Council archive · source document
0015911C.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
. , . . . . . o* me ve = + - oe a, . >
INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 20, 2 April’2007 ”
" 'State-controlled:roadimatters:,:". 12. The application involves: (tick applicable box/es) “4 ;
-For.more'information'refer'to‘Guide3.-' . .
ono eee eee = Se2=2., "| 7] (i) development on land contiguous' to a State controlied road and for -
‘Unless you answered *none of the above" to Q2,; ; ; os ,
‘the application ‘triggers feferral to.the Department J (a) material change of use assessable against the planning scheme:
-otiain Roads (OMR) as‘a,efertal agency: | ~ : [[) (b) reconfiguring alot unless -
of Main MR) asia referté noe . .
‘Uncertain circumstances DMR will be an advice . . .
‘agency, while in other circumstances DMR will « the total number of lots is not increased; and
“bea concurrencesagency. « the total number of lots abutting the State-controlled road is not increased;
. Soni ert eeeautaton assist you to ~=6rd BD) operational work (not associated with a material change of use assessable against the
__ coneurrence agency-for: the:application, _ planning scheme or reconfiguring a fot mentioned in {b) above)- , .
Bs | * ¢ associated with access to a State-controlled road; or
: 2, we « for filling or excavation; or - :
ot ag * involving the redirection or intensification of site stormwater from the land, through a
ce Fe pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a ,
mo, bo , ~ ' State-controlled road. ;
et a [_] (ii) development on land not contiguous to a State-controlled road and-
ae tT - C1 (a) material change of use - oe . -_
Ten pma e seere 9 re ere “~~~ *". ¢ assessable against the local government's planning scheme; and ;
. oo. oe ‘_ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
Sn Fe, . that schedule; : .
ae Te L] (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
ot re ‘and exceeding the thresholds set by that schedule, :
a / ; (J (c). operational work (not associated with a material change of use assessable against ro®
Ee planning scheme or reconfiguring @ lot mentioned in (b) above) s
oa Ew A .¢ assessable against the local government's planning scheme; and
DE GR «* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
Ori yg a fe nc te fa that schedule.
Secu ee uk LL cul Yi) none of the above
‘Clearing vegetation.“ - . . -|3, The application involves: (tick applicable bowes)
“For.more information refer to Guide 12. | [} (i) material change of use - ”
"Unless you answered *none-of the abové"-t0'Q3,, .
the avalon teeuibeteeegrent bye. my (a) assessable against the planning:scheme; -
Department ofiNaturat Resources and Water (b) on a lot containing -
EINRW)
‘fan agency other than NRW is the assessment. « acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
;Manager for the application, NRWisa... « if there is no property map of assessable vegetation for the lot - remnant vegetation; .
+ paaauTenes aoency forthe application relation) (c) - where the existing use of the land is a rural or environmental use; and ae
' ifyoutticked '(Q3() or (i); four application requires| (d) where the size of the land is 2 hectares or larger - complete Part J of Form?
referral to NRW for:assessment regardless of ~*~: CJ (ii) reconfiguring a lot - a ,
- whether-vegetation clearing:{s proposed ‘of:not.. . : . . . / . :
yoo {a) on alot containing a category 1, 2 or 3 area shown on a property map of
. poo peak oer td . - assessable vegetation or, if there is no property map of assessablé vegetation for
ES os ¢ the lot, remnant vegetation; ©
CR a ya Sead (b) where the size of the lot before the reconfiguration is 2 hectares or larger;
ce Ep ES Sata] (c) where 2 or more lots are created; and
SEE nr eae {d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1 .
oe Bo ppt See [J {iii} operational work - —_
Ee gy eat Un eS (a) for the clearing of native vegetation where the vegetation clearing is made
eS Cer Ae assessable under Schedule 8 of the IPA; and a so
Ds rr re (b) not associated with a material change of use assessable against the planning |
” oe eR ; scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part Jof
: eo / we E / Form 1 . x .
ae a (iv) none of the above. a .
‘Strategicportiand: =. 4. ‘The application involves: “
i, saitet(h beecanter nae} viel [1 {i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (T|
‘i you ticked (i). the relevant Port Authority is the .
~ ‘assessment manager forthe appicaton | — Act) complete Part { of Form 1 . ; .
‘Wyouticked (i) Queensland Transportis’a- CJ (ii) a material change of use that is inconsistent with the land use plan approved under the
. : Concurrence agency:for.the, application...” =. TI Act-for the strategic port land - complete Part { of Form 4 .
po wo ea 61 (ii) none of the above . , oo
. 4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlted road; or that is pert of a future State- * oo.
* controlled road, toe . oo te > : : .
. Page 2°. . : , -See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015911C.001.pdfRelated documentPublic source context ↗
07/1451 - MCU - entertainment & Dining Business Type 2 - Amusement [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.