Bligh Tanner Consulting Engineers Page 13
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012
Table 6: Comparison of runoff volumes and pollutant loads
Conventional Noosa
commercial Flexi Noosa Flexi
Conventional with best Noosa School School with
commercial practice* Flexi with tanks +
Existing development bioretention School tanks infiltration
Flow (ML/yr) 2.9 7.8 7.6 4.6 3.9 2.0
Total Suspended Solids (kg/yr) 160 1300 270 330 300 150
Total Phosphorus (kg/yr) 0.19 3.0 1.2 0.8 0.65 0.22
Total Nitrogen (kg/yr) 2.1 25 14 7.3 5.5 1.9
* sized to reduce pollutant loads by 80% (TSS) 60% (TP) and 45% (TN)
Print Date: 2 March 2020, 2:19 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Storm Water management plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.