No.
 constructed to –                          constructed –                              B14158ER01        (December  2014),
 a) provide a stable, smooth surface,      a)      in    accordance       with        please refer for details.
 including       across   driveways,       AUSTROADS Part 14 - Bicycles,
 sections and joins;                       Section 6;
 b) be easily maintained;                  b) to comply with local government
 c) a width and longitudinal gradient      design standards.
 to cater for projected usage,             c) to have navigational signs in
 including nearby—                         accordance        with      Council
 i) high activity nodes;                   ‘Wayfinding

 ii) public transport;                     signage specifications.
 iii) centres;                             d) to incorporate –
 d) provide clear sight-lines for safe     i) kerb ramps at all intersections
 use;                                      and designated crossings;
 e) be free of any obstructions such       ii) refuge islands on all roads with
 as fences, signage and bollards.          median strips;
                                           iii) holding rails for cyclists at the
                                           intersection of trunk collector, sub-




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                     CIVIL ENGINEERING REPORT | 16

Page 20

                                                                                                   CALIBRE CONSULTING




 14.145 Strategic Transport Network
 Specific Outcomes                       Probable Solutions                       Proposed Measures
                                         (if code assessable)
                                         arterial and arterial roads that are
                                         positioned in accordance with –
                                         A. Australian Standard 1742.9:
                                         2000 - Manual of Uniform Traffic
                                         Control      Devices     -   Bicycle
                                         Facilities; and
                                         B. AUSTROADS Part 14 - Bicycles
                                         - Section 9; and
                                         C. AUSTROADS Part 13 –
                                         Pedestrians.


Table 14-59 Roads and Drainage

 14.147 Road and drainage design
 and construction.
 Specific Outcomes                       Probable Solutions                       Proposed Measures
                                         (if code assessable)
 O7                                      S7.1
 Roads and pedestrian and cycle          Road planning and design supports        Calibre Consulting has provided a
 paths are planned and designed to       the hierarchy and functional aspects     Traffic Impact Assessment Report No.
 support     the     hierarchy     and   identified in Sections 2 and 3 of PSP5   B14158ER01        (December     2014),
 functional aspects identified in        Engineering Design Standards –           please refer for details.
 Sections 2 and 3 of PSP5                Roads, Drainage and Earthworks;          All roads will be designed in
 Engineering Design Standards –          AND                                      accordance with relevant Council
 Roads, Drainage and Earthworks                                                   policies and engineering guidelines.
 and to ensure that:
 (a) design and alignment of the
      roads, intersections and all
      associated works:
      i.   provides        a      safe
           environment for all users;
      ii.  is adequate for the design
           speed environment;
      iii. is adequate for predicted
           traffic volumes; and
      iv. maintains the safe and
           efficient functioning of
           the road network without
           the use of traffic signals;
      v.   is     compatible      with
           existing roads;
      vi. is easily maintained by
           Council equipment; and




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                  CIVIL ENGINEERING REPORT | 17

Page 21

                                                                                                   CALIBRE CONSULTING




 14.147 Road and drainage design
 and construction.
 Specific Outcomes                         Probable Solutions                        Proposed Measures
                                           (if code assessable)
       vii. where appropriate, has         S7.2 Road and pathway planning and
            the        ability        to   design is in accordance with, in order
            accommodate           public   of precedence:
            transport services.
 (b)   Road pavement surfaces:                 (a)      Noosa Integrated Local
       i.   are durable enough to                       Transport Plan;
            carry estimated wheel              (b)      Queensland Transport’s
            loads of travelling and                     Shaping Up;
            parked vehicles;
                                               (c)      Queensland       Design
       ii.  provide for the safe                        Code for Residential
            passage      of vehicles;                   Streets;
            pedestrians, cyclist and
            discharge of stormwater            (d)      AUSTROADS Guide to
            runoff from contributing                    Traffic     Engineering
            catchments       and    the                 Practice;
            preservation       of    all       (e)      Sections 2 and 3 of
            weather access;                             PSPS 5 Engineering
 (c)   kerb and channel:                                Design Standards –
                                                        Roads,         Drainage,
       i.   controls            vehicle                 Earthworks; or
            movement by delineating
            the carriageway for all            (f)      The Noosa Cycling and
            users;                                      Walking         Network
                                                        Development Plan; or
       ii.  conveys road pavement
            runoff    to    stormwater         (g)      A combination of the
            drainage in a manner that                   principles   in    these
            allows the road to be                       documents.
            trafficable in Q100 ARI            AND
            local rainfall events; and

 (d)   verges and footpaths;               S7.3 On road cycling treatment is
       i.   safe       access        for   utilised to provide safe and continuous
            pedestrians and cyclists       movement of cyclist along a roadway,
            clear of obstructions;         such as:
       ii.  an access area           for   (a) sealed shoulders;
            vehicles onto properties;      (b) wide kerbside lane;
       iii. a corridor allocated for       (c) exclusive or peak period bicycle
            services and utilities; and           lane;
       iv. additional amenity for          (d) advisory treatments such as
            minor roads.                          Bicycle Awareness Zone;
                                           (e) shared parking/bicycle lane;
                                           (f) contra flow bicycle lane; and
                                           (g) bus/bicycle lane.
                                           S7.4 The provision of bicycle lanes at
                                           intersections    is    generally    in
                                           accordance with AUSTROADS Part
                                           14, Section 5 and the Manual of Urban
                                           Traffic Devices (MUTCD) Part 9.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                   CIVIL ENGINEERING REPORT | 18

Page 22

                                                                                                    CALIBRE CONSULTING




 14.147 Road and drainage design
 and construction.
 Specific Outcomes                      Probable Solutions                         Proposed Measures
                                        (if code assessable)
 O8                                     S8.1
 Stormwater drainage infrastructure     Stormwater drainage planning, design       Stormwater drainage will be designed
 is   planned,    designed      and     and construction is in accordance with     in    accordance      with    Council
 constructed to:                        Section 4 of PSP 5 Engineering             requirements and with consideration to
 (a) be accessible, cost effective      Design Standards – Roads, Drainage         the Stormwater Quality Management
     and easily maintained.             and Earthworks;                            Plan provided by Calibre Consulting
 (b) Protect downstream capacity;       AND                                        Report No. B14158-01A.
 (c) Protect downstream water
     quality;                           S8.2 As constructed data is submitted
 (d) Maximise onsite stormwater         in accordance with Section 6 of PSP 5
     retention and retardation; and     Engineering Design Standards –
 (e) Convey runoff to stormwater        Roads, Drainage and Earthworks;
     drainage in a manner that          AND
     allows roads to be trafficable
     in Q100 ARI local rainfall         S8.3 Stormwater drainage planning,
     events.                            design and construction       is in
                                        accordance with the Queensland
                                        Urban Drainage Design Manual.

 O9                                     S9.1
 Road and stormwater drainage           Road and stormwater drainage               Roads and the stormwater networks
 infrastructure is constructed:         infrastructure is constructed in           will be designed in accordance with
 (a) in accordance with appropriate     accordance with:                           Council requirements. Refer to
      engineering standards; and        (a) Sections 2,3 and 4 of PSP5             Drawing No. B14158-SK03 & SK04
 (b) to       minimise        adverse         Engineering Design Standards –       for Erosion and Sediment Control
      environmental          impacts,         Roads,        Drainage        and    Layout Plans
      including from runoff and               Earthworks;
      erosion.                          (b) Queensland Design Code for
                                              Residential Streets;
                                        (c) AUSTROADS; or
                                        (d) A combination of the principles of
                                              these documents.
                                        AND
                                        S9.2 Erosion and sediment control
                                        measures       are    designed      and
                                        implemented in accordance with the
                                        Institution of Engineers Australia (Qld
                                        Division) Soil Erosion and Sediment
                                        Control – Guidelines for Queensland
                                        Construction Sites.




 Environmental Protection
 O10                                    S10.1
 Roads and stormwater drainage          Roads and stormwater drainage follow       Consideration will be given to all
 infrastructure are located and         the edge of existing disturbed areas; or   environmental factors throughout the
 aligned so as to:                      alternatively, these works are co-         detailed design phase.
 (a) minimise disturbance to native     located within a combined utility          Refer to the Stormwater Quality
      vegetation and/or other habitat   corridor;                                  Management Plan provided by Calibre
      areas;                            AND                                        Consulting Report No. B14158.W-01A
                                                                                   dated December 2014).




