Skip to the record
Every meeting, every word.

Original source · versioned page text

Reconfiguring a Lot Code - 10.02.2020

of 9

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

          movement and open space                  public spaces and corridors easy to find and recognise.
          networks;
    (d)   effectively connects and integrates
          the site with existing or planned
          development on adjoining sites;
    (e)   provides for moderate and large
          size developments to have multiple
          access points;
    (f)   promotes a sense of community
          identity and belonging;
    (g)   promotes a variety of streetscapes;
    (h)   provides for a high level of
          amenity, having regard to potential
          noise, dust, odour and lighting
          nuisance sources;
    (i)   integrates prominent site features
          including landmarks, native
          vegetation and views into the
          design;
    (j)   discourages crime or antisocial
          behaviour by facilitating casual
          surveillance of streets, paths and
          public open space;
    (k)   avoids the sporadic or out-of-
          sequence creation of lots; and
    (l)   protects and enhances ecologically
          important areas and provides for
          the clustering of lots into cleared
          areas.
Infrastructure                                      No acceptable outcome provided.                          Complies.
PO10
Development accommodates and provides                                                                        Electrical and telecommunications connections are able to be
for the efficient and timely delivery of                                                                     extended to the newly created allotment.
infrastructure appropriate to the site’s setting
and intended use.
 PO11                                               No acceptable outcome provided.                          Not applicable.
 Roadway and pathway layout are
 predominantly rectilinear with a
 high degree of permeability.
Infrastructure and services
PO12 New lots are located, sized and               AO12.1                                                    Complies.
configured so as to ensure each lot is             All lots are connected to power supply and
                                                                                                             Electrical and telecommunications connections are able to be
Log in to download the original file

Reconfiguring a Lot Code - 10.02.2020.pdf · 670 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.