4 STORMWATER QUALITY ASSESSMENT
Modelling has been undertaken in accordance with Water by Design (2010) MUSIC
Modelling Guidelines Version 1.0 with the exception of the following:
• Forested parameters have been used to reflect the landscape areas—apart from the
turfed areas—in the post-development case, as there is no significant change to pre-
developed conditions.
Whilst the design objectives for the site (as outlined in Section 2.1) allow for the infiltration of
stormwater and do not explicitly require stormwater quality to be managed, given the
sensitivity of the receiving environment it is prudent to consider these impacts.
It is difficult to accurately estimate the impacts of the development on groundwater quality for
several reasons:
• The capacity of the in-situ soils to process stormwater pollutants, particularly the
denitrifying capacity of the soils and root zone, is difficult to estimate, and MUSIC
does not account for the potential retention or transformation of nutrients in natural
soils.
• The site’s sandy soils are far more permeable than the soils used to develop the
recommended rainfall runoff parameters outlined in the SEQ MUSIC Modeling
Guidelines (Water by Design 2010), and local calibration data are not available.
Permeable area parameters have a significant bearing on model results when
impervious areas are low (Water by Design 2010). For example, using a
recommended rainfall runoff parameters for a forested site results in an annual
volumetric runoff coefficient of 32% which is well above what would be reasonably
expected for this site a value of . Adjustments to these parameters in the absence of
calibration data would be somewhat arbitrary as they are calibration parameters and
not directly related to physical soil characteristics.
Notwithstanding the above limitations, using MUSIC in accordance with the recommended
guidelines produces the results shown in Figure 4 and Table 6 below.
A schematic of the MUSIC model configuration is presented in Figure 3.
Note that the architectural design of the site plays a key role in mitigating stormwater
impacts. If the site were to be developed as a conventional commercial development, and
the stormwater runoff was treated to current best practice standards using bioretention
systems, the runoff volumes and pollutant loads would be higher than those from the Noosa
Flexi Learning Centre even if there were no rainwater tanks or infiltration systems. In other
words the site, by virtue of the low impact design of the site, it will likely perform better than a
conventional ‘best-practice’ development.
This result highlights the logic of exempting development with low levels of imperviousness
from the stormwater quality load-based objectives.
Print Date: 2 March 2020, 2:19 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Storm Water management plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.