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                   CIVIL ENGINEERING REPORT | 19

Page 23

                                                                                                      CALIBRE CONSULTING




 14.147 Road and drainage design
 and construction.
 Specific Outcomes                       Probable Solutions                         Proposed Measures
                                         (if code assessable)
 (b)   protect and maintain wildlife     S10.2 Roads avoid native vegetation
       corridor movements and the        and provide for fauna underpasses
       safety of native fauna;           and     associated   fencing where
 (c)   minimise changes to the           appropriate;
       hydrological regime, including    AND
       drainage patterns, runoff and
       water quality;                    S10.3 Road infrastructure within or
 (d)   avoid crossing watercourses,      adjacent to native habitat incorporates
       drainage lines and wetlands,      fences which allow for protected
       but where such crossings are      wildlife movement and controls
       unavoidable, disturbed areas      unrestricted access of domestic cats
       are reinstated and revegetated    and dogs;
       on completion of works; and       AND
 (e)   minimise bulk earthworks.
                                         S10.4 Native vegetation is protected
                                         from clearing or construction activities
                                         by:
                                             (a)      clearly           marking
                                                      vegetation to be retained
                                                      with flagging tape;
                                             (b)      installing      protective
                                                      fencing     around      the
                                                      dripline of vegetation;
                                                      and
                                             (c)      ensuring stock piling,
                                                      storage and vehicle
                                                      parking occur outside
                                                      the areas of vegetation
                                                      to be retained;
                                         AND




                                         S10.5 Low impact construction              See Above
                                         techniques are used around areas of
                                         vegetation to be retained to minimise
                                         interference with the vegetation.


 O11                                     S11
 Roads and stormwater drainage           No solution provided.                      Constructed road and drainage
 infrastructure is proven to be                                                     infrastructure will satisfy Council’s
 suitable for its use prior to Council                                              requirements prior to hand over.
 accepting the dedicated asset.

 O12                                     S12
 Alignment of stormwater drainage        The location, design and construction      Infrastructure will be located for ease
 infrastructure is to allow for easy     of stormwater drainage structures is in    of maintenance, easements will be
 access      for     the    ongoing      accordance with Sections 4 and 5 of        established where required.
 maintenance by Council.                 PSP5, Engineering Design Standards
                                         – Roads, Drainage and Earthworks;
                                         AND




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                    CIVIL ENGINEERING REPORT | 20

Page 24

                                                                                                        CALIBRE CONSULTING




 14.147 Road and drainage design
 and construction.
 Specific Outcomes                       Probable Solutions                           Proposed Measures
                                         (if code assessable)
                                         S10.2 Where infrastructure is located
                                         on private land an easement is
                                         dedicated over the infrastructure in
                                         accordance with Section 4 of PSP5
                                         Engineering Design Standards –
                                         Roads, Drainage and Earthworks.
 14.148 Frontage Works

 O11 Development is provided with        S11.1 The following infrastructure           All necessary frontage works will be
 external roadworks along the full       components already existing at the           constructed and will consider all
 extent of the frontage of the site to   frontage of the site or are provided at      necessary associated infrastructure.
 an appropriate standard having          the developer’s expense:
 regard to the specified function of     (a) full width sealed road;
 the road.                               (b) concrete kerb and channel where
                                               appropriate;
                                         (c) forming and grading to footpaths;
                                         (d) vehicular kerb and footpath
                                               crossings;
                                         (e) a constructed bikeway;
                                         (f) a constructed footpath;
                                         (g) a constructed carriageway;
                                         (h) required alterations to public
                                               utility    mains,    services     or
                                               installations;
                                         (i) construction of any required
                                               alterations to public utility mains,
                                               services or installations;
                                         (j) stormwater drainage works; and
                                         (k) installation of electrical conduits.
                                         AND
                                         S11.2 Road and drainage design and
                                         construction is in accordance with
                                         Sections 3 and 4 of PSP 5 Engineering
                                         Design Standards – Roads, Drainage
                                         and Earthworks.


 Specific Outcomes                       Probable Solutions                           Proposed Measures
                                         (if code assessable)
 14.149 Road and Rail Corridors

 O12                                     S12.1
  Noise sensitive uses including         Noise sensitive uses including               An acoustic assessment has been
 residential uses are not subjected      residential uses are separated by a          undertaken in relation to this criteria.
 to high traffic noise levels from the   minimum of:                                  Please refer to associated report from
 major road network or rail corridors.        (a)      40m from the property          ASK Consulting Engineers.
                                                       boundary of roads within
                                                       the major road network;
                                                       and
                                              (b)      80m from the property
                                                       boundary      of     rail
                                                       corridors.
                                         OR




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                      CIVIL ENGINEERING REPORT | 21

Page 25

                                                                                                       CALIBRE CONSULTING




 Specific Outcomes                       Probable Solutions                          Proposed Measures
                                         (if code assessable)
                                         S12.2 Development in the vicinity of
                                         road corridors meets the following
                                         external design criteria for roads in the
                                         major road network:
                                         (a) 63dB(A)L10(18 hours) based on
                                               predicted traffic volumes ten
                                               years hence;
                                         AND
                                         S12.3 Development in the vicinity of
                                         rail corridors meets the following
                                         external design level noise criteria:
                                         (a) 65dB(a), assessed as the 24
                                              hour      average       equivalent
                                              continuous A-weighted sound
                                              pressure level; and
                                         (b) 87dB(A) assessed as a single
                                              event maximum sound pressure
                                              level.
 14.150 Staged Development

 O15
 Staged development is planned,          No solution provided.                       Staged development is proposed and
 designed and constructed to ensure                                                  due consideration for required services
 that:                                                                               will be allowed for.
 (a) each stage of the development
       can be constructed without
       interruption to services and
       utilities provided to the
       previous stages;
 (b) the infrastructure provided is
       capable of servicing the entire
       development; and
 (c) the       materials  used    are
       consistent throughout the
       development.
 14.151 Alterations to Services and
 Utilities
 O16                                     S16.1
 Any alteration or repairs to            Any      alteration or repair   to          Any change to existing infrastructure
 infrastructure as a result of the       infrastructure as a result of the           will be rectified at the expense of the
 development are made at no cost to      development are completed at the            developer.
 Council.                                developer’s expense.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                     CIVIL ENGINEERING REPORT | 22

Page 26

                                                                                                        CALIBRE CONSULTING




Table 7-6: Division 19: Water Sensitive Design Code

Table 14-61


 Specific Outcomes                      Probable Solutions                            Proposed Measures
                                        (if code assessable)
 Water Reuse

 O1                                     S1.1
 Development uses a combination of      No solution provided.                         The development uses a combination
 detention and retention systems to                                                   of detention and retention. Please refer
 capture runoff from areas on the                                                     to the Concept Stormwater Quality
 site;                                                                                Report     No.     B14158.W       -01A
                                                                                      undertaken by Calibre Consulting
 AND
                                                                                      dated December 2014.

 O2                                     S2.1                                          Refer to the Concept Stormwater
                                                                                      Quality Management Report No.
 Water storage devices must have        No solution provided.                         B14158.W -01A undertaken by Calibre
 sufficient capacity having regard to
                                                                                      Consulting dated December 2014.
 local rainfall pattern and the
 catchment area of roof or other hard
 standing surface.
 AND

 O3                                     S3.1
 Captured water utilised for all non-   Captured water is plumbed to be               Refer to the Concept Stormwater
 potable uses on site;                  available for all external uses including
                                                                                      Quality Management Report No.
                                        gardening, irrigation, ponds, filling
 AND                                                                                  B14158.W -01A undertaken by
                                        swimming pools and outdoor cleaning,
                                        as well as all ground floor toilet cisterns   Calibre Consulting dated December
                                        and washing machine cold taps; and            2014.

                                        S3.2
                                        Where the captured water is used for
                                        toilet flushing and/or laundry use, an
                                        automatic or manual interchange
                                        device that allows alternate use of
                                        capture water or the reticulation water
                                        supply is installed to ensure that there
                                        is a continual supply of water for
                                        sanitary flushing and laundry use.

