Council archive · source document
Storm Water management plan · MCU12/0133.03
Plans and drawings: the text below has words only, no drawings.
Noosa Council documents
Bligh Tanner Consulting Engineers Page ii
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012
TABLE OF CONTENTS
EXECUTIVE SUMMARY ...................................................................................................... IV
GLOSSARY .......................................................................................................................... V
1 INTRODUCTION ............................................................................................................. 1
1.1 Locality Plan ............................................................................................................ 2
1.2 Site Characteristics................................................................................................. 2
1.3 Proposed Land Uses .............................................................................................. 3
1.4 Location Conditions ............................................................................................... 3
1.5 Rainfall zone ............................................................................................................ 3
1.6 Soil Category ........................................................................................................... 3
2 DESIGN OBJECTIVES ................................................................................................... 5
2.1 Stormwater Treatment Objectives ......................................................................... 5
2.2 Hydrologic Objectives ............................................................................................ 6
2.3 Water Savings Targets ........................................................................................... 6
2.4 Construction Phase Objectives ............................................................................. 7
Erosion Hazard Assessment ........................................................................................... 7
3 STRATEGY DESCRIPTION AND PLAN ........................................................................ 8
3.1 Erosion and Sediment Control Strategy................................................................ 9
3.2 Stormwater Treatment Strategy ............................................................................. 9
4 STORMWATER QUALITY ASSESSMENT................................................................... 11
5 HYDROLOGIC ASSESSMENT ..................................................................................... 14
5.1 Flooding of the site ............................................................................................... 14
5.2 Flooding impacts downstream of the site ........................................................... 14
5.3 Frequent flow impacts downstream of the site ................................................... 16
6 IMPLEMENTATION ...................................................................................................... 17
6.1 Construction.......................................................................................................... 17
7 CONCLUSION .............................................................................................................. 18
8 REFERENCES .............................................................................................................. 19
List of Figures
Figure 1 Locality Plan showing the site in relation to relevant receiving environments ........... 2
Figure 2 Site plan showing relevant features of the stormwater strategy .............................. 10
Figure 3 MUSIC model schematic........................................................................................ 12
Figure 4: Comparison of runoff volumes and pollutant loads, which shows that the mitigated
pollutant loads are close to existing levels and well below a conventional ‘best-practice’
approach (note logarithmic scale). Actual values are presented in Table 6. ........................ 12
Figure 5 Catchment boundary and overland flow paths ....................................................... 14
Figure 6 Comparison of pre and post developed peak flows (without mitigation). The increase
in peak flow for the Q100 is about 140 litres per second. ..................................................... 15
Figure 7: Comparison of pre and post development flow frequency showing that the
proposed development avoids increasing the wetness of the downstream ecosystem......... 16
List of Tables
Table 1 Key site information.................................................................................................. 1
Table 2: Soil Properties estimated using the Atlas of Australian Soils .................................... 3
Table 3 How the proposal responds to the Noosa Plan.......................................................... 5
Table 4 Values used in erosion hazard estimation ................................................................. 7
Print Date: 2 March 2020, 2:19 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Storm Water management plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.