Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Storm Water management plan · MCU12/0133.03

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Noosa Council documents


                  Bligh Tanner Consulting Engineers
                  Noosa Flexi Learning Centre Stormwater Management Plan
                  August 2012



                             Extended detention depth (m)                                     0m
                                           2
                             Filter area (m )                                                 92.5 m²
                             Unlined filter media perimeter (m)                               n/a
                             Saturated hydraulic conductivity (mm/hour). This should          180 mm/hr
                             be modelled once at 50 mm/hr and once at 200mm/hr.
                             Report as “50/200”
                             Filter depth (m)                                                 0.2
                             Overflow weir width (m)                                          20 m
                             Exfiltration rate (mm/hr)                                        180 mm/hr
                             If an exfiltration rate has been used, have node water           n/a
                             balance losses been used in calculation of treatment
                             train effectiveness? (Y / N / N/A)
                             If exfiltration rate has been used, is the exfiltration rate     Y
                             justified (Y / N / N/A)
                             Confirmation that K and C* remain default? (Y/N)                 Y




                  Table B13 Stormwater quality modelling results reporting table
                          Catchm         Pollutant           Inflows        Outflow         Reduction     Reduction       Water
                           ent ID                             (kg/yr)       s (kg/yr)        (kg/yr)      achieved       Quality
                                                                                                             (%)        Objective
                                                                                                                           (%)
                          TOTAL             TSS             330             145             185           56%          n/a
                                             TP             0.79            0.22            0.58          73%          n/a
                                             TN             7.3             1.9             5.5           74%          n/a




                                                                                                                Print Date: 2 March 2020, 2:19 PM

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Storm Water management plan.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.