Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Reconfiguring a Lot Code - 10.02.2020

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

b)   any natural environmental values     AO7.2
      present on, or adjoining the
                                          Flood immunity for development areas is not achieved
      site;
                                          by filling land below the 1% AEP (1:100 year ARI) flood
c)   any natural hazards affecting the    level.
      site or adjoining land such that
      the number of properties or         AO7.3
      persons at risk is not increased;   All reconfigured lots on land subject to a constraint or
                                          valuable feature identified on an overlay map contains a
d)   the terrain of the land,             building envelope marked on a plan of development that
      minimising the need for
                                          demonstrates that there is an area sufficient to
      earthworks;
                                          accommodate the intended purpose of the lot, that is not
e)   any places of cultural heritage      subject to the constraint or valuable feature or that
      significance or character areas     appropriately responds to the constraint or valuable
      present on, or adjoining the        feature.
      site; and
                                          AO7.4
f)   any important landmarks, views,
                                          New lots with a site area less than 4,000m² in area have
      vistas or other areas of high
                                          a slope not exceeding:
      scenic quality present on, or
      able to be viewed from, the site.
                                               (a) 10% side slope (crossfall); or
                                               (b) 5% lengthwise slope (longitudinal fall).

                                          AO7.5
                                          Lot boundaries, services, utilities and roads are aligned
                                          to avoid traversing ecologically important areas and
                                          ecological linkages.

                                          AO7.6
                                          Development does not result in significant modification
                                          to natural landform or landscape features including:
                                              (a) waterways and drainage lines;
                                              (b) native vegetation or significant character
                                                   trees;
                                              (c) understorey vegetation;
                                              (d) slope;
                                              (e) rock outcrops; or
                                              (f) views.

                                          AO7.7
                                          Development retains or provides viable ecological
                                          corridors for wildlife movement.

                                          AO7.8
                                          Where no riparian buffer is nominated through the
Log in to download the original file

Reconfiguring a Lot Code - 10.02.2020.pdf · 670 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.