07/1173 - Information Request from Referral Agency - EPA [As Published] · 142007.1173

of 5

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

ecoaccess

environmental licences and permits

   
   
 
 
 

“he “SN
lotice ° éf Information request -

PAvas Goncurrence Agency

 

FAXED

This notice is issued by the Environmental Protection Agency to advise of a requirement to provide additional information
under Section 3.3.6 of the integrated Planning Act 1997

Heritage Jettiés Pty Ltd

 

C/- MartooConsulting Pty Ltd

PO Box 08 i Cle

NOOS. oy HEXDS QLD 4567 Chief Executive Officer
Attention: Aannah Blue Noosa Council
You/Ref 00753 LO8 HB : : PO Box 141

TEWANTIN QLD 4565
Attention: Denis Wallace
Your Ref: 2007/1173

Our reference: 313048 and BNE21026

Dear Ms Blue
Re: Your application for development approval from the Environmental Protection Agency (EPA).

Your application was received by this office on 13-JUL-2007and has been given the Project Reference Number
of 313048.

Permit Type: Concurrence Response for Operational Work
Activity: ’ Prescribed Tidal Work for the refurbistiment of a boathouse and jetty
Act: Integrated Planning Act 1997 and the Coastal Protection and Management Act 1995
Location: 172 Gympie Terrace, Noosaville (Lot 164 Plan CP907410)
Jetty Number 17,NOOSAVILLE QLD 4566

The EPA has now considered the information provided in support of your application, and determined that there
is insufficient information to complete a proper assessment. The additional information required by the EPA to
further consider your application is outlined in the attached Information Request.

Under the Integrated Planning Act 1997 Section 3.3.8(1), an applicant receiving an information request from the
assessment manager or concurrence agency (the “requesting authority”) must respond by giving the
tequesting authority - .

(a) all of the information requested; or :

(b) part of the information requested together with a notice asking the requesting authority to proceed with the
assessment of the application; or

(c) anotice -
(i) stating that the applicant does not intend to supply any of the information requested; and
(ii) asking the requesting authority to proceed with the assessment of application.

 

‘ Permit includes licences, approvals, permits, authorisations, certificates, sanctions
or equivalent/similar as required by fegislation administered by the
Environmental Protection Agency and the Queensland Parks and Wildlife Service

Environmental Protection Agency Queensland Government

Envi tal Protection
www.epaqid.gov.at asn 67 221 158 706 . Queenstand Parks and Siridife Servico
Full text of the other 4 pages

Page 2

ecoaccess

environmental licences and permits

Under ‘Section 3.2.12(2)(b), the application lapses if the applicant does not respond to the information request
within 12 months. :

A response to the information request should be posted to lan Biggs, the Project Manager, at the address below.
Please do not hesitate to contact lan Biggs, on the telephone number listed below if you wish to discuss any of
these issues or if you require any further information.

Yours sincerely

KX. heat

Rod Kent Enquiries:
Manager SouthReg Env Ops (Brisbane) Coastal

Environmental Operations Southern Region PO Box 15155

Environmental Protection Agency Phoae “on raed 9 09

Fax: (07) 3221 0768
09-AUG-2007

Attachment ~ Information Request

Page 3

ecoaccess

environmental licences and permits

Information Request

EPA Project Reference Number: 313048

Date of Request: ‘09-AUG-2007

Permit Type: Concurrence Response for Operational Work
Activity: Prescribed Tidal Work for the refurbishrent of a boathouse and jetty
Act: Integrated Planning Act 1997 and the Coastal Protection and Management Act 1995
Location: 172 Gympie Terrace, Noosaville (Lot 164 Plan CP907410)
Jetty Number 17,NOOSAVILLE QLD-4566

Coastal Management Concérns.

In this area, the landward boundary of the coastal management district adjacent to the Noosa River lies either at
the plan position of Highest Astronomical Tide or 40 metres inland from the plan position of Méan High Water
Spring Tide, whichever produces the larger coastal management district.