 O4                                     S4.1
 Onsite detention does not adversely    No solution provided.                         Refer to the Concept Stormwater
 impact on water requirements                                                         Quality Management Report No.
 downstream of the site where the                                                     B14158.W -01A undertaken by Calibre
 water is required to sustain the                                                     Consulting dated December 2014.
 ecology    and     hydrology     of
 downstream                 systems
 (environmental flows);
 AND

 O5                                     S5.1
 Within the Shire Business Centre       No solution provided.                         N/A
 site, as shown on Map SBC, on site
 detention measures are contained



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                      CIVIL ENGINEERING REPORT | 23

Page 27

                                                                                                   CALIBRE CONSULTING




 Specific Outcomes                       Probable Solutions                      Proposed Measures
                                         (if code assessable)
 within the developed areas of the
 site, clear of drainage lines and
 Open Space precincts.

 Run-off Treatment

 O6                                      S6.1
 Run-off that leaves the site is         No solution provided.                   Refer to the Concept Stormwater
 treated so as not to adversely                                                  Quality Management Report No.
 impact on the ecology and                                                       B14158.W -01A undertaken by Calibre
 hydrology      of    downstream                                                 Consulting dated December 2014.
 environmental flows;                                                            Bioretention Basins, Constructed
                                                                                 Wetlands and Water Quality Control
 AND
                                                                                 Ponds have been incorporated into the
                                                                                 treatment train.
 O7                                      S7.1
 Within the Shire Business Centre as     No solution provided.                   N/A
 shown on Map SBC –
 (a) run-off treatment occurs within
      the site; and
 (b) drainage lines are only used
      for final polishing of run-off.
 Town Water Supply Connections

 O8 Backflow devices or similar          S8.1 A suitable backflow prevention     Suitable backflow prevention devices
 systems ensure water reuse              device is installed to protect the      will be installed in appropriate
 facilities have no impact on the        potable water within the reticulation   locations of the potable water supply.
 quality of the town mains water.        water supply in accordance with
                                         AS/NZS 3500:2003 Plumbing and
                                         Drainage.
 Use of Natural Treatments and
 Systems
 O9 Natural treatment strategies,        No solution provided                    We refer you to Brown Consulting
 including grass swales and bio-                                                 report dated October 2007. We note
 retention      systems,    vegetated                                            that bioretention swales, GPT and
 filtration strips and gross pollutant                                           control ponds will be used to treat run-
 traps are used where practicable;                                               off.
 AND
 O10 Within the Shire Business           No solution provided.                   Not Applicable
 Centre as shown on Map SBC,
 where necessary, drainage lines are
 ecologically enhanced to ensure
 that the water quality polishing
 functions are of high standard.

Table 7-7: Division 20: Water Supply and Sewerage Reticulation Code

Table 14-59 Water Supply

 Specific Outcomes                       Probable Solutions                      Proposed Measures
                                         (if code assessable)
 14.1164 Design and Construction
 (Water)




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                 CIVIL ENGINEERING REPORT | 24

Page 28

                                                                                                     CALIBRE CONSULTING




 Specific Outcomes                       Probable Solutions                        Proposed Measures
                                         (if code assessable)
 O1 Water Supply Infrastructure          S1.1 Water supply infrastructure is       A water supply analysis has been
                                         designed in accordance with Section       undertaken. The results of the study
 (a)   Meets the needs of the users;
                                         3 of PSP 6 – Engineering Design           indicate that sufficient capacity is
 (b)   Is designed to be compatible      Standards – Water and Sewerage            available for the proposed
       with existing infrastructure;     and As Constructed data submitted in      development.
       and                               accordance with Section 7 of PSP 6 –
                                         Engineering Design Standards –
 (c)   Is deigned using materials        Water and Sewerage.
       that are suitable for the use,
       durable, easy to maintain and
       cost effective, taking into
       account the whole of life cycle
       cost and Council’s
       maintenance inventory.

 O2 Water supply infrastructure is       S2.1 Water supply infrastructure is       All water supply infrastructure will be
 constructed:                            constructed in accordance with            constructed and tested in accordance
                                         Section 6 of PSP 6 – Engineering          with Council requirements.
 (a)   in accordance with
                                         Design Standards – Water and
       appropriate engineering
                                         Sewerage;
       standards; and
                                         AND
 (b)   to minimise adverse
       environmental impacts.

                                         S2.2 Erosion and Sediment control         Erosion and sediment control
                                         measures are designed and                 measures will be prepared as part of
                                         implemented in accordance with the        the operational works (civil) design
                                         Institution of Engineers Australia (Qld   drawings.
                                         Division) Soil Erosion and Sediment
                                         Control – Guidelines for Queensland
                                         Construction Sites.

 O3 Water supply infrastructure is       No solution provided.                     Water supply infrastructure will be
 proven to be suitable for its use                                                 constructed and tested to Council’s
 prior to Council accepting the                                                    satisfaction prior to hand over.
 dedicated asset.

 O4 Water supply infrastructure is       No solution provided.                     Water supply infrastructure will be
 provided with all supporting                                                      supported by all required technical
 technical documentation.                                                          documentation.

 O5 Where buildings or other             S5.1 The footing of any building or       All existing infrastructure will be
 structures are in proximity to          structure is located clear of the zone    protected from the proposed works.
 Council’s water supply                  of influence but no closer than 1.5m
 infrastructure, provision is made to    (measured horizontally) from
 protect the infrastructure from         infrastructure including sewers, water
 physical damage and to allow            mains and stormwater structures.
 ongoing maintenance by Council.
                                         AND

                                         S5.2 A registered easement in favour
                                         of Council is created over all
                                         underground infrastructure located in
                                         private property;
                                         AND




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                   CIVIL ENGINEERING REPORT | 25

Page 29

                                                                                                      CALIBRE CONSULTING




 Specific Outcomes                       Probable Solutions                        Proposed Measures
                                         (if code assessable)
                                         S5.3 The width of the easement is
                                         the greater of 3m or the width of the
                                         zone of influence;
                                         AND

                                         S5.4 The easement is centred over
                                         the centreline of the infrastructure.

 O6 Alignment of water supply            S6.1 Infrastructure is designed and       Detailed design considerations will
 infrastructure allows for easy          constructed on the preferred              ensure ease of maintenance is
 access for the ongoing                  alignments in accordance with             achieved.
 maintenance by Council.                 Section 3 of PSP 6 Engineering
                                         Design Standards – Water and
                                         Sewerage.

 O7 Any alterations or repairs to        S7.1 Any alterations or repairs to        Existing infrastructure will be
 infrastructure as a result of the       infrastructure as a result of the         protected at all times. Any changes
 development are made at no cost         development are completed at the          will be rectified at the developer’s
 to the Council.                         developer’s expense.                      expense.
 14.183 Design and Construction
 Sewer

 O8 Sewerage Reticulation                S1.1 Sewerage Reticulation                Sewer infrastructure will be designed
 Infrastructure                          infrastructure is designed in             to cater for the intended load and will
                                         accordance with Sections 4 and 5 of       be compatible with existing
 (a)   Meets the needs of the users;
                                         PSP 6 – Engineering Design                infrastructure.
 (b)   Is designed to be compatible      Standards – Water and Sewerage.
       with existing infrastructure;
       and
 (c)   Is designed using materials
       that are suitable for the use,
       durable, easy to maintain and
       cost effective, taking into
       account the whole of life cycle
       cost and Council’s
       maintenance inventory.



 O9 Sewerage Reticulation                S9.1 Sewerage Reticulation                Sewer infrastructure will be designed
 infrastructure is constructed:          infrastructure is constructed in          in accordance with Council
                                         accordance with Section 6 of PSP 6 –      requirements and general engineering
 (a)   in accordance with
                                         Engineering Design Standards –            principles.
       appropriate engineering
                                         Water and Sewerage and As
       standards; and
                                         Constructed data submitted in
 (b)   to minimise adverse               accordance with Section 7 of PSP 6 –
       environmental impacts.            Engineering Design Standards –
                                         Water and Sewerage;
                                         AND

                                         S9.2 Erosion and Sediment control
                                         measures are designed and
                                         implemented in accordance with the
                                         Institution of Engineers Australia (Qld
                                         Division) Soil Erosion and Sediment




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                    CIVIL ENGINEERING REPORT | 26

Page 30

                                                                                                    CALIBRE CONSULTING




 Specific Outcomes                       Probable Solutions                       Proposed Measures
                                         (if code assessable)
                                         Control – Guidelines for Queensland
                                         Construction Sites.

 O10 Sewerage Reticulation               No solution provided.                    Sewer infrastructure will be tested and
 infrastructure is proven to be                                                   inspected to Council’s satisfaction
 suitable for its use prior to Council                                            prior to hand over.
 accepting the dedicated asset.

