Bligh Tanner Consulting Engineers Page 5
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012
2 DESIGN OBJECTIVES
This chapter outlines the relevant stormwater management design objectives for site.
2.1 Stormwater Treatment Objectives
Stormwater quality is to be managed in accordance with the Noosa Plan Water Sensitive
Urban Design Code (Table 14-61).
Table 3 How the proposal responds to the Noosa Plan
Specific Outcome Probable Solutions Proposed Approach
Water reuse S1.1 Development complies Minimise ground-level
O1 Development uses a with the water quality standards impervious areas (i.e. slab on
combination of detention and in Table 2 of the SEQ Regional ground construction) to less
retention systems to capture Plan Implementation Guideline than 25% of the site area.
run-off from areas on the site; No. 7 for Water Sensitive Urban
AND Design; Capture and manage the first 10
O2 Water storage devices must S2.1 No solution provided mm of runoff from impervious
have sufficient capacity having S3.1 Captured water is plumbed areas, including:
regard to local rainfall pattern to be available for all external • capturing roofwater for non-
and the catchment area of roof uses including gardening, potable uses
or other hard standing surface; irrigation, ponds, filling • infiltrating excess water into
AND swimming pools and outdoor
O3 Captured water is utilised for cleaning, as well as all ground the soils to preserve the
all non-potable uses on site; floor toilet cisterns and washing regional hydrology.
AND machine cold taps;
O4 On-site detention does not S3.2 Where the captured water
adversely impact on water is used for toilet flushing and/or
requirements downstream of the laundry use, an automatic or
site where the water is required manual interchange device that
to sustain the ecology and allows alternate use of captured
hydrology of downstream water or the reticulated water
systems (environmental flows); supply is installed to ensure that
AND there is a continual supply of
O5 Within the Shire Business water for sanitary flushing and
Centre site, as shown on Map laundry use.
SBC, on-site detention S4.1 No solution provided
measures are contained within S5.1 No solution provided
the developed areas of the site,
clear of drainage lines and
Open Space Precincts.
Run-off treatment S6.1 & S7.1 Development Capture and manage first 10
O6 Run-off that leaves the site complies with the water quality mm of runoff from impervious
is treated so as not to adversely standards in Table 2 of the SEQ surfaces as per Table 2 of the
impact on the ecology and Regional Plan Implementation SEQ Regional Plan
hydrology of downstream Guideline No. 7 for Water Implementation Guideline No. 7
environmental flows; Sensitive Urban Design. for Water Sensitive Urban
AND Design
O7 Within the Shire Business
Centre site, as shown on Map
SBC—
a) run-off treatment occurs
within the site ; and b) drainage
lines are only used for final
polishing of run-off.
Town water supply S8.1 A suitable backflow
connections prevention device is installed to
O8 Backflow devices or similar protect the potable water within
Print Date: 2 March 2020, 2:19 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Storm Water management plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.