With regard to the existing development you are advised that:- /
1. This Agency's records indicate that approvals were given pursuant to the provisions of section 86 of
the Harbours Act 1955 on:-

(a) 10 September 1970 for the construction of a jetty. CD
(b) 22 June 1978 for the construction of a timber building.
These approvals are now deemed as development approvals under the Integrated Planning Act 1997.

2. It would appear that the existing boat ramp, hinged aluminium ramp and PVC modules may not be
lawful works.

3. There may be potential public safety issues relating to public access to potentially unlawful works.

Biodiversity/Environmental Planning Concerns

The photographs and drawings of the proposed jetty reconstruction provided in the application documentation
show that the jetty size will increase considerably. The Noosa River is listed in the Directory of Important
Wetlands and the EPA does not support an increase in the intensity of use of the area that may result in impacts
on the waterway, in particular, dredging to accommodate larger vessels.

EPA could only support the application providing that the proposed tidal works are restricted to the improvement
of facilities to cater for the existing level of use, in terms of vessel size and number.

Page 4

“"’ " ecoaccess

environmental licences and permits

Information required:

1. 2 copies of Drawings, signed by the Registered Professional Engineer of Queensland who is
responsible for the design of the works. These drawings are required to clearly define the type,
location and extent of the works for which a development approval is sought. The drawings
submitted should, as a minimum requirement:

~ show the current real property description and rea! property boundaries of the property which
would abut the proposed works and the tidal land on which the works would be constructed if
there is a current tenure over this tidal land. (The metes and bounds description of real property
boundaries shown must be marked on these boundaries.)

- ~ show the current location of MHWS on a plan view of the site

- clearly define:

o the works for which approval i is sought (These works would include existing works
which are to be removed.) :

© all approved works on the waterfrontage of the property which would abut the
proposed works, whether they have been constructed or not

o alt existing unapproved works on.the waterfrontage of the property which would abut
the proposed works, which are not included in the works for which approval is sought

— not show proposed works which are not included in the works for which a permit is sought

— show the location dimensioned with respect to real property boundaries of:
© the proposed-works for which approval is sought

o existing works on the waterfrontage of the property which would abut the proposed
works, which are not included in the works for which approval is sought

o existing works on adjacent properties where these works are within 20m of the works
for which approval is sought

— show the full dimensions in plan view of:
o the proposed works for which approval is sought

o existing works on the waterfrontage of the property which would abut the proposed
works, which are not included in the works for which a permit is sought

o existing works on adjacent properties where these works are within 20m of the works
for which approval is sought

= indicate the constructional details of the proposed works

- show the finished levels of the works (including pile head levels)
- show the levels of LAT, MHWS, HAT |

- show the design criteria for the proposed works

~ show the datum for the levels shown

~ show design batter slopes where relevant

Page 5

* ecoaccess

environmental licences and permits

State coastal management plan. The EPA is responsible for administration of the Coastal Protection and
Management Act 1995 (Coastal Act), which includes the preparation of State and regional coastal!
management plans. The State Coastal Management Plan - Queensland’s Coastal Policy (2001) (State
Coastal Plan) provides a Statewide approach to coastal management within Queensland. The State Coastal
Plan commenced on 27 February 2002 and sets out the principles and policies to be applied to coastal
development.

2. Demonstrate that the proposal complies with the State Coastal Plan. In particular your attention is
drawn to policies:-
a. 2.1.5. — Maritime infrastructure .
b. 2.1.10 - Tourism and recreational activities

‘C. 2.2.2 — Erosion prone areas

information requested:

3. Please provide the nature of the vessels proposed to be moored at the facility and how they differ (in
size and number) from vessels under the existing use. .

Yours sincerely

Kk. bert

Rod Kent Enquiries:

lan Biggs, Senior Technical Officer
SouthReg Env Ops (Brisbane) Coastal
PO Box 15155

CITY EAST QLD 4002 _ .

Phone: (07) 3225 1209

Fax: (07) 3221 0768

Managet
Environmental Operations Southern Region
Environmental Protection Agency

09-AUG-2007

Used in these records

About this file

File size
198 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1173 - Information Request from Referral Agency - EPA [As Published].pdf · 198 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.