 O11 Sewerage Reticulation supply        No solution provided.                    All supporting documentation will be
 infrastructure is provided with all                                              provided during detailed design.
 supporting technical
 documentation.

 O12 Where buildings or other            S12.1 The footing of any building or     All existing infrastructure will be
 structures are in proximity to          structure is located clear of the zone   protected from the proposed works.
 Council’s water supply                  of influence but no closer than 1.5m
 infrastructure, provision is made to    (measured horizontally) from
 protect the infrastructure from         infrastructure including sewers, water
 physical damage and to allow            mains and stormwater structures.
 ongoing maintenance by Council.
                                         AND

                                         S12.2 A registered easement in
                                         favour of Council is created over all
                                         underground infrastructure located in
                                         private property;
                                         AND

                                         S12.3 The width of the easement is
                                         the greater of 3m or the width of the
                                         zone of influence;
                                         AND

                                         S12.4 The easement is centred over
                                         the centreline of the infrastructure.

 O13 Alignment of sewerage               S13.1 Infrastructure is constructed on   Detailed design considerations will
 reticulation infrastructure is to       the preferred alignments in              ensure ease of maintenance is
 allow for easy access for the           accordance with Section 4 of PSP 6 –     achieved.
 ongoing maintenance by Council.         Engineering Design Standards –
                                         Water and Sewerage.

 O14 Any alterations or repairs to       S14.1 Any alterations or repair to       Existing infrastructure will be
 infrastructure as a result of the       infrastructure as a result of the        protected at all times. Any changes
 development are made at no cost         development are completed at the         will be rectified at the developer’s
 to Council.                             developer’s expense.                     expense.




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                  CIVIL ENGINEERING REPORT | 27

Page 31

                                                                                      CALIBRE CONSULTING




8        CALIBRE CONSULTING CIVIL DRAWINGS
Drawing No B14158-SK01: Bulk Earthworks Plan Sheet 1 of 2
Drawing No B14158-SK02: Bulk Earthworks Plan Sheet 2 of 2
Drawing No B14158-SK03: Erosion and Sediment Control Layout Plan Sheet 1 of 2
Drawing No B14158-SK04: Erosion and Sediment Control Layout Plan Sheet 2 of 2
Drawing No B14158-SK05: Roadworks and Drainage Plan Sheet 1 of 2
Drawing No B14158-SK06: Roadworks and Drainage Plan Sheet 2 of 2
Drawing No B14158-SK07: Sewerage Reticulation Layout Plan
Drawing No B14158-SK08: Water Reticulation Layout Plan Sheet 1 of 2
Drawing No B14158-SK09: Water Reticulation Layout Plan Sheet 2 of 2
Drawing No B14158-SK10: Turning Paths Sheet 1 of 4
Drawing No B14158-SK11: Turning Paths Sheet 2 of 4
Drawing No B14158-SK12: Turning Paths Sheet 3 of 4
Drawing No B14158-SK13: Turning Paths Sheet 4 of 4




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                      CIVIL ENGINEERING REPORT | 28

Page 32

 

 
 
 
   

BE RL 102.10 SY NY WE SY \ ’
LEGEND “FL RL 102.40 SNH SN ‘y CY
| CUT HATCH 5

FILL HATCH

   
  

BE RL 102.05
FL RL 102.35

   
      
   
   
    
 
    

BE RL 100.95
FL RL 101.25

 

DESIGN SURFACE CONTOUR (0.20m INTERVAL)

   
  
     
 
    

  
  

 
   
  

   

 
   

   
   
  
   
 
   

 

Fann EXISTING SURFACE CONTOUR (0.50m INTERVAL) ~< “BE RL 10148
\ Y \ FL RL 101.75
OA, \ ,
M77 : AZ .. 3
os AY: BE RL 102.20. BE RL 101.60 BIO AND DETENTION
Oy, Gf “ \ FL RL 102.50 FL RL 101.90 BASIN JO BE FINALISEL
Y ; 2
veal f BE RL 102.25 . BE RL 101.70
1847 FL RL 102.55 BE RL 102.05 FL RL 102.00
Y
FL RL 102.35
1
dy 4 BE RL 101.85
“¢ of BE RL 102.10 FL RL 102.15

 

FL RL 102.40

 

  

POND AND DETENTION

 

 
     
    
 
  
 

     
  
  

  
 

 

 

 

 

  
 

 

 

    
 
  
 
  
   
 
   
  
    

 

 

 

 
 

 

BASIN TQ_BE FINALISEL
Ue fi
Ney =—
if BE-RL 102.30
es : FL RL 102.60 BE RL 106.75
i a7 eR. 108.28\. FL RL 105.05
7x, f aes BE RL 102.35
eS VA Me FL RL 102.65.
b— 5 BE RL 103.45 BE RL 101.9
Bit FL RL103.75 FL RL 102.2
zi fy Z / 7
U4 J

 

 

 

 

 

 

 

 

 

 

 

    

 

  

 

    

ND AND DETENTION

 
   

 
 

BE RL 102.55 BERL 102.05° | BE RL 103.10 | BE RL 103.10

  

 

  
 
 

 

JOBE FINALISED A I\| 4 i 3 / BE RL 105.20.”
{ ’ \ FL RL 102,35 4} FL RL 103.40 7) 7 FL RL 103.40 4 FL RL 105,50”
FL RL 102.85 h| | i Vig / | peal
; y Ay _ : a _L t
BE RL 102.75 fp Vf,
X |
BE RL 103.70

Ap | BE RL 102.45 BE RL 103.70 | BE RL 105.65
6 8 é

  

         
 
  
 

 

 

 

   

 

FL RL 103.05 Zh / 4
4 JX ; 2S IBE RL 103.30) BE RL 103.25] BE RL 103.1 FL RL 102.75 Yo FLAL 104.10 || ST 7) FL RL 106.10 FL AL 105.95
7 | . FL RL 103.60/FL RL 103.55/FL RL 103.4 a J NWN oe 7
f BE RL 102.69\> : : z AN Se |
Dy FL RL 102.95 j A 2 Nye 4 Ae
yg eS . BERL 102.90 | BE RL 104.20 4 BE RL 104.20 |} BE RL 106.05
G . FL RL 103.20 | FL RL 104.50 FL RL 104.50 FL RL 106.30 j|
FL RL 104.65 Venue DA BN A aoa. |
fxr & AL z. - .
J

 
   
  
     
   
 
 
    
 
  

 

 
  

 

 

 

 

 

 

    
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/ N& | ce re 103.30 | Be RL 104.75 BE RL 104.75 | BE RL 106.45 |
gee “6 AO) FL RL 103.60] FL RL 105.05, FL RL 105.05 FL RL 106.75
e a tae BE RL 103.30)BE RL 103.25/BE RL 103.15) S| | | / ge q / 4 tha
. FL RL 103.60/FL RL 103.55]FL RL 103.49) 1S i z é

oy, BE RL 103.60 Wha : IJ N87) Be RL 103.75) BE RL 105.35 BE RL 105.35 BE RL 106.70 [

L/ Ur 1 J} FURL 104.05 ) FL _RL 105.65 FL RL 105.65 FL RL 107.00 |
7 7 | es \ Ko \ q
oy BE RL 103.50 a ; A IN Re Rath LY.

