Council archive · source document
0015911C.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 ___ IDAS Assessment Checklist, Version 20, 2April2007, .
‘Integration offland'use and.public — }22. ‘The application involves: (tick the applicable box/es)— “
Tao ain referto Guide:23," schedule [_] (i) a material change of use assessable against the planning scheme for a purpose
"BAof the IPA, & schedule 2iof the IP: Regulation. mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
" ‘Unless you answered “none of the above", tie” -. schedule. .
, application: triggers yeferraltoQT.asa,: "3 . . ‘
concurrence agency: 2 tL) (ii) reconfiguring a tot— .
Soo pes PD] (J (a) on land that is completely or partly within a public transport corridor, and the
;: 73 total number of lots increases; ;
i us (C1 (b) on tand that is completely or partly within a future public transport corridor or
qd an airport's public safety area; ,
my (1 (c) — ontand that is within 400m of a public passenger transport facility or a future
oo oo public passenger transport facility, and the total site area is 5000m? or greater;
Te jo - (J(d) for a residential purpose within the 25 ANEF contour for an airport; .
[J (e) for a residential purpose resulting in 100 or more allotments.
: CO iii) operational work assessable against the planning scheme, but not associated with a
oe 4 _ Material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) .
mo _ above, on land that—
oo , (J (a) is completely or partly within a public transport corridor or a future public
oo transport coridor; ;
7 [] (b) will result in work that encroaches into an airport's operational airspace.
a civ none of the above. § ‘ .
Railway safety arid efficiency 23. The application involves: (tick the applicable box/es)—
For more information refer to Guite 23, sthedie (7) (i) a material change of use assessable against the planning scheme for a purpose
Sof the IPA & schedule 2 ofthe [P Regulation ” mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
Unless you‘answered “none of the above’, the .
“application tiggers.referraltoOTasa:- . schedule.
"concurrence agency. fF ] (ii) reconfiguring a lot— , ,
SO PR TR ([] (a) on land that is completely or partly within a future public transport corridor,
cat ie re age Da ___ future railway land or a railway tunnel easement;
eT [J (b) on land that is within 400m of-a Citytrain passenger railway station or afuture
fer ge We See te '« Citytrain passenger railway:station,<and the total site areais. 5000m? or .
fs PR greater; sO ;
PO en : [J (c) ‘on land that abuts rail corridor land, commercial corridor land or future railway .
Co alien land, and the total number of lots increases;
a ~ [1 (qd) on tand:that abuts rail corridor land, commercial corridor land or future railway
: Pot Me PO land and an easement abutting the corridor or future railway landis created;
va a | . [_J](e) on land that is completely or partly within 100m of, and abutting an approach
ee ee ne to, a railway level crossing, and the total number of lots increases;
oh 4 pee C1 (f) for a residential purpose resulting in 100 or.more allotments.
Te See a vs" cel. [7] (iil) operational work assessable against the planning scheme, but not associated with a
rr rs material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) @
ee , above, involving extracting, excavating or filling greater than 50m, on land that—
So (1 (a) is completely or partly within rail corridor land or commercial corridor fand, and
oe ee : the work is not for rail transport infrastructure or other rail infrastructure;
we Me | (1 (b) is completely or partly within future railway land, or a railway tunnel easement;
Ce Be ey Lee LJ (c) abuts rail corridor land, commercial corridor land or future railway land, and
ate ee Be the work is within 25m of the railway boundary.
ee Ryn none of the above.
:Moonieito Brisbane pipeline... -- -|24. The application involves the easement for the construction or operation of the Moonie to
"For more information refer to schedule of theIP] . Brisbane strategic pipeline, and involves: (tick the applicable bowes)—
eee ae nasi bah oe tk i L] (i) a material change of use assessable against the planning scheme and not associated
“applicaton viggersreferal tothe holder of” with reconfiguring a lot, and any structure or work will be located wholly or partlyin the
‘pipeline licence No.1 issued.under the Petroleum easement. _
“Act 1923, curently Santos QNT.RY Ltd for’, =|] (ii) reconfiguring a lot —
Oe "+ s “) * [') (iii) operational work assessable against the planning scheme, that is filing, excavation, .
von. Lo 4 compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
oT fo ; work is located wholly or partly in the easement.
Pa iw none ofthe above. = co
. _ Pages : .See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015911C.001.pdfRelated documentPublic source context ↗
07/1451 - MCU - entertainment & Dining Business Type 2 - Amusement [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.