Engineering Drawings
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
Bio-Retention Basin Design BIORETENTION BASIN NOTES:
Bio-Retention detailed Design Calculations · VEGETATION TO COMPLY WITH THE REQUIREMENTS OF APPENDIX "A" OF "HEALTHY WATERWAYS WATER SENSITIVE URBAN DESIGN" TO LOAMY SOILS.
REFER TO LANDSCAPE ARCHITECTS PLANS FOR DETAILS.
Design Flow into Basin - Q3month
Filter Media Characteristics · FAWB (FACILITY FOR ADVANCING WATER BIOFILTRATION) ACCREDITED CERTIFICATION FOR FILTRATION MEDIA TO BE FORWARDED TO THE ENGINEER
(50% of Q1)
PRIOR TO PLACEMENT.
Filter Media Depth 0.8 m Contributing Catchment A= 0.255 ha ha
Filter Median Particle dia. 0.45-0.50 mm Runoff co-efficient C1 = 0.72 · SUBSOIL DRAINAGE PIPES TO BE UNSOCKED SLOTTED uPVC LAID AT 1:200 MINIMUM GRADE
Sat. Hydraulic Conductivity 180 mm/hr Recommended Time of Concentration tc = 5 min min
· ALL RIGHT ANGLE SUBSOIL PIPE BENDS ARE TO BE CREATED USING 2x 45° BENDS .
Rainfall intensity I1 = 127 mm/hr mm/hr
Filter Material Design Q1 = C1I1A Q1 = 0.065 cumecs cumecs · INSPECTION HOLD POINTS FOR BIORETENTION BASIN CONSTRUCTION ARE AS FOLLOWS.
Maximum filtration rate through filter media % of Q1 event Q3month = 50% 1. COMPLETION OF BULK EARTHWORKS.
2. COMPLETION OF SUBSOIL DRAINAGE SYSTEM.
Q=kAbase x [(hmax + d)/d] Equation 5.5 Q3month = 0.032 cumecs cumecs 3. COMPLETION OF COARSE SAND TRANSITION LAYER.
Saturated conductivity Ksat = 180 mm/hr Recommended 4. COMPLETION OF SANDY LOAM FILTRATION MEDIA LAYER.
= Ksat = 0.00005 m/s Overflow Pit/Weir size
· FLUSH OUT POINTS ARE TO BE FITTED WITH A FIXED INSPECTION OPENING CAP. SCREW ON CAPS ARE NOT ACCEPTABLE.
Basin Area Abase = 28 m2 Q = CwLH3/2
Max. ponding depth hmax = 0.3 m Outlet is sized for Q1 ARI · SANDY LOAM FILTRATION MEDIA LAYER IS TO BE PROTECTED BY A GEOFABRIC LAYER WITH 75mm TOPSOIL AND TURFED FOR THE DURATION OF
Filter media depth d= 0.8 m Q1 - Q3month Q = 0.032 Cumecs Cumecs CONSTRUCTION OR APPROVED EQUIVALENT .