EL RL 103.80 IBE RL 103.35BE RL 103 SBE RL 103.55]BE RL 103.79) \!) 4 { & 4 ¥ 1

FL RL 103.65/FL RL 103. FL RL 102.85/FL RL 104.09) | ft | BE RL 104.10 i] 88 RL 105.90) /N\ar| BE RL 105.90 BE RL 107.30 |

Ne 7 y y i || FLRL 104.40 4 FL RL 106.20 7 [FL RL 106.20 FL RL 107.60
es — Ye bo | \ a oY
i _ “7 _ , 2oN MS ae YY oS y x N S64

7 > x Ss SSIS ISS ISS
Fe 2 A EEE EEE EEE EE Bok oh
i ie s SS SSS Fs

 

 

   
    
   

BE RL 103.15 BE RL 103.20 BE RL 103.25
FL RL 103.45 FL RL 103.50 JFL Rb 103.55

CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES

BE RL 103.35/BE RL 103.45) BE RL 103.50)BE RL 103.60)/BE RL 103.85)BE RL 104.208 RL 104.65|BE RL 105.30)BE RL 105.90)BE RL 106.50/BE RL 106.90/BE RL 107.20)
FL RL 103.65/FL RL 103.75) FL RL 103.80FL RL 103.90/FL RL 104.15/FL RL 104.S0{\FL RL 104.95jFL-RL 105.60}FL RL 106.20/FL RL 106.80/FL RL 107.20jFL RL 107.5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

o
. ee ves \ Gigs
LE, B14158-SKOLdwg “DATE: 18-12-2086, TNE 1s 2, 2
cet’: X_BI41S8_TITLE X_BI4ISB_BASAX_BIHS8_ CONS USR: nathdn taylor by 2
Fret [once [onava] OATE orsran omen ‘SCALE (METRES T WICROFILM fo, CHIENT a DRAWING TITLE
‘AMENDMENT DETAILS: SURVEYOR: KEN HICKS & ASSOCIATES
BR DR De wat | RTS RS 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT coe AUSTIALA BULK EARTHWORKS
Mie - 1500 10 50 10 20 M1 Ph (07) 5443 2844 Fax (07) 5443 7146 | vi LAYOUT PLAN
i 1.1000 3 Li .
plc DRAWN CHECK PROJECT No. ‘APPROVED ANDREW NGO RPEQ 12379 PALM LAKES - COOROY lio Calibre Consulting (QLD) Pty Lid SHEET 1 OF 2
Yb ‘ Eevee
te B14158 aA RETIREMENT VILLAGE Caliore ieee eet See [aR =
siF FOR_& ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD CONSULTING Biskans Caner ldboorm Sydney Sippo Semstout Lic bt B14158-SK01 A

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 33

 

 

 

 

 

 

 

 

7 “104
él RL 104.70

of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
  
  
  
  
   

 

   
 
      
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FLE: Bts1S8-SKO2.dwg_ DATE: 18-12-2014 TIME: 1641
Pxref’s: X_BIS158_TITLE X_B14158_BASE X_BI4158_CONTS USR: nathan taylor

 

 
   
  

FLOWS TO BE PIPED

 

CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES

 

 

 

OVERLAND FLOW PATH.

  

 

 

 

Tne ay

7

 

ULL \

aL Te Woe

ra Arcee

bs 3 ae

lp i 1 I)
Ho | = S
ar — Rohe
- v 12 HAS MUM Fee
AN | Bees
WETLAND AND DETENTION SoS== th
BASIN TO BE FINALISED 3
20 || KY | BE RL 105.20 | BE RL 105.65.
50° . FL RL 105.50 FL RL 105.95
pr Na’ :
oO | a
tN |
| IN& As |! =~
B65 ! BE RL 105.65 pert 1059s! 1S} V ge et 106.00
95 ANAT) FL RL 105.95 FL RL 106.25 Lg] FLRL 106. 30
SA , N ie
= Nae 3 IN | t ) “VS Z
05 ff BE RL 106.05 BE RL 106.30 |) ' NAP]! BERL 106.30 BERL 105.50 | BE RL 105.50 BE RL 105.70 { BE RL 105.70
30 {| PLA | FL RL 106.30 FL RL 106.60 | 1°) 71 FL RL 106.60 | FL RL 905.800 4] SY |” FL RL 105.80 | FL RL 106.00 7 FL RL 106.00 ee
ON BU ; v3 oN z % ' [ha ae See FL RL 106.20
‘ : a : ses 1 NYS
di 14 VY Gy + || | ve |
45 }\ BE RL 106.45 BERL 106.65 |) 4} BERL 106.65 | BERL 105.90 | | \.4| BERL 105.90 | BE RL 106.00 |’ BE RL 106.00
75! Ng “FL RL 106.75 FL RL 106.95 4°) SFL RL 106.95 FL.RL 106.20 M)J >, FL.RL 106.20 FL RL 106.30° | hh} FL RL 106.30 BE RL 105.95
thi St / NC \ N . | \é I Bp SZ NA | FL RL 106.25
Var NS Seo eae '
s SY | | ys aA x WNvsy SN | | 5
0 Tot | BE RL 106.70) BE RL 107.00 >| BE RL 107.00 BE RL 106.40 {| BE RL 106.40 BE-RL 106.25 | |S) 4] BE RL 106.25 ;
00 || INSP FL RL 107,00 FL RL 107.30 > FL RL 107.30. FLRL 106.70 [| FLRL 106.70 FL RL 106.55 YAT | FL RL 106.55 BE RL 106.10
1 i ? ys ¢ Kat : FL RL 106.40 1
LIS fT vi YS : IN ¥ | Le
a BK < iN el Mi 7 2
30 _BE RL 107.30 BE RL 107.30 AF | BE RL 107.30 BE RL 106.80 ; BE RL 106.80 a” | BE RL-106.50
$ | | 7 2 |
60 ey FL RL 107.60 FL RL 107.60 ih 1 [A FL RL 107.60. FLRL 107.10 | |g] FL_RL 107.10 et a ne | | | FL RL 106.80 Ee e matey \ lee
2) 1 | see YALL \it Hoe iat i :
RX «|x SS yy Sa = z = j Ea yy Sih
a = 5 = ts ——e ALB
TS _ s a 7 a a 7)
B48 a == a
| Woke
\ i ah ee Aah
RL 107.20]BE RL 107.40)BE RL 107.55)BE RL 107.50]BE RL 107.40/BE RL 107.30]BE RL 107.20)BE RL 107.10|BE RL 106.95|BE Rf 106.85 8E RL 106.75/8E RL 106.65] BE RL 106.55BE RL 106.45)BE RL 106.35BE RL 106. Be Wl tS
RL 107.50]FL RL 107.70|FL RL 107.85/FL RL 107.80/FL RL 107.70|FL RL 107.60]FL RL 107.50/FL RL 107.40/FL RL 107.25]FL Rb 107.15 FL RL 107.05 FL 5 106.95) FL RL 106.85FL RL 106.75|FL RL 106.65FL RL 65H oo$ ee cody
;

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUT HATCH
FILL HATCH

DESIGN SURFACE CONTOUR (0.20m INTERVAL)
EXISTING SURFACE CONTOUR (0.50m INTERVAL)

  
 
       
  
 
  
      
           
      
  
   
  
  
  
       
 
         
    

 

Fusst [CALCS [oRAwa] _OATE
NT [NT [26.8

 

AMENDMENT DETAILS:

DESIGN CHECK|

 

NT_[-NT_[ 18.12.14 [AGED CARE FACLITY AND CAR PARK ADDED.

 

1500 10

‘SCALE ( METRES) WIGROFILM No.

50 10 20 At

 

 

DRAWN CHECK|

 

 

 

 

 

 

 

 

@4zmz0zmE>
me] o] | >

 

 

 

ssi000

AB PROJECT No.

B14158

 

 

SURVEYOR: KEN HICKS & ASSOCIATES
49 THE ESPLANADE MAROOCHYDORE
Ph (07) 5443 2844 Fax (07) 5443 7146
‘APPROVED ANDREW NGO RPEQ 12329
GRANT HALCROW RPEG 12509
MATTHEW HILL RPEQ 11578

 

FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD

PALM LAKES RESORT

PALM LAKES - COOROY
RETIREMENT VILLAGE

 

Cc

calibre

CONSULTING

 

oS BULK EARTHWORKS
Dy LAYOUT PLAN
Smee Se bare OE
SE teen naar eee smear Sei B14158-SK02 A

 

 

 

Page 34

 

FOR CONTINUATION REFER INSET

~ .
\ \

MN)

“7 145 SS SASS SA
25 Wp Vag

My
L
7
/
N

    
  
 
 
 
  
   
   
 
  
 

YT

 
 

 

 

 

 

 

SSA “
PQ J
SSW SX 5 :
LNA °
SNS \ ¢
Ss
WY SQ, oN
NNN SS SEDIMENT FENCE ALONG EXISTING
WSS BOUNDARIES
SSS
| a
7
Ixy STORMWATER BASIN TO BE
ON UTILISED AS A TEMPORARY
aN VY SEDIMENT BASIN DURING THE
ne ~~

