Appendix F - engineering report
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application F - Engineering report Email 7 of 8.
CALIBRE CONSULTING
14.120 Effects of Works
Acceptable Solutions (if self-
Specific Outcomes assessable) Proposed Measures
Probable Solutions
(if code assessable)
an environmentally responsible OR
manner.
S5.2
Cleared vegetation is mulched onsite
and reused for landscaping of the
finished development;
OR
S5.3
Cleared vegetation is disposed of for
the purpose of firewood.
(Note: Disposal of vegetative waste by
burning off is not an acceptable
method of disposal).
Managing Contamination Risk
O6 S6.1
Materials used as fill are suitable for The fill material is sold clean earth, free It is proposed to aim for balanced
development of the land and filling of putrescible or refuse material, earthworks within the site. However, if
or excavation works do not result in vegetation, acid sulfate soils, building fill material is required, it will be
the contamination of land. or construction material or other investigated by geotechnical engineer
material of contaminants. to ensure that it is satisfactory prior to
OR placement.
S6.2
The site is not on the contaminated
land register.
Haulage Activity & Amenity
O7 7.1
Haulage of material to and from a No solution provided. Refer to O6 above - Haulage will be
site ensures: undertaken with due consideration to
(a) minimal disturbance to residents and Council’s infrastructure.
neighbouring properties and
properties along the haulage
route; and
(b) Council’s road infrastructure
including pavements is not
adversely affected.
Extent of Earthworks
O8 S8.1
Earthworks are contained within the All earthworks, including cut and fill Cut and fill batters will be contained
site. batters, retaining walls etc are within the site boundaries.
contained within the subject site.
O9 S9.1
On sloping sites, excavation, or Cut or fill is less than 2m in depth Cut or fill will be less than 2m in depth
filling are designed to maximise the relative to the natural ground surface. relative to the natural ground surface.
use of natural slope and minimise
the need for cut and fill.
Environmental Protection
O10 No solution provided. Earthworks will be minimised to limit
Earthworks minimise any adverse the impact on groundwater and
impact upon groundwater, watercourses.
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.