Q = 0.002 cumecs Max Weir flow depth h= 0.1 m m
Q = 1.9 L/s Weir Co-efficient Cw = 1.66 SCREW CAP AND CONCRETE SURROUND
Blockage Factor B= 0.5 FLUSH OUT POINT. 45° BEND. REFER
Flow Capacity of Pipe Perforations Weir Width Required L= 1.2 m m IPWEA STD DWG WSUD-003
Based on Vinidex uPVC pipe Assuming square pit sides are = 0.3 m m
Perforated pipe Adopting 100 mm
Clear opening = 2100 mm2/m Outlet Pipe Design 3
Slot Width = 1.5 mm Q= (1/n)AR2/3S1/2 1
Slot Length = 7.5 mm Mannings roughness n= 0.015 BASIN SL 5.30
Blockage Factor = 50% Pipe slope S= 0.01 m/m m/m
No. of slots per meter = 93.3 Pipe diameter d= 0.1 m m
Area of Slots per meter = 1050 mm2/m Pipe Area A= 0.008 m2 m2
Hydraulic Radius R= 0.025
Q=B Cd A (2gh)^0.5 Equation 5.6 Pipe Flow Q= 0.004 cumecs cumecs
GEOTEXTILE CLASS B
Blockage factor B= 50% Q= 4.5 l/s l/s
Orifice edge factor Cd = 0.6 Recommended Based on Bio-Ret filter media
Gravity g= 9.81 m/s2 Required pipe capacity Q= 1.9 l/s l/s
Max ponding ht over pipe h= 1.1 m OK
Area of slots per meter A= 0.00105 m2
100Ø uPVC SLOTTED PIPES FALLING TO
Flow capacity /m of pipe Q = 0.0015 cumecs
STORMWATER PIT AT 0.5% GRADE
per m of pipe Q = 1.463 l/s
TYPICAL CLEANOUT POINT DETAIL
Area conveyed by one 100mm dia pipe. SCALE 1:20 A1
L=Q/(kW[(hmax+d)/d]
Spacing between pipes W = W= 1.5 m
BLOCKWORK RETAINING
Q= 0.0015 cumecs FILTER MEDIA WALL REFER STRUCTURAL
BLOCKWORK RETAINING WIDTH VARIES
Length of Pipe L = L= 14.2 m DWGS FOR DETAILS
WALL REFER STRUCTURAL
Max Area serviced / pipe = = 21.3 m2 DWGS FOR DETAILS
[email protected]
Area of Bio-retention basin = = 28 m2
3
No of pipes required = = 2
1
300 MIN.
Flow Capacity of Trunk Pipe
VEGETATION TO COMPLY WITH THE
(For pipe flowing full but not under head) REQUIREMENTS OF APPENDIX A OF
Q= (1/n)AR2/3S1/2 'HEALTHY WATERWAYS WATER SENSITIVE
Mannings roughness URBAN DESIGN' TO LOAMY SOILS.
n= 0.017
500 MIN.
Pipe Slope S= 0.005 m/m SANDY LOAM HYDRAULIC CONDUCTIVITY 200mm/hr
Pipe Diameter d= 0.1 m IN ACCORDANCE WITH 'GUIDELINE SPECIFICATION
Pipe Area A= 0.008 m2 FOR SOIL MEDIA IN BIORETENTION SYSTEMS,
FACILITY FOR ADVANCING WATER BIOFILTRATION'
Hydraulic Radius R = A/P = 0.0250
SOIL ORTHOPHOSPHATE CONTENT NOT TO
MIN
MIN 100
Q= 0.003 cumecs EXCEED 50mg/kg. CERTIFICATION TO BE PROVIDED.
Q= 2.8 l/s
200
TRANSITION LAYER
Based on Bio-Ret filter media
Required pipe capacity Q= 1.9 l/s 5mm SCREENINGS
OK DRAINAGE LAYER
100Ø SLOTTED uPVC PIPE DISCHARGE TO
INLET PIT. PROVIDE 100mm DIA CAPPED uPVC
FLUSH OUT POINTS AT 10.0m (MIN) CTS.
TYPICAL BIORETENTION BASIN SECTION
N.T.S.
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
SWT PROJECT: DRAWING TITLE:
ALTA PROJECTS
Drawn: SWT
A.B.N. 611355330 STORMWATER QUALITY BIO BASIN CALCULATIONS AND DETAILS
FOR APPROVAL Date: DEC 2017 26 Memorial Avenue, Cotton Tree PROPOSED COMMERCIAL DEVELOPMENT
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
C 28/01/2021 ISSUE FOR APPROVAL S.T. S.R. Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 30-32 DOONELLA STREET, TEWANTIN QLD DRAWING No:
A6035/21/WQ02 C 2 of 2
B 27/01/2021 ISSUE FOR APPROVAL S.T. S.R. STEPHEN ROBERTS
Email: [email protected]
A
1
21/01/2021
18/01/2021
ISSUE FOR APPROVAL
CO-ORDINATION ISSUE
S.T.
S.T.
S.R.
SR
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for DONNELLA STREET PTY LTD
REV DATE DESCRIPTION BY CHKD RPEQ - 7665 A1 SHEET SIZE FILENAME : A6225 - WS02 STORMWATER QUALITY BIO BASIN CALCULATIONS.dwg - DATE : 28/1/21 - 4:32pm - XREF's: H-Approved-SR; H-Checked-SR Council Ref: ...................
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Engineering Drawings.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.