CONSTRUCTION PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

iN
IK
[ay
uw
aa
Ww
Oe
i
Lu
[ay
Oe
Zz
io
\ q
SEDIMENT FENCE ALONG EXISTING | s
BOUNDARIES 70 IN aT 67 54 |3
= VSS _
4 Wha Zz
j A U j Ss
\ val “ < 66 55 ja
4 L x4 V ZL
q ef | q
y Sl 65 56
4 ake
4 |
\ VI} xs
i 73 v KS 64 i 57
s Ks
| |
Me
ml n
H 74 i xs \ 63 7 8
Se Ses
£ & ere PSS o e ar al t & “A
=4 CL fos = ay
- S 105 104 103 102 101 100 7 76 75 62 61 60
. . CONCEPT PLAN ONLY yo™
\ NOT TO BE USED FOR NN
\¥ CONSTRUCTION PURPOSES ) \, fe
SS : , S DSS SS = = SS = == == u
peer tie RNEP R TN os  na tl y ur va ae in is vst vat vn a
Fast [once [owe] —onTe SCALE METRES TICROFIEW Wo TUENT DaRWNG TIE
foal AMENDMENT DETAILS DESIGN cHECK SURVEYOR: KEN HICKS & ASSOCIATES
mee | | Baie 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT on nn EROSION AND SEDIMENT CONTROL
Mp 1500 10 5 0 10 20 M1 Ph (07) 5443 2844 Fax (07) 5443 7146 | vi LAYOUT PLAN
sie Drawn cncex]| 120° A3 7 proscar ma ['ARRROVED yw a a PALM LAKES - COOROY lio Cali Consuing (OLD) Pty Ld SHEET 1 OF 2
“> GRANT HALCROW RPEQ 12509 ae Aa 4101 ead
B14158 RETIREMENT VILLAGE callore Ll a a STO aa
i F FOR & ON BEHALF OF CALIBRE CONSULTING worn “ee CONSULTING i oii ease oa B14158-SK03

 

 

 

 

 

 

 

 

Page 35

 

       
       
    
 
 
 
 
 

SEDIMENT FENCE ALONG
EXISTING BOUNDARIES

    
     
    

 

 

 

 

 

 

 

SEDIMENT FENCE'ALONG)
EXISTING BOUNDARIES

 

 

 

 

 

 

 

4 BeELIE wt
iE ananaaae

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

       
 

 

 

 

 

   

 

hi
H "
hs + pgs WA X
N il
STORMWATER BASIN To BE > }p—-4—---«-----------4-. 3_-__ \..
UTILISED AS A TEMPORARY “ 7 Hee i aa 77 yo
SEDIMENT BASIN DURING Te | . i} i na BE
CONSTRUCTION PHASE ff] Ss 5 {aah d(aehe aa
| 3 re m
BSL RO
| i ——
T
_- Boo een Rn GHOSE Snr au eeX. ee _ ‘
esa | I - NE iy MT PPh VT ~TN iq A 7 4
aoe — SNS WH ane aahdaza diy 7
eG VR SS sate
Saree
13 Cr 14 1 Re sll
4 | N\& | chit iy 7 > 1
AM VBR Oe Lae 1 < #
14 ha i 2 | il Ho ice icghdidahg 7
» \ | \ é (et ya qf PPE f
yf 4 Mi MO Taty
6 NTT, 1 » || | / th saan
US is
Nf vi bette U
| | s 4 - iy = +
yy BY) ar 42 ak nh 32 28 Ng 21 16 i) i 9 4 | Wa a” meee /
Noo Alt fs cI b———~—3}/\/AL_ Le Wk yi | 8 So pe
qe Se eee aa hte
| 46 eg ge Be ° qr
i iat i ced
i i roa) iia oo ;
ee — 7
tS a7 (Bo
59 46 4 5 eet
a

 

 

 

 

 

 

 

: SEDIMENT FENCE ALONG

EXISTING BOUNDARIES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\ J vez vs 3
p— Be st — gr — — —0t- — —ust —
CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES
FILE: B14158-SKO4.dwg DATE: 18-12-2014 TIME: 16:44 _
IXref's: X_B14158_TITLE X_B14158_BASE X_B14158_CONTS USR: nathan taylor “
rast [ence pum] one vanan Gmc TERETE TIGROFI Wo oer wn TaaNS TLE
AMENDMENT DETAILS SURVEYOR: KEN HICKS & ASSOCIATES
mei LM fea 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT ‘CONSULT AUSTRALIA EROSION AND SEDIMENT CONTROL
Mp 1500 10 5 0 10 20 M1 Ph (07) 5443 2844 Fax (07) 5443 7146 | vi LAYOUT PLAN
ie saan Gace *1000 a3 PROJECT Ne. ae oe Re me PALM LAKES - COOROY Cc aliobre Ca ag Ly asl SHEET 2 OF 2
ile B14158 MATTHEW HLL RPEO 1578 RETIREMENT VILLAGE Leal GaSe ee Say [INE KER
SlF FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD CONSULTING ‘ister Cenbera Webourm Sydney Singepom SumiineCont = Lic 4064 B14158-SK04

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 36

 

  
 

FOR CONTINUATION REFER INSET LEGEND

      
  
   
   
   
  
   

 

 

 

 

 

 

 

 

    

Liz; ES A 7
4S WX FOR STORMWATER S A) -- PROPOSED EDGE RESTRAINT KERB
ZZ NX BASIN DETAILS REFER
YZ EZ ZFS SSNS B14158.W DRAWINGS 5 Sw0- Sw PROPOSED STORMWATER DRAINAGE
GZ Ye ER SN RW y Ra. Rw PROPOSED ROOFWATER DRAINAGE
~
YY, ZL SS AX — so — sn — EXISTING STORMWATER DRAINAGE
‘Lif WSS
4544p) SSS ROKK OFS NOY ND KES NOD fe DESIGN SURFACE CONTOUR (0.20m INTERVAL)
4% Yy \VS WS -=----=-------- EXISTING SURFACE CONTOUR (0.50m INTERVAL)
“Yi; WYN SS
“uy WSS
LLL SS
: y,

  

 

 

 

 

 

FOR STORMWATER
BASIN DETAILS REFER
B14158.W’ DRAWINGS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FOR CONTINUATION REFER SHEET 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

\ 107
oN CONGEPT PLAN ONLY SK exists stornwarer 105 7oa | 103 | 102) 101) 100! 7 76 75 62 61 60 5
‘ é NOT TO BE USED POR XS DRAINAGE TO BE PIPED
,
\ CONSTRUCTION PURPOSES THROUGH DEVELOPMENT.
: a Z
FILE: mandy 98-12-2094 TIME: 16:44 -
Xref's: X_B14158_TITLENY_Btsi58 “BASE X_B14158_CONTS USR: nathan taylor
Tat [once ua] Oa Tuan Gok SORE METRES TORGTTT SORT SAAT TE
AMENOMENT DETAILS SURVEYOR: KEN HICKS & ASSOCIATES ar
mee | | Baie 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CONSULT AUSTHALA ROADWORKS AND DRAINAGE
te 150 19 50 0 a0 at Ph (07) 5443 2844 Fax (07) 5443 7146 P——__ DT LAYOUT PLAN
ge a RO) mowerte PRET piney Ae a PALM LAKES - COOROY Calibre Cab ai LD py 7 SHEET 1 OF 2
ANT HALCROW EO ‘
we B14158 Ae RETIREMENT VILLAGE eerie anata See AINE Ra =
slr FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD CONSULTING Bitans Cnbera boom Syiny Siegen SemineCot = LicdObh B14158-SK05

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 37

 

  
   
  

 

 

PROPOSED EDGE RESTRAINT KERB

PROPOSED STORMWATER DRAINAGE

PROPOSED ROOFWATER DRAINAGE

— —sv0—= — —ssb-— — EXISTING STORMWATER DRAINAGE
SOOO DESIGN SURFACE CONTOUR (0.20m INTERVAL)
nen EXISTING SURFACE CONTOUR (0.50m INTERVAL)

 

 

 

 

 

 

 

 

 

 

 

 

   

  

FOR STORMWATER
BASIN DETAILS REFER
B14158.W DRAWINGS

 

 

 

 

i
ji!
His 5 aoe zl ici)

2 Rae

Kr 3

 
  
 

  

 

 

 

 

 

 
 

 

 

 
 

 

 

We e RT
Nf x 7 ] 4
Ks eae lacked Liz

Wk em pe Aa
i } PEt i } a
caayN Oe vf he

|

|

|

}

|

L MN _J |
SH 4 q ae 3 ua
Z|

|

|

|

 

 
 

 

 

 

 

 

 

 

 

   

  

 

 

 

 
    

 

