ecoaccess environmental licences and permits “he “SN lotice ° éf Information request - PAvas Goncurrence Agency FAXED This notice is issued by the Environmental Protection Agency to advise of a requirement to provide additional information under Section 3.3.6 of the integrated Planning Act 1997 Heritage Jettiés Pty Ltd C/- MartooConsulting Pty Ltd PO Box 08 i Cle NOOS. oy HEXDS QLD 4567 Chief Executive Officer Attention: Aannah Blue Noosa Council You/Ref 00753 LO8 HB : : PO Box 141 TEWANTIN QLD 4565 Attention: Denis Wallace Your Ref: 2007/1173 Our reference: 313048 and BNE21026 Dear Ms Blue Re: Your application for development approval from the Environmental Protection Agency (EPA). Your application was received by this office on 13-JUL-2007and has been given the Project Reference Number of 313048. Permit Type: Concurrence Response for Operational Work Activity: ’ Prescribed Tidal Work for the refurbistiment of a boathouse and jetty Act: Integrated Planning Act 1997 and the Coastal Protection and Management Act 1995 Location: 172 Gympie Terrace, Noosaville (Lot 164 Plan CP907410) Jetty Number 17,NOOSAVILLE QLD 4566 The EPA has now considered the information provided in support of your application, and determined that there is insufficient information to complete a proper assessment. The additional information required by the EPA to further consider your application is outlined in the attached Information Request. Under the Integrated Planning Act 1997 Section 3.3.8(1), an applicant receiving an information request from the assessment manager or concurrence agency (the “requesting authority”) must respond by giving the tequesting authority - . (a) all of the information requested; or : (b) part of the information requested together with a notice asking the requesting authority to proceed with the assessment of the application; or (c) anotice - (i) stating that the applicant does not intend to supply any of the information requested; and (ii) asking the requesting authority to proceed with the assessment of application. ‘ Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalent/similar as required by fegislation administered by the Environmental Protection Agency and the Queensland Parks and Wildlife Service Environmental Protection Agency Queensland Government Envi tal Protection www.epaqid.gov.at asn 67 221 158 706 . Queenstand Parks and Siridife Servico
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
ecoaccess environmental licences and permits Under ‘Section 3.2.12(2)(b), the application lapses if the applicant does not respond to the information request within 12 months. : A response to the information request should be posted to lan Biggs, the Project Manager, at the address below. Please do not hesitate to contact lan Biggs, on the telephone number listed below if you wish to discuss any of these issues or if you require any further information. Yours sincerely KX. heat Rod Kent Enquiries: Manager SouthReg Env Ops (Brisbane) Coastal Environmental Operations Southern Region PO Box 15155 Environmental Protection Agency Phoae “on raed 9 09 Fax: (07) 3221 0768 09-AUG-2007 Attachment ~ Information Request
Page 3
ecoaccess environmental licences and permits Information Request EPA Project Reference Number: 313048 Date of Request: ‘09-AUG-2007 Permit Type: Concurrence Response for Operational Work Activity: Prescribed Tidal Work for the refurbishrent of a boathouse and jetty Act: Integrated Planning Act 1997 and the Coastal Protection and Management Act 1995 Location: 172 Gympie Terrace, Noosaville (Lot 164 Plan CP907410) Jetty Number 17,NOOSAVILLE QLD-4566 Coastal Management Concérns. In this area, the landward boundary of the coastal management district adjacent to the Noosa River lies either at the plan position of Highest Astronomical Tide or 40 metres inland from the plan position of Méan High Water Spring Tide, whichever produces the larger coastal management district. With regard to the existing development you are advised that:- / 1. This Agency's records indicate that approvals were given pursuant to the provisions of section 86 of the Harbours Act 1955 on:- (a) 10 September 1970 for the construction of a jetty. CD (b) 22 June 1978 for the construction of a timber building. These approvals are now deemed as development approvals under the Integrated Planning Act 1997. 2. It would appear that the existing boat ramp, hinged aluminium ramp and PVC modules may not be lawful works. 3. There may be potential public safety issues relating to public access to potentially unlawful works. Biodiversity/Environmental Planning Concerns The photographs and drawings of the proposed jetty reconstruction provided in the application documentation show that the jetty size will increase considerably. The Noosa River is listed in the Directory of Important Wetlands and the EPA does not support an increase in the intensity of use of the area that may result in impacts on the waterway, in particular, dredging to accommodate larger vessels. EPA could only support the application providing that the proposed tidal works are restricted to the improvement of facilities to cater for the existing level of use, in terms of vessel size and number.
Page 4
“"’ " ecoaccess environmental licences and permits Information required: 1. 2 copies of Drawings, signed by the Registered Professional Engineer of Queensland who is responsible for the design of the works. These drawings are required to clearly define the type, location and extent of the works for which a development approval is sought. The drawings submitted should, as a minimum requirement: ~ show the current real property description and rea! property boundaries of the property which would abut the proposed works and the tidal land on which the works would be constructed if there is a current tenure over this tidal land. (The metes and bounds description of real property boundaries shown must be marked on these boundaries.) - ~ show the current location of MHWS on a plan view of the site - clearly define: o the works for which approval i is sought (These works would include existing works which are to be removed.) : © all approved works on the waterfrontage of the property which would abut the proposed works, whether they have been constructed or not o alt existing unapproved works on.the waterfrontage of the property which would abut the proposed works, which are not included in the works for which approval is sought — not show proposed works which are not included in the works for which a permit is sought — show the location dimensioned with respect to real property boundaries of: © the proposed-works for which approval is sought o existing works on the waterfrontage of the property which would abut the proposed works, which are not included in the works for which approval is sought o existing works on adjacent properties where these works are within 20m of the works for which approval is sought — show the full dimensions in plan view of: o the proposed works for which approval is sought o existing works on the waterfrontage of the property which would abut the proposed works, which are not included in the works for which a permit is sought o existing works on adjacent properties where these works are within 20m of the works for which approval is sought = indicate the constructional details of the proposed works - show the finished levels of the works (including pile head levels) - show the levels of LAT, MHWS, HAT | - show the design criteria for the proposed works ~ show the datum for the levels shown ~ show design batter slopes where relevant
Page 5
* ecoaccess environmental licences and permits State coastal management plan. The EPA is responsible for administration of the Coastal Protection and Management Act 1995 (Coastal Act), which includes the preparation of State and regional coastal! management plans. The State Coastal Management Plan - Queensland’s Coastal Policy (2001) (State Coastal Plan) provides a Statewide approach to coastal management within Queensland. The State Coastal Plan commenced on 27 February 2002 and sets out the principles and policies to be applied to coastal development. 2. Demonstrate that the proposal complies with the State Coastal Plan. In particular your attention is drawn to policies:- a. 2.1.5. — Maritime infrastructure . b. 2.1.10 - Tourism and recreational activities ‘C. 2.2.2 — Erosion prone areas information requested: 3. Please provide the nature of the vessels proposed to be moored at the facility and how they differ (in size and number) from vessels under the existing use. . Yours sincerely Kk. bert Rod Kent Enquiries: lan Biggs, Senior Technical Officer SouthReg Env Ops (Brisbane) Coastal PO Box 15155 CITY EAST QLD 4002 _ . Phone: (07) 3225 1209 Fax: (07) 3221 0768 Managet Environmental Operations Southern Region Environmental Protection Agency 09-AUG-2007
Used in these records
07/1173 - Information Request from Referral Agency - EPA [As Published]Related documentApplication case desk ↗
About this file
- File size
- 198 KB (small file)
- File type
No other editions are linked here.