 

i AYN | 7S
NVC ES | a
- A wal eam

 

 

 
 
 

 

 

 

 

 

 

 

 

   

ae Taz im

\
“yo
4 4 "1 2 \ tae bicaihia

es Mj Pret 7
bh ary TAT h a

39>

 

 

 

 

FOR CONTINUATION REFER SHEET 1

 
    
 

 

 

 

 

 

 

 

NA | ia 3
ia is 15 10 3 hy | by | 1
eeu tN Aq IT a ‘i wo Ty ZL,
e I aS 1) 7 a -
se oD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

é ie

iit

 

og an

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

rg er x ¥ a oa W
2 rt
iz ES 7 ig wl
Poes ri
7 4
L Z|
f ma
KX
EXISTING STORMWATER —
DRAINAGE TO BE PIPED
THROUGH THE DEVELOPMENT
\
CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES
Le, BUISE-SKO6.dug_ DATE: 18-12-2014. TIME. 145
Xref’: X_B14158_TITLE X_B14158_BASE X_B14158_CONTS USR: nathan taylor §
Frat [ones navi] —OxTE Tealaw moe SORE METRES os SUNT wa DRAWING THLE
‘AMENDMENT DETAILS: SURVEYOR: KEN HICKS & ASSOCIATES
aap 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CONSULT AUSTRALIA ROADWORKS AND DRAINAGE
a 150 ws io 2 at Ph (07) 5443 2844 Fax (07) 5443 7146 [| DT LAYOUT PLAN
N 4.1000 AR [arprow> H
plc DRAWN CHECK PROJECT No. ‘APPROVED ANDREW NGO RPEQ 12379 PALM LAKES - COOROY | b Gale Coing (0.0 pay SHEET 2 OF 2
u
ile B14158 oat we RETIREMENT VILLAGE callore ieee eet See [aR a
Sir FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD CONSULTING Biktere Cebera Uaboerm Byiray Singpom SemiinsComt — LicAD64 B14158-SK06

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 38

 

iref's
FRET

 

FILE: B14158-SKO7.dwg_ DATE: 18-12-2014 TIME: 16:45

DATE

158

X_BIb158_TITLE X_B1458_BASE X_B14158_CONTS USR: nathan taylor

 

OPTION 1
GRAVITY SEWER INTO EXISTING MAIN

OPTION 2

PUMP STATION AND RISING
MAIN TO EXISTING SEWER IN
TRADING POST ROAD

FOR CONTINUATION REFER INSET

   
     
 
   

 

 

 

 

 

 

 

 

 

 

   

LEGEND

 

 

 

 

 

. 7
JOIN TO EXISTING SEWER
IN TRADING POST ROAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES

 

 

 

 

PROPOSED EDGE RESTRAINT KERB

PROPOSED SEWERAGE RETICULATION OPTION 1
PROPOSED SEWERAGE RETICULATION OPTION 2
EXISTING SEWERAGE RETICULATION

DESIGN SURFACE CONTOUR (0.20m INTERVAL)
EXISTING SURFACE CONTOUR (0.50m INTERVAL)

 

 

 

T.i2.t

AMENDMENT DETAILS:

DESIGN CHECK|

 

 

11000

‘SCALE ( METRES 7

 

DRAWN CHECK

 

 

 

 

=o] oe] >

 

O4zmE0zm=E>

 

 

 

 

 

 

2000

 

WIGROFILM No,

PROJECT No.

B14158

 

SURVEYOR: KEN HICKS & ASSOCIATES
49 THE ESPLANADE MAROOCHYDORE
Ph (07) 5443 2844 Fax (07) 5443 7146
APPROVED ANDREW NGO RPEO 12329
GRANT HALCROW RPEQ 12509
MATTHEW HILL RPEQ 11578
FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY L1D

 

“CLIENT

PROJECT

PALM LAKES RESORT

Cc

caliore

CONSULTING

PALM LAKES - COOROY
RETIREMENT VILLAGE

 

~~

CONSULT AUSTRALIA

we?

Calibre Consling (QLD) Ply Lid aly
Level, 199 Grey Ses, Sou Biche GUD Aina 4101

TWlghona 07 3895 3444 Focinile 072895 3400 STERN
(Bdabane Cenbera Uaboorm Spinay Singepom SumiireComt = Lic 4/64

 

SEWERAGE RETICULATION
LAYOUT PLAN

 

‘DRAWING NUMBER TSE

B14158-SK07

 

 

 

Page 39

 

   
 

PROPOSED EDGE RESTRAINT KERB

PROPOSED WATER RETICULATION

PROPOSED UPGRADE OF EXISTING WATER RETICULATION
EXISTING WATER RETICULATION

EXISTING WATER RETICULATION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FOR CONTINUATION REFER SHEET 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONCEPT PLAN ONLY 105 104 103 102 101 100 7 76 75 62 61 60

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\ NOT TO BE USED FOR
x CONSTRUCTION PURPOSES
LE: B14158-K08. dug on TIME 6
prefs: X_BIs158_TITLE X_BI4ISBRASE X_BIsIS® CONTS USR: nathan taylor
Fist [ALCS [ORAW] _ DATE pesien neon ‘SCALE (METRES T WIGROFILM No. ‘CUENT aN ‘DRAWING TITLE
‘AMENDMENT DETAILS: SURVEYOR: KEN HICKS & ASSOCIATES
af 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CONSULT AUSTIALA WATER RETICULATION
Mie 1500 10 50 10 20 M1 Ph (07) 5443 2844 Fax (07) 5443 7146 | vi LAYOUT PLAN
x | = om
ae Sanwa ono} 11200 B PROJECT No. APPROVED “aey oe an PALM LAKES. “yFOQROY calibre SE ann nt SHEET 1 OF 2
E i ‘DRAWING NUMBER TSsue
Ale B14158 MATTHEW HLL RPEQ. 578 Teights 07 39953444 Facile 07 39963400 SS™BEN
Sir FOR_& ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD CONSULTING tare cater oem Dey emin tiscat oat B14158-SK08

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 40

 

  
 
    
      
  
 
 
 
      
    
            
  
    

JOIN TO EXISTING MAIN

 

LEGEND.

PROPOSED EDGE RESTRAINT KERB

PROPOSED WATER RETICULATION

PROPOSED UPGRADE OF EXISTING WATER RETICULATION
EXISTING WATER RETICULATION

EXISTING WATER RETICULATION

 

 

 

 

 

 

 

 

 

  

 

 

 

 

cilapibki ie
qPITaT ET

ts

 

 

an

 

 

 

isola

= Bhs ides TELIDE

 

 

ictal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|
jgahd le |
a ig pela ae a |
- pore
- a 1
[ea] 1 =
= | SS Pi FT eTRL i |
oe = \I] ody Eberle ea tia les | JOIN TO EXISTING MAIN
7 3 Peery] Lo
“ LE ld | i ‘f | UPGRADE EXISTING
Bil 50 i 35 25 ii 24 3 ; 12 1 a \ OT MAIN TO 150B
oe rl Lid it Lot ' \,
3 1 | | 1 | 1 1 1 1 1 pat. meee q |
Sli l ef 49 40 | 34 26 | | | 23 14 | 1 2 | | a aie \ \ :
olf! ' ' 1 1 1 1 1 1 epee
oa ' i ry 1 | 1 1 | 1 Hy q 1a “| | \
ol] ) || | Lif oo Jot ht :
wy da 48 41 | \ 33 27 22 15 10 3 | t i
po 1 (J ido tt oe —~ 77
I ' fe 1 H 1 | 1 1 | Wy 2 H T see H |
os Diy totals i 1 ~
42 8 ! 1 4 [ro Z
| 47 ] 32 2 | : 21 6 9 } | 3 Peceacrnre as | [ [a
C
Sa | See SSS ree OUT UF ng
“at _ —_ ae a i a a i __ —_ __ a _ oie 1
= - : z 5 - : 5 | |
TTR pay at Bs
AL 4. i Lt 4 H Bl
Ee ieab tle hdd gable hdtgahd att
Pe gs ie oe
! 46 45 44 43 31 30 29 20 19 18 7 8 7 6 5 pa pa het | fp
IH BK Fig |
oo BS | [ [ <
l L
Let pd
)
aA \\
\
CONCEPT PLAN ONLY
NOT TO BE USED FOR
CONSTRUCTION PURPOSES
ue, Bu 8-Skts dug. DATE: 18-12-20% THE: 46
IXref's: X_B14158_TITLE X_B14158_BASE X_B1G158_CONTS USR: nathan taylor
wef wr [wf — “_ 1p Tae. SPL ANADE HAROOEHYDORE. PALM LAKES RESORT C on nn WATER RETICULATION
Mie 1500 10 50 10 20 At Ph (07) 5443 2844 Fax (07) 5443 7146 — vi LAYOUT PLAN
gic raw onzex 007 7) moseor na | AFRROWED woe wea E08 PALM LAKES - COOROY i Cal Cn 0 = SHEET 2 OF 2
: D GRANT HaLcRoW RBEQ 159 RETIREMENT VILLAGE Ca | re Se has Ak 1 k ‘DRAWING NOMGER TSS0E
a B14158 FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) OLD “ee CONSULTING Wp st Pe oa B14158-SK09

 

 

Page 41

 

10.20

| 1

1.60 5.50
Sunshine Coast WCV
meters
Width » 2,50
Track » 2,50
Lock to Lock Time 6,0
Steering Angle » 313

 

 

 

 

 

 

 

 

 

 

 
  
 
  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

   

  

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

“(hes

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

=|
aa

 

 

  

id

 

E,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E; BIWI58-SKI0.dwq DATE: 18-12-2014 TIME: 10:12
ref’s: X_BIbIS8_TITLE X_Bt41S8_BASE X_B14158_CONTS USR: nathan taylor

 

 
   

 

   

 
 
 
 

 

 

 

 

 

1000 10 0 102030450

 

 

 

O4zmE0zm=E>
mol ole

 

 

 

 

 

 

 

 

 

 

WIGROFILM No,

PROJECT No. "APPROVED,

B14158

 

SURVEYOR: KEN HICKS & ASSOCIATES
49 THE ESPLANADE MAROOCHYDORE
Ph (07) 5443 2844 Fax (07) 5443 7146

PALM LAKES RESORT

"PALM LAKES - COOROY
RETIREMENT VILLAGE

caliore

GRANT HALCROW RPEQ 12509

 

 

FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD

one, TURNING PATHS
ws SHEET 1 OF 4
a =
Sorta ten ares semeer Sea B14158-SK10

 

 

 

 

 

Page 42

 

10.20

  
 
 
 
 
  

 

 

 

 

 

 

 
   
   
   

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

\
4 °
I I
1,60 5,50
Sunshine Coast WCV
meters
Width » 2,90
Track » 2,50
Lock to Lock Time 6.0
Steering Angle 1313
VEHICLE BODY = GREEN
REAR TYRE = BLUE
FRONT TYRE = ORANGE
’
conta a PBs oh —— _=— re
Fast [ons [awe] one Tsun Omen SORE T METRES aTCROFIN We TUENT DARWIN TIE
AMENDMENT DETAILS SURVEYOR: KEN HICKS & ASSOCIATES ar
af 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CONSULT AUSTIALA TURNING PATHS
te 12505 0 5 oat Ph 107) 5443 2844 Fax (07) 5443 7146 fo iD SHEET 2 OF 4
se Drawn onzox] 150° A3]—proseor na [APPROVE TNoREW Neo fea es PALM LAKES - COOROY lio Cali Cons
8 - ng (QLD) Py Lid =
se Bi4i58 mania ea ee RETIREMENT VILLAGE callore ilmenite Se [a =
AG FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD CONSULTING Biktere Cebera Uaboerm Byiray Singpom SemiinsComt — LicAD64 B14158-SK11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 43

 

Sy Ep fF en PE oh fe
a H loan’ Pda S | Zuma S | 2 10.20
a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ba } | | Sunshine Coast WCV

 

 

 

 

 

 

 

 

 

BO le < +
, am, mm a 7s meters
< g Bead Lapebaa apse Le Wiolth 2.50
L. ZF} roa, TF a ZB} ro. fe Track + 2,50
| » A PEL te [Ry | Lock to Lock Time 6.0
i * (= oar a ¢ Steering Angle 1313
} |
ee ee
| — i |
' 1 ! c 7 |
1 1 ' | |
1 1 fe bee we? | ar oto <~s|
1 1 4
9 OEY | pea Lag NS pa Lod

EPL ctf PEE Lc PE cf PEE tf OR

on Celie siesta. Cssictin Ens

VEHICLE BODY = GREEN i Li iL _tl Lo
REAR TYRE = BLUE \ 1 : [ I
FRONT TYRE = ORANGE 1 1 ,

 

 

 

|

 

 

baa S01 pete EW T apa PT pec SET ap

 

 

 

 

 

4

 

 

PY [Pay on IE Fy aR | PEP | OE]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

hon. sa los ast, sa
—_, , tan ssa | 5
7 XN |
_—— -- -- -- -- I I [ J | 7
Pood
- - - - - - - - - - - - | L
|
-- -- -- -- -- -- -- --
|
Lo ae ia ae owe? a oer
ws) GL pepe ay ee pep Leap bce Lp ho
PQ pt [ Pair
TF I “Ty A Ss
Doe foo mo a
| oO ay co
a Bo a
Hb bo & BX
E Er a g
ra bs =
| 2 S [
[- we df — —_,- P+
| M1 vit)
FILE: B14158-SK12.dwg DATE: 18-12-2014 TIME: 17:18
PXref’s: X_BIS158_TITLE X_B14158_BASE X_B14158_CONTS USR: nathan taylor cc ,
raat [ees [owe] on Tuan Gok SORE METEET TISROFN er STENT wr TRAINEE
AMENDMENT DETAILS SURVEYOR: KEN HICKS & ASSOCIATES
af 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT CONSULT AUSTIALA TURNING PATHS
“3 2505 0 5 wat Ph (07) $443 2844 Fax (07) 5443 7146 Po er SHEET 3 OF 4
nN 1500 AR [arprow> H
sie DRAW HEEK prosecr no, [ARRROWED TNoREW Neo fea es PALM LAKES - COOROY lio Cal ConsingQL0) Py Ld 2a
a "
te B14158 an ea Be RETIREMENT VILLAGE callore ieee eet See [aR
siF FOR_& ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD CONSULTING Biktere Cebera Uaboerm Byiray Singpom SemiinsComt — LicAD64 B14158-SK12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 44

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

= sears

PeTereT et

Es :
ATaTiTe

LILI,

aaa

 

 

 

a

ay

Bj

ra

EP

oe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
  
  
  
 
 
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B14158

 

MATTHEW HILL RPEQ 11578
FOR & ON BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD

 

 

CONSULTING

ne 073895 3444 Facile 07 36953400 SREY
‘Edstane Canberra Usboorm Spinay Singepom SumiireComt = Lic 4/64

 

 

B14158-SK13

 

a a
I \ /
— rr \ /
H
om er or /
bu a fig j Leb \ /
/
ee /
oH co roHH Ft | JL
| ra Bs 4 FAC /
[ tae : 3 /
6 #1. 4 | /
/
| Tv /
- CL. < /
\ /
— \ L
— \ J
\ /
> /
4 :
/
10.20 VEHICLE BODY = GREEN /
REAR TYRE = BLUE J
FRONT TYRE = ORANGE J
/
| | /
/
160 5.50 /
/
Sunshine Coast WCV J
meters / J
Width 12,50 JL
Track » 2.50
Lock to Lock Time 6.0
Steering Angle » 313 L
Jf
FILE: B14158-SK13.dwq DATE: 18-12-2014 TIME: 17:21 AK o
Xref's: X_B14158_TITLE X_B14158_BASE X_B14158_CONTS USR: nathan taylor \
aot [eacce [raw] one camnouwy outane casian oncom SORE T METRES T THCROFEN Nos SURVEYOR KEN HICKS & ASSOCIATES TUENT > DRAWING THE
af 49 THE ESPLANADE MAROOCHYDORE PALM LAKES RESORT C CONSULT AUSTIALA TURNING PATHS
Mp 1500 1050 10 20 At Ph (07) 5443 2844 Fax (07) 5443 7146 — vi SHEET 4 OF 4
B[c Drawn cnecx| 170° 8 PROJECT No. ‘APPROVED ANDREW NGO RPEQ 12329 PALM - il Cale Con (QLD)
ie GRANT HALCROW RPEQ 12509 AM LAKES yg ghoy calibre i So a i 4101 ctl ‘DRAWING NOMGER TSSUE
